Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New BrunswickBy Art Hamilton
Abstract -The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeformed volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group.
Jan 1, 1992
-
Forcing Air into Self-Aspirating Flotation MachinesA line of nine self-aspirating W emco cells, part of the Rougher circuit at Division Salvador, Codelco Chile, was retrofitted to allow operation with forced air. Each cell could be operated self-aspir
Jan 1, 2007
-
The Underground Power Plant at GranducBy J E. McMynn
The development of the Granduc mine presents a number of problems which are peculiar to its location and surrounding terrain. Because the development tunnels portal onto an area which is covered by an
Jan 1, 1963
-
Modelling a semi-batch reactive precipitation of ferrihydriteBy W. R. Richmond, T. S. Li, D. Ilievski
The reactive precipitation of ferrihydrite was studied in a laboratory semi-batch precipitator, where a highly concentrated sodium hydroxide solution was fed into an iron nitrate solution. Instantaneo
Jan 1, 2005
-
Microstructure and Mechanical Properties of Mg-Li Sheets Processed by Accumulative Roll-BondingBy K. Izumi
Ultra-grain refinement and high strengthening of metals by accumulative roll bonding (ARB) was widely reported. However, applications of ARB to magnesium alloys were rather limited. In this study, Mg-
Jan 1, 2006
-
Productivity Analysis of the Table Formwork Method for Making a Cost-Efficient Equipment Input PlanBy J. B. Kwon
For improvement in the productivity of tall building projects, table formwork is one of the main methods that have been adopted for slab formwork. Because the table formwork method is an equipment-ori
Aug 1, 2013
-
Residual Stresses Induced by Robitized Hammer Peening: The Effect of Impact Energy LevelBy L. Hacini, N. Van L ê, P. Bacher, D. Thibault
Manufacturer welded components may suffer from high level of residual stresses which can cause premature cracking and decrease the life of the components if they reach values close to the yield streng
Jan 1, 2006
-
Expert Systems for Control of No. 4 Autogenous Mill Circuit at Wabush MinesBy P. Cleyle, K. McDermott, M. Hall, C. A. Harris
"This paper describes the implementation of an expert system for monitoring and control of the NO. 4 autogeneous mill and spiral circuits at Wabush Mines.This process control system incorporated the m
Jan 1, 1992
-
The Introduction of Lightweight Truck Boxes to Highland Valley CopperBy Peter A. Witt
Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located some 75 kilometres southwest of Kamloops, B.C. (Figure 1). The ore is within a porphyry deposi
May 1, 2002
-
Financial Feasibility of Integrating Mineral Carbonation into Proposed Mining Operations at the Turnagain Nickel Site, Northern BCBy Sarah R. Hindle
Carbon capture and storage has jumped to the forefront of climate change mitigation efforts for its capacity to sequester large amounts of carbon. Mineral carbonation is one prominent option, mimickin
May 1, 2010
-
Gold Analysis - Fire Assaying and Alternative MethodsBy James R. Yeager, Eric L. Hoffman, John R. Clark
"Abstract -This paper describes fire assaying and ‘high tech’ alternatives for gold analysis, including advantages and disadvantages of each method. These ‘high tech’ methods include INAA (instrumenta
Jan 1, 1998
-
Circuitry and Equipment Installed for Control of the Grinding Circuit at East Malartic Mines Ltd.By A. E. Gillis
"Some or all of the following benefits can be expected following application of automatic control to a grinding circuit:1. Maintenance of Optimum Mill Load Level2. Improved Uniformity of Grind3. Incre
Jan 1, 1966
-
Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New Brunswick (a6701408-1e86-4e3a-8ae3-4dfe8644a28d)By Art Hamilton
The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeforrned volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group. Massive
Jan 1, 1992
-
Smart Technology Dust Abatement of Bulk Materials; Conveyed and/or Stockpiled, including TailingsBy Tibor Horvath
Dust abatement is possible on bulk materials, whether conveyed or stockpiled. Minimum (ppm) quantities of chemical additives can efficiently and rapidly control dust of conveyed substrates with no eff
Oct 1, 2010
-
Training Program Development at the Kidd Creek Concentrator"The Kidd Creek concentrator is situated adjacent to Highway 101, twenty-four kilometres east of the center of the city of Timmins, Ontario. Sulphide ore, received by train from the minesite twenty-ni
Jan 1, 1981
-
The Autonomous Real-Time System for Ubiquitous Construction Resource TrackingBy M. Soleimanifar
With more and more industrial construction projects implementing RFID and other sensor-based technologies on fabrication and project sites, new innovative processes are needed to help automatically re
Aug 1, 2013
-
Beneficiation of Rare Earth Element Enriched Eudialyte from the Norra Kärr Peralkaline Intrusion with Wet High Intensity Magnetic SeparationBy M. Leijd, K. S. Forrester, M. Saxon, M. Oczlon
This paper provides an introduction to wet high intensity magnetic separation (WHIMS) and its successful application to the beneficiation of rare earth element (REE) enriched eudialyte. The analysis i
Jan 1, 2014
-
Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec (4e04e1fb-2588-4997-8220-6f15481d7d28)By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson
The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is located at the
Jan 1, 1993
-
A Study on Measuring of Reinforced-Concrete Structure by 3D Laser Scanner and Making Design of Pre-Cut Interior Finishing Components with Polygon ModelBy Kosei Ishida
To achieve renovation work without noise, the authors developed techniques of manufacturing pre-cut interior finishing components for renovation work. In this paper, to achieve the system of pre-cut
Aug 1, 2013
-
Influence of Nonpolar Group Structure on Collecting Property of Two Hydroxamic Acid to HemimorphiteBy C. Han, S. J. Zhou, Y. B. Shen, D. Z. Wei, P. Fang
"Collecting property of two hydroxamic acid collectors have different type of nonpolar structure to hemimorphite has been comparatively studied via monomineral flotation test, and the reason causes di
Jan 1, 2016