Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    General Geology and Ore-Grade Control at the Sherman Mine, Temagami, Ontario

    By R. C. Hartviksen, B. H. Boyum

    "The Sherman Mine, Temagami, Ontario, is an iron ore pellet operation rated at one million tons per year capacity. Mining is done from three open pits in two bands of Keewatin iron-formation intercala

    Jan 1, 1970

  • CIM
    Development and practice of the Falconbridge chlorine leach process

    By E. Thune, F. Stålesen, E. O. Stensholt, O. M. Dotterud, E. E. Henriksen, P. O. Ramsdal

    "The development and commercial operation of the Falconbridge chlorine leach process have been described in papers in 1985 and 1987. Since this time, various process improvements have been implemented

    Jan 1, 2001

  • CIM
    Interpretation of Pressure Data Water Saturation in the Bellshill and Lake Capillary Field

    By A. J. Miller

    Estimates of interstitial water saturation derived from capillary pres-sure data are compared with residual water saturations found by the analysis of cores out in oil-base drilling fluid. A theoretic

    Jan 1, 1960

  • CIM
    Future of Safe Travelways at Vanscoy Potash

    By D. Neely

    As Saskatchewan potash mines grow in age and size, mining reaches greater depths.  The stress-relief design principals which were empirically derived at shallower depths are beginning to show fault. 

    May 4, 2025

  • CIM
    Frother Analysis: Procedure and Plant Experience (9afbd8b8-3e71-4680-a005-b07f0c7c29ef)

    By Frank Cappuccitti, James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2005

  • CIM
    Pillar Blasting at the Murray Mine

    In April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un

    Jan 1, 1963

  • CIM
    Weak Rock Mass Span Design ? Best Practices

    By A. Ouchi

    This paper presents ground control best practices in weak rock environments including the "Unsupported" Weak Rock Updated Span Design Curve and awareness pertaining to the potentially detrimental effe

    May 1, 2009

  • CIM
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Oct 1, 2024

  • CIM
    Application of Reconnaissance Geochemistry in Gaspé

    By C. F. Gleeson

    "Geochemical stream-sediment reconnaissance can be a useful exploration tool from the point of view of rapidly and cheaply evaluating the mineral potential of an area. This is particularly true of rug

    Jan 1, 1969

  • CIM
    The Evolution of Open-Pit Drilling and Blasting Practices at the Normandie Mine

    By J. E. McMenamin, R. B. Hall

    "With the emphasis in the past decade on larger and more efficient equipment for open-pit operations, the Normandie mine of the Asbestos Corporation has followed the trend, switching from the smaller

    Jan 1, 1966

  • CIM
    Current leaching and product recovery practice at Denison Mines Limited

    By E. LaRocque

    Denison Mines Limited has been processing uranium ore in the Elliot Lake area for the past 20 years. As the original concept of uranium processing has been modified somewhat over this period, the pres

    Jan 1, 1979

  • CIM
    Mining (e7ac18b4-67b5-4874-86f7-745272387544)

    By Gillyeard J. Leathley

    The Cassiar Asbestos mine is situated on McDame Mountain in northern B.C. at a mean elevation of 6000 ft (1830 m), some 6 miles (9.6 km) from the townsite /mill complex. Asbestos ore production averag

    Jan 1, 1978

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016

  • CIM
    Forging of Nickel-Iron Based Superalloy 901

    By A. R. Khodabandeh, T. Nematkhah

    Correct selection of forging parameters is very important to produce sound superalloy parts. In this investigation nickel-iron base superalloy IN901 successfully forged and seal spacer, which is a par

    Jan 1, 2006

  • CIM
    The Fuelcell Mining Vehicles Development Program: An Update

    By Marc C. Bétournay

    Over the last four years, an international initiative, championed by Vehicle Projects LLC, the Fuelcell Propulsion Institute and Natural Resources Canada, has been active in carrying out research proj

    May 1, 2003

  • CIM
    The Outlook For Zinc

    By H. M. Lewis

    The current status of the international zinc market is summarized, and a supply /demand outlook is presented for the next five years. A number of technical problems facing the industry are outlined.

    Jan 1, 1978

  • CIM
    The Rate of Gold Dissolution in Concentrated Cupric Chloride Solutions

    By R. von Bonsdorff

    Electrochemical and quartz crystal microbalance (QCM) methods were used to investigate the dissolution rate of gold in a solution similar to those utilized by the Outokumpu HydroCopper® process. The m

    Jan 1, 2007

  • CIM
    "Drift Prospecting Near Gold Occurrences atOnaman River, Ontario and Oldham, Nova Scotia"

    By R. N. W. DiLabio

    "In a continuing program of mapping glacial dispersal trains, near-surface till samples were collected down-ice from a copper-silver-gold prospect at Onaman River, Ontario, and down-ice from the past-

    Jan 1, 1982

  • CIM
    A database of underground hardrock mines

    By Peter Moser, Thoma Oberndorfer

    "Within the research project “Mine Development” (Fettweis and Moser, 1990) a PC-based mine database has been built up since 1991 and so far includes detailed technical and economic data of about 150 u

    Jan 1, 1996

  • CIM
    Contrasting styles of alkalic porphyry copper-gold deposits in the northern part of the Iron Mask batholith, Kamloops, British Columbia

    "The Crescent, DM, and Pothook zones are copper-gold porphyry deposits which formed in association with alkalic intrusions of the early Jurassic Iron Mask batholith. The characteristics of the Crescen

    Jan 1, 1995