Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mirador Copper - Gold Project

    Mirador - Overview ? Located in Andean foothills of SE Ecuador ? Copper-gold porphyry hosted by calc-alkaline Late Jurassic granitic and porphyritic rocks ? 438 MT of 0.61% Cu and 0.19 g/t Au measu

    May 1, 2006

  • CIM
    A Numerical Validation of the Gnirk and Johnson Theoretical Solution for Petroleum Salt Wells

    By F. Mackay, S. A. B. da Fontoura

    "The theoretical solution for a viscoelastic well was presented by Gnirk and Johnson in 1964. From this an exercise was executed to validate the numerical simulation of a cemented salt well. The exerc

    Jan 1, 2015

  • CIM
    Using a Pit Optimization Tool to Calculate Oil Sands Mining Inventory

    By L. Chunpongtong

    ABSTRACT Oil sands production occurs on a massive scale, making orebody estimation a challenge. In rainy conditions, operators can have difficulty accessing ore at the mapped location. Without enough

    Jan 1, 2014

  • CIM
    Honeymoon Uranium Project, South Australia

    By Colin P. Skidmore

    Long touted as Australia?s fourth uranium mine the sediment-hosted Honeymoon Uranium Project is close to commercial production using insitu-leach mining methods. Uranium mineralisation occurs as pitch

    May 1, 2006

  • CIM
    Development of the New Oxygen-Enriched Bottom-Blowing Continuous Copper Converting Process

    By Yan Jie

    The oxygen-enriched bottom-blowing continuous converting process for copper matte was recently developed by the China-ENFI Engineering Corporation. The first commercial plant based on this technology

    Jan 1, 2014

  • CIM
    Towards Improving Gearless Mill Drive Availability

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American?s suite of specifications for gearless mill drives (?GMDs?). These specifications are based on

    Nov 1, 2011

  • CIM
    Towards Improving Gearless Mill Drive Availability (8130f4b0-7b8b-4d03-8ef0-64e205ed7248)

    By P. R. Warner

    This paper reviews the development of certain aspects of the electrical specifications of Anglo American’s suite of specifications for gearless mill drives (“GMDs”). These specifications are based on

    Jan 1, 2012

  • CIM
    The Development and Commissioning of Ontario’s First Diamond Mine: Victor Diamond Mine (5f420872-c005-4976-9f70-552c4de7bef5)

    By N. Morrison, I. Holl, R. Welyhorsky, A. Hempstock

    ABSTRACT: The Victor diamond mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario. The process

    Jan 1, 2011

  • CIM
    Deriner Hydropower Scheme ? Geotechnical Issues and the Particular Case of the Spillway Tunnels Design and Construction

    By C. Cekerevac

    The paper addresses some geotechnical issues related to the construction of the Deriner dam and HEPP. Design considerations and rock stabilization measures are presented for the excavations which took

    May 1, 2009

  • CIM
    Integrating Liner Profile Evolution and Mill Performance with 3D DEM Modelling (20135fb6-de8e-4fbf-965b-a913b3fa7428)

    By Nirmal Weerasekara, Jochen Franke, Malcolm Powell, John Favier

    Mill liners serve the dual purpose of protecting the shell from wear and transferring the rotary motion of the mill to an effective grinding action. As the liners wear, the efficiency of energy transf

    Jan 1, 2012

  • CIM
    Novel Comminution Machine May Vastly Improve Crushing-Grinding Efficiency (613599c2-3ae4-4bbd-b958-7881e073ca6c)

    By Alexander Potapov, Lawrence Nordell

    A Conjugate Anvil-Hammer Mill (CAHM) has the potential to replace conventional crushers and SAG mills, with their respective conveyors and stockpiles, in a SABC circuit. It may improve comminution cir

    Jan 1, 2012

  • CIM
    Waste To Ore: A Goldcorp Story

    By T. Ward, K. Shah, K. Murray

    The mining industry is processing deposits with ever decreasing grade at ever increasing operating costs while margins are under constant pressure by material substitution and recycling. We are reachi

    Jan 1, 2018

  • CIM
    Algorithm to Help Additional Drilling Location

    By Vanessa C. Koppe

    During ore body modeling normally additional samples are required to improve resources evaluation and mining planning. At this stage one rises the question about where additional samples should be loc

    Oct 1, 2009

  • CIM
    Electrorecycling of Critical and Value Metals from Mobile Electronics

    By Tedd E. Lister, Andre Anderko, Peiming Wang

    Mobile electronic devices such as smart phones and tablets are a significant source of valuable metals that should be recycled. Value metals in phones are gold, palladium, silver, copper, cobalt and n

    Jan 1, 2014

  • CIM
    The Practical Implementation of a Wireless Tire Pressure Monitoring System for Mine Sites

    By Chris Brothen

    The introduction of new technology in mine operations has provided real opportunities for increased efficiencies and production gains which translate into enhanced profits. Computing and network techn

    May 1, 2008

  • CIM
    Thermal Analysis of B206 Aluminum Alloy Solidification

    By N. Haghdadi, D. M. Maijer, A. B. Phillion

    B206 is a recently-developed high-strength Al-Cu casting alloy with reduced Ti and Fe, as compared to the well-known AA 206 alloy, for improved hot tearing resistance. In the current study, the solidi

    Jan 1, 2014

  • CIM
    Contact-angle measurements on coal particles from solidification-front experiments

    By E. I. Vargha-Butler

    The determination of surface tensions and contact angles of coal particles is of great interest for coal beneficiation processes such as froth flotation and oil agglomeration and for the inclusion of

    Dec 1, 1981

  • CIM
    The Advantages of Concurrently Design and Engineering of Copper Solvent Extraction and Electrowinning Plants

    By G. Karcas

    Concurrently designing both the solvent extraction and the electrowinning processes of a copper SX EW project, in an integrated and consecutive approach, with one technology partner, will ensure conti

    Jan 1, 2007

  • CIM
    Modeling stress relaxation at high temperatures involving delayed elasticity

    By Shoma Sinha, Nirmal K. Sinha

    Deformation in a material at any temperature is known to consist of two major components - a reversible (elastic) part and an irreversible part (often called plastic). What is not universally known is

    Jan 1, 2004

  • CIM
    Moisture Effect on CO Oxidation over Supported Gold Catalysts

    By Masakazu Daté

    Moisture effect has been studied for the CO oxidation over Au/TiO2, Au/Al2O3 and Au/SiO2, in the range of H2O concentration over four orders of magnitude. It has been found that the catalytic activity

    Oct 1, 2003