Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Repairs of Brunswick Mining, Smelting and Fertilizer concentrate and bulk handling system

    By D. T. Aikens, R. Gaudreault

    "This paper summarizes structural repairs carried out on a marine wharf consisting of six 13.7 m by 13.7 m reinforced concrete cribs linked together by five 14.6 m long beam spans. As a result of prob

    Jan 1, 1988

  • CIM
    Nuclear Fuel Resources and Price Trends

    By D. D. Bell

    This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr

    Jan 1, 1967

  • CIM
    The Bullmoose Mille Project

    By R. Drozd

    "The Bullmoose Mine is currently under construction in the North East Coal area of British Columbia, and approximately $300 million will be spent to bring this 2.3 million-tonnes-per-year metallurgica

    Jan 1, 1983

  • CIM
    Mine roof bolt load determinations utilizing ultrasonic measurement systems

    By S. C. Tadolini

    "Roof bolts are the primary means of roof support in underground mines in the United States. Presently, post installation loads are measured on about 10% of the expansion anchor and combination bolts

    Jan 1, 1990

  • CIM
    International Geological Correlation Programme (IGCP) Project 502: Global Comparison of Volcanic-hosted Massive Sulphide (VMS) Districts: The controls on distribution and timing of VMS deposits

    By Rodney Allen

    Background: Development of the Project ?European GEODE collaboration 1999: considers possible projects, including a VMS project, to continue after GEODE ?GEODE-CODES-Canada collaboration 1999: Quest

    Apr 1, 2005

  • CIM
    Canadian Exploration Incentive Program

    By Robert B. Parsons

    "The Canadian Exploration Incentive Program (CEIP), which was announced by the federal government on May 3, 1988, promises to maintain the viability of flow-through shares as a financing mechanism whi

    Jan 1, 1988

  • CIM
    Frozen Backfill for Underground Mine Applications

    By Daniel Cluff

    Frozen backfill for mining operations in permafrost must be delivered in such a state so as not to thermally impose on the host rock surrounding the filled stope. The placement process, the material s

    Oct 1, 2010

  • CIM
    Computer design of underground mine dewatering systems

    By E. M. De Souza, R. Penner

    "Water is encountered at the majority of underground mines, both over their lifetime and during each stage of development and production. The dewatering system is one of the most important and costly

    Jan 1, 1993

  • CIM
    The Intec Gold Process - A Halide-Based Alternative for the Recovery of Gold from Refractory Sulphide Deposits

    By D. Sammut, F. Houllis, J-L. Huens, J. Moyes

    The Intec Gold Process has been developed as a halide-based alternative for the recovery of gold from refractory sulphide deposits. The halide medium allows sulphide oxidation and gold extraction to b

    Jan 1, 2005

  • CIM
    Modelling of an Open Mill with Scalped Feed for the Maximum Production of a Desired Particle Size Range

    By Ngonidzashe Chimwani, David Glasser, Diane Hildebrandt

    "Milling circuits play an important role in achieving the desired product; tonnage, size distribution and properties, since they are directly linked to the comminution energy consumption for the whole

    Jan 1, 2016

  • CIM
    Geochemical profile of till from Longlac, Ontario to Somerset Island

    By William W. Shilts

    "In carrying out a geotechnical survey of a proposed gas pipeline route from the Arctic Islands south to Longlac, Ontario, the Polar Gas Consortium contracted the drilling of several hundred 2- to 2D-

    Jan 1, 1980

  • CIM
    Fluid Flow of Shirahama Sandstone on Laboratory Permeability Test and Numerical Approach by LBM under Stressed Condition to 25MPa

    By Naoki Takada, Dae-Sung Cheon, Minoru Sato, Masaji Kato, Manabu Takahashi, Weiren Lin

    "The permeability and specific storage of rocks and sedimentary layers deep underground are critical parameters for issues related to the buried evaluation of natural gas and oil, CO2 aquifer storage,

    Jan 1, 2015

  • CIM
    The Phase Changes of SAE 2345 Steel

    By A. Dubé

    Introduction It is common experience that on re-heating a fully martensitic steel below the Ac, point, a softer and tougher structure is formed as the tempering temperature is raised. The mechanism

    Jan 1, 1946

  • CIM
    A rational approach to underground roadway lighting

    By D. A. Trotter

    "Low-pressure sodium light sources have been available for several years, but have not received wide acceptance in underground mining. This is because they are difficult to operate using DC power, the

    Jan 1, 1982

  • CIM
    Precious metals scavenging at Equity Silver Mines Limited

    By P. B. Marchant

    "Considerable gold and silver values are lost to flotation tailing from both the South ern Tail orebody and the Main Zone orebody,The underlying mineralogical assemblage of the two ore types is quite

    Jan 1, 1986

  • CIM
    Hydrometallurgical Processing of Old Flotation Tailings

    By V. S. Melamud, A. G. Bulaev

    "Sulfide ore processing is characterized by significant losses of metals, for example, with flotation tailings. Therefore, flotation tailings can present an important source of metals. The treatment o

    Jan 1, 2016

  • CIM
    Design and Construction of Mineral Processing Plants using Project Management

    By A. J. Williams

    "Whenever a decision is made to bring a mineral deposit into production, the Owner in actual fact has decided to convert substantial sums of capital into productive capacity with the intenti6n of maki

    Jan 1, 1974

  • CIM
    Characterization and Disposal of Radioactive Effluents from Uranium Mining

    By D. Moffat

    Rio Algom Limited has mined uranium at Elliot Lake, Ontario for 20 years. The production of this energy-generating element results in the need to dispose of low-level radioactive solid wastes and liqu

    Jan 1, 1979

  • CIM
    Mineral Decomposition and Leaching Processes for Treating Rare Earth Ore Concentrates

    By C. Edwards

    "The processes for rare earth (RE) extraction include the decomposition of RE ore concentrate minerals, and the concurrent or subsequent leaching of the rare earth elements (REEs) from the decomposed

    Jan 1, 2012

  • CIM
    The Snow Lake Concentrator

    By J. W. Stickney

    "On July 1, 1977 Hudson Bay Mining and Smelting Company Limited announced the commencement of construction of a 3800 ton per day concentrator at Snow Lake, Manitoba. Snow Lake, a community of 2200 peo

    Jan 1, 1981