Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Future of Gold

    By Arthur Notman

    For the period January 1st, 1942, to January 1st, 1946, the American Bureau of Metal Statistics records the gold production of the world as 118,788,000 fine ounces. If we include 1946 at the same rate

    Jan 1, 1947

  • CIM
    Predicting the penetration rate of percussive blasthole drills using coarseness index and median particle size

    By S. Kahraman, K. Develi, E. Yasar

    Four hydraulic top hammers, one pneumatic top hammer, and three down-the-hole drills were observed in several rock types at quarries and highway construction sites to measure the performance data. At

    Jan 1, 2004

  • CIM
    Gold in the Canadian Cordillera

    By D. A. Barr

    "Most of the lode and placer gold production in the Canadian Cordillera has been derived from mines and placers in the Intermontane and Omineca belts. Gold has been produced from rocks of Precambrian

    Jan 1, 1980

  • CIM
    Optimising Chemical Cost in Fine Coal Flotation at Bhelatand Coal Preparation Plant

    By Atul Bhatnagar, M. P. Sinha, Md Zahid Ahmad, Pallav Garg, Sanjay Kumar Singh, Shashi Ranjan, An Ecolab Company Nalco Water

    "Froth Flotation is undoubtedly one of the most critical processes in coking coal washing plants. This work was carried out at Bhelatand Coal Preparation Plant of Tata Steel was with an objective of c

    Jan 1, 2016

  • CIM
    Solving Old Problems with New Weapons

    By D. Runnels, A. Allaire, J. Torrealba-Vargas

    Data mining and modelling of operational data involves the discovery of patterns in large datasets for future use in benchmarking and plant optimization. The modern pattern of discovery in large data

    Jan 1, 2019

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    Guideless Autonomous System for Underground Navigation

    By Joseph N. Bakambu

    It is currently recognized by mining society that autonomously guided underground mining vehicles may greatly increase the efficiency of mining production and improve human safety. Recent results in m

    May 1, 2002

  • CIM
    The Hoist and Other Equipment at the Lake Shore Mine

    By D. L. Cramp

    The Direct-Connected Electric Hoist In the latter part of 1931 a new electric hoist was installed at the Lake Shore mine. A number of interesting features were incorporated in this machine, which is

    Jan 1, 1933

  • CIM
    The Propsed Ore Control at the Coronation Mine, Saskatchewan

    By J A. Gilliand

    Mineralogical cross sections of orebodies on the 300-,600- and 900-foot levels of the Coronation mine have been interpreted in terms of centers of mineralization. The maximum concentration of chalcopy

    Jan 1, 1965

  • CIM
    An Approach to Assess and Control the Flotation of Minerals – Semiconductors

    By V. Panayotov, M. Panayotova

    "Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr

    Jan 1, 2016

  • CIM
    Reduction of Fine Iron Ores While Falling Through Hydrogen

    By S. Y. Ezz, K. El•Guindi

    A vertical tube, 8 m long and 2.5 cm in diameter, electrically heated to 650°C throughout the majority of its height, was used to study the-effect of ore feed rate and hydrogen flow rate on the reduct

    Jan 1, 1969

  • CIM
    Dye Penetration Techniques Used to Determine Heap Leach Potential of a Telluride bearing Cripple Creek Breccia Ore

    By Marc D. Melker, Geoffrey R. Lane, Michael Jahraus

    "The Cresson gold deposit is located in the Cripple Creek district of Colorado. The deposit is composed of volcanic intrusive rocks and volcanogenic sediments where gold mineralization is associated w

    Jan 1, 2006

  • CIM
    The development of process mineralogy at Falconbridge Limited and application to the Raglan Mill

    By J. S. Stickling, P. J. Whittaker, N. O. Lotter

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    A Dem Analysis of Rock Slope Stability in Presence of a Non-Persistent Joint

    By V. Bonilla-Sierra, M. Elmouttie, L. Scholtès, F. V. Donzé

    In the presence of joint sets sub-parallel to a slope face, the stability of the rock mass is controlled by the shear strength of the joints. On one hand, if the joints are persistent their shear stre

    Jan 1, 2015

  • CIM
    Cyclic Oxidation Behaviour of Plasma Sprayed Stellite-6 Coated Ni-Base Superalloys in Air and in Na2SO4 -60%V2O5 Environment

    Stellite-6 coatings were formulated on two Ni-base superalloys, namely Superni 75 and Superni 600, by a shrouded plasma-spray process, and the oxidation behaviour of these coatings has been investigat

    Jan 1, 2005

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Dust Control at the Cassiar Asbestos Primary Crushing Plant

    By F. J. MacPherson, A. C. Caron

    "Cassiar Asbestos Corporation Limited is at present B,C.'s only asbestos mining company, and has been actively engaged in the management and operation of the Cassiar Mine since the early 1950's. The C

    Jan 1, 1976

  • CIM
    The Hydration Kinetics of Magnesium Oxide Obtained by Calcination of Magnesite (MgCO3) or Synthetic Nesquehonite (MgCO3·3H2O)

    By Zhibao Li, Kunming Zhai, Yan Zhang

    The hydration kinetics of MgO, namely magnesia or magnesium oxide, obtained by calcination of magnesite MgCO3 or synthetic MgCO3·3H2O has been studied. Nesquehonite (MgCO3·3H2O) was prepared by the re

    Jan 1, 2014

  • CIM
    Moly Upgrading Profiles with Flotation Columns

    By R. Amelunxen

    "The molybdenite associated with copper porphyry ores is generally treated in a flotation circuit consisting of a separation and a cleaning section. In the last few years column flotation cells have r

    Jan 1, 1990