Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining Methods and Costs at the Josephine Mine

    By Alan E. Gallie

    One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i

    Jan 1, 1947

  • CIM
    Quantitative correlation of worldview to resource development conflict

    By M. Hitch, M. B. Lytle

    Resource development conflicts arise largely due to differences in worldview between those who support and those who oppose development. This paper illustrates how societies and civilizations with dif

    Jan 1, 2017

  • CIM
    Quantification of Precipitates in Microalloyed Steels

    By J. Lu, D. G. Ivey, H. Henein

    Microalloyed steels are widely used in the oil and gas industry. They are a class of high strength, low carbon steels containing small additions of niobium (Nb), titanium (Ti), molybdenum (Mo) and/or

    Jan 1, 2005

  • CIM
    Mixed Spectral Study of Hyperspectral Data for Abundance Estimation of Ores in Gua Iron Ore Mines, India

    By D. Chakravarty, D. Dutta, B. Samanta, S. Patteti

    "This paper presents the mixed spectral behaviour of iron ores from deposits in Gua, India. Spectral signatures of powder samples and their two-component mixtures were generated by spectro - radiometr

    Jan 1, 2015

  • CIM
    A Mathematical Model for the Prediction of Large Diameter Ball Consumption Rates in Semiautogenous Grinding Applications

    By J. E. Sepulveda, R. Morrow

    "In full scale mineral grinding operations, the steel balls normally utilized as auxiliary grinding media get to be consumed at different specific rates, as determined by 3 basic mechanisms: abrasion/

    Jan 1, 2015

  • CIM
    Determination of Solvent Layer Thickness on Bubble Blown in Air

    By J. A. Finch

    Solvent-coated air bubbles in the Air-Assisted Solvent Extraction (AASX) process achieve the dual role of high solvent specific surface area and ease of phase separation. The thickness of the solvent

    Jan 1, 2006

  • CIM
    Climate and Hydrology Data Collection for Northern Mine Development

    By Nathan P. Schmidt

    Climate and hydrology data are required during all phases of mining projects, including impact assessment, mine planning and design, operational water management and mine closure and reclamation desig

    May 1, 2004

  • CIM
    In Search of the Ideal Truck-Excavator Combination

    By David Morley

    This paper considers the ideal truck-excavator combination, defined as the combination resulting in the lowest direct unit cost, in consideration of multiple haul scenarios characterized by different

    Aug 1, 2013

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • CIM
    The Starved Acid Leach Technology (SALT) for Processing Of Nickel Laterites and Caron Plant Tailings

    By J. D. Clucas, D. B. Dreisinger

    "The Starved Acid Leach Technology (SALT) has been developed by Search Minerals to extract nickel and cobalt VALUES (from nickel laterite ores (saprolites) and Caron plant residues. The technology con

    Jan 1, 2012

  • CIM
    Present Position and Prospects of the Coal Burning Gas Turbine

    By Donald L. Mordell

    Introduction A very large part of the world's fuel resources are in solid form, as various grades of ?coal, but an increasing proportion of fuel demands on this Continent and else-where are havi

    Jan 1, 1952

  • CIM
    Cement and Rock-Wool Materials

    By Donald F. MacDonald

    THE cement plant nearest to Nova Scotia is not far from Montreal. Cement is a heavy product which, because of its relatively low value, cannot stand a high freight charge without unduly enhancing its

    Jan 1, 1939

  • CIM
    The NioCorp Development Elk Creek Project: A Shaft Design Case Study

    By Chris Dougherty

    "This presentation will provide a demonstration of the methodology used in designing a modern shaft and hoisting plant utilizing a review of the challenges faced and solutions delivered for the Elk Cr

    Jan 1, 2019

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • CIM
    Ore Reserves- The Four Cs

    By Owen Owens, W. P. Armstrong

    Abstract- The process of arriving at the size and grade of: (a) a newly-discovered body of mineralization, (b) a potential ore resource, (c) an orebody proposed for mining, or (d) the ore reserves in

    Jan 1, 1993

  • CIM
    Ventilation as a Means to Prevent Silicosis in Ontario Mines

    By Clifford S. Gibson

    THESE troubled times suggest three reasons for maximum effort to control silicosis: (1) To keep to a minimum the ever-increasing burden occasioned by past deficiencies in this respect. (2) To effe

    Jan 1, 1942

  • CIM
    Transportation in the Uranium Areas of the Northwest Territories

    By W. J. Bennett

    "I AM very happy to have this opportunity of speaking to the Montreal Branch of the Canadian Institute of Mining and Metallurgy.I have selected as the subject of my remarks transportation in that area

    Jan 1, 1952

  • CIM
    Mining Methods and Practices at Lake Shore

    By Leslie S. Weldon

    THE Lake Shore mine has been developed by two vertical shafts, with level intervals at 200 feet to the 2200 level and at 125 feet below this horizon. A main cross-cut joins the two shafts on all level

    Jan 1, 1936

  • CIM
    High-Arsenic Bearing Concentrates Processed in the Teniente Converter at Codelco Norte Smelter

    By C. Caballero, K. Itagaki, P. Morales, A. Moyano, J. Font

    Codelco-Chile is considering different processing options for the new projected concentrate from the Alejandro Hales mine. This concentrate is featured by its high arsenic content of up to 6%. Thus, i

    Jan 1, 2007

  • CIM
    Increasing Cezinc's Magnesium Bleed Capacity

    By E. Benguerel, G. Monteith, L. Centomo, S. Pelletier

    In early 2007, it became apparent that with changing concentrate feeds, the magnesium (Mg) load projected for CEZinc starting in 2009 and beyond would quadruple and overwhelm the current Mg process bl

    Jan 1, 2008