Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Agglomeration for Copper Heap Leaching (2007)

    By K. A. Lewandowski

    Agglomeration of ore used in heap leaching allows for the immobilization of fine particles that would otherwise migrate and cause permeability problems in the heaps. For copper ore, binders are needed

    Jan 1, 2007

  • CIM
    A New Particle-Bubble Attachment Timer as a Quick Diagnostic Tool for Mineral Floatability Testing

    By N. Schreithofer, M. Aspiala, R. Serna

    The novel attachment timer apparatus presented in this paper serves as a diagnostic tool that allows the detection of changes in bubble-particle attachment probability and therefore floatability cause

    Jan 1, 2017

  • CIM
    Application of a New Mineral Separation Process the MC Process

    By W. S. Urbanski, A. L. Devernoe, R. W. Stuart, M. S. Walker

    "Although many investigators have successfully achieved separations using variations of a concept wherein particles are buoyed upwards against gravity in a magnetically attracted fluid, none have succ

    Jan 1, 1985

  • CIM
    Mine plant engineering industry/education review

    By D. H. Wilson

    "This paper examines the increasing need for mechanical-electrical people within the industry and some of the reasons why such a shortfall exists. It is suggested that, in part, it is image related. T

    Jan 1, 1981

  • CIM
    Less conventional methods for mining underground coal

    By Richard J. Kolada, Ian R. Muirhead

    "This paper reports on a CANMET-funded examination of less conventional underground coal mining methods. These methods are documented and those that show the most promise for application to western Ca

    Jan 1, 1988

  • CIM
    d) Aker flotation machines:

    By G. Langlands

    "R. Tenbergen Is this flotation machine suitable in the flotation ofInco ball mill discharges where we have a coarse feed at 60% solids?Reply Experience has shown that there is not a significant incre

    Jan 1, 1984

  • CIM
    Fleet Management System for Underground Mines

    By Michel Gamache

    This paper describes a system that manages and assigns vehicles in real-time in an underground mine. Each dispatching decision takes into account the traffic on the road segments of the mine network,

    May 1, 2001

  • CIM
    Operating Experience Recovering Acid And Copper At The Phelps Dodge El Paso Rod Mill Using Emew® Technology

    By D. P. Fenton

    The Phelps Dodge El Paso Rod Mill produces approximately 2.4 million pounds per day of copper rod from a casting and rolling operation. The newly formed rod is treated to remove mill scale and oxides

    Jan 1, 2007

  • CIM
    A Novel Sustainable Process for Anode Slime Purification

    By E. Roman E.

    A novel anode slime purification process was developed and tested at pilot scale in the Chuquicamata Refinery. The process consists of three main stages: First, an atmospheric alkaline leaching at 90°

    Jan 1, 2007

  • CIM
    The Influence of the Fe3+/Fe2+ Redox Couple on the Chalcopyrite Leacidng

    By E. M. Córdoba

    The effect of the Fe3+ lFe2+ redox couple on the chemical and biological dissolution of chalcopyrite was studied. All the tests were carried out in stirred flasks with 100 mL of a ferric/ferrous sulph

    Jan 1, 2007

  • CIM
    Coal Reclamation from the Summit Mine Dump (Paper No. 13 )

    "Background:The recorded coal production in Nova Scotia from 1863 to 1980 was 390, 000, 000 short tons. This extraction was associated with an estimated 60,000,000 short tons of discarded material. Th

    Jan 1, 1983

  • CIM
    The Metso MP1250 Cone Crusher – Two Case Studies (f0f34b8b-9322-405b-9121-e0158cd99f3c)

    By S. Koski, M. Schmalzel, D. A. Jacobson, S. Crosby, P. Cook, M. Mular

    "Mining operations, whether new or existing, are constantly looking for ways to maximize production and improve energy efficiency, while keeping the footprint required to a minimum. The Nordberg MP125

    Jan 1, 2012

  • CIM
    Establishing Total Airflow Requirements for Underground Metal/Nonmetal Mines with Tier IV Diesel Equipment

    By J. D. Stinnette

    Traditionally, airflow requirements for diesel equipment operating in underground environments such as mines and tunnels were determined by multiplying the vehicle power by a ventilation rate that was

    Aug 1, 2013

  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Roasting, Fluidized-Bed Separation, And Hydrometallurgical Treatment of Waste Tantalum Capacitor to Recover Purified Tantalum

    By H. Tokuichi, H. Ohta, K. Sato

    A physical separation technique of tantalum capacitors from waste print circuit boards is in a development phase in Japan. A tantalum capacitor consists of an exterior coating of resin (epoxy resin) m

    Jan 1, 2014

  • CIM
    The Benefits of Autogenous Grinding Milling When Processing the Fort A La Corne Kimberlites

    By J. E. Danoczi

    Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne area kimberlite field in central Saskatchewan. The

    Nov 1, 2011

  • CIM
    The Cigar Lake Mining Test

    By Barry W. Schmitke, J. M. Marino

    "Cigar Lake Mining Corporation is presently operating an underground test mine in northern Saskatchewan, with a view to developing a high grade uranium deposit. The mining test is intended to demonstr

    Jan 1, 1992

  • CIM
    Impurity Effects on the Synthesis of Crystalline Scorodite

    By M. Abumiya, N. Onodera

    "The synthesis of large scorodite particles in non-ferrous metallurgical industries usually requires a high-cost operation involving heating and high-pressure autoclaving. To overcome these obstacles,

    Jan 1, 2012

  • CIM
    Fabrication of Porous Copper and Porous Copper Based Alloys with Controllable Pore Structure

    By Y. X. Li, L. R. Xiao, S. Gong, S. S. He

    Porous copper and porous copper based alloys with controllable pore structure have been manufactured successfully by sintering evaporation process. This process consisted of mixing copper or copper ba

    Jan 1, 2019

  • CIM
    Discrete Element Modeling of Transversely Isotropic Rock Applied to Foundation and Borehole Problems

    By Ki-Bok Min, Bona Park

    "In spite of the applications of DEM models to emulate the elastic modulus, Poisson’s ratio and strengths of isotropic rock in laboratory scale, extensions to anisotropic rock and larger engineering s

    Jan 1, 2015