Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Calculation of Confidence Intervals of the Block Estimates using Block-Support Anamorphosis and Discrete Gaussian Variogram

    By Abani R. Samal

    The Fe assay values from the diamond drill-holes within a magnetite deposit of magmatic origin are utilized in this study. Only assay data from the unoxidized magnetite mineralization was utilized. Th

    Oct 1, 2009

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • CIM
    Automated Evaluation of Proximity Hazards Caused by Workers Interacting with Equipment

    By Tao Cheng

    Previous research and applications in construction resource optimization have focused on tracking the location of material and equipment. There is a lack of studies on automated monitoring of the inte

    Aug 1, 2013

  • CIM
    Effect of Additional Shear Strain on Recrystallization Texture Formation in a Hot Rolled Al-Fe Alloy

    By K. Ihara, T. Yamaguchi, K. Matsumoto

    "Al-Fe alloy sheets having layers with different strain components were produced by unlubricated hot rolling and the recrystallization texture formation during annealing was investigated in each layer

    Jan 1, 2018

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • CIM
    Organisational change at Campbell Mine

    By Martin P. Raffield

    Placer Domes? Campbell Mine, situated in northwestern Ontario, is undergoing an assessment of the efficiency of the operation which is necessitated by the low gold price and a reducing ore reserve gra

    Oct 1, 2001

  • CIM
    Stratigraphic and Lithogeochemical Characterization of Cycle Volcanism in the LG-3 Area

    By A. Hynes, T. Skulski, D. Francis

    The Archean volcano-sedimentary succession in the LG-3 area has undergone two phases of deformation and has been metamorphosed to upper greenschist and amphibolite facies. Marine, fine-grained sedimen

    Jan 1, 1984

  • CIM
    The use of copper cast cooling members in the ironmaking process

    By G. Thom, A. Kay, J. B. Hyde

    "This paper will initially outline the specific types of copper castings used in blast furnace iron production. Tuyeres, tuyere coolers and stack cooling plates will be discussed in some depth, with p

    Jan 1, 1982

  • CIM
    A Standards Based Approach to Mobile Equipment Data

    By Peter Cunningham

    General Description of Projects The objective is to streamline data transfer within our Process Control and Business Systems for the purposes of tracking actual production, reducing manual record kee

    May 1, 2013

  • CIM
    Geology and Ore Deposits of the Matagami District

    By W. H. MacLean

    The Matagami district lies directly west of Chibougamau on the north side of the Abi tibi greens tone belt. Ores at Matagami are volcanogenic massive sulphides and occur in the dominantly rhyolitic Wa

    Jan 1, 1984

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    Geology of the Caledon Outwash, Ontario

    By W. R. Cowan

    The Caledon Outwash is a large deposit of glaciofluvial gravel and sand located 55 km north west of down town Toronto. For the most part it was laid down in a meltwater channel fronting the Paris Mora

    Jan 1, 1984

  • CIM
    Epigenetic gold deposits and their tectonic setting in the New Brunswick Appalachians

    By A. A. Ruitenberg, S. C. Johnson, L. R. Fyffe

    "Several types of stratiform and epigenetic gold deposits have been found in New Brunswick, It is the purpose of this paper to describe and classify the epigenetic deposits and demonstrate their relat

    Jan 1, 1990

  • CIM
    Truck Shovel Users Group

    TSUG Presentation Overview What/Who we are? Objectives & Mandate How to become a member (who qualifies)? Meeting Agenda?s & Frequency Q & A SMART is an association of mining companies that meet

    May 1, 2008

  • CIM
    Integrated Advanced Grinding Control System at Newmont AHAFO

    By A. Broussaud

    The paper describes the advanced grinding control system implemented at Newmont Ahafo gold mine, Ghana in 2009 and 2010. It shows how the different components of the Advanced Process Control (APC) sys

    Jan 1, 2012

  • CIM
    Artidanal and Small Scale Mining in Namibia ? Understanding the Cycle of Poverty

    By Brad Ross

    ? Value in number of children ? Polygamy common ? Support of extended family and friends ? HIV/AIDS ? Not a culture of savings ? Minimal mechanical experience ? Supportive ? Unintended hindranc

    May 1, 2011

  • CIM
    Applied Geo-Metallurgical Characterisation For Life Of Mine Throughput Prediction At Batu Hijau

    Accurately modeling and predicting long term mill throughput is one of the challenges facing metallurgists, geologists and mine engineers in their quest to consistently deliver accurate life of mine b

    Nov 1, 2011

  • CIM
    Applied Geo-Metallurgical Characterisation for Life of Mine Throughput Prediction at Batu Hijau

    By F. Wirfiyata

    "Accurately modeling and predicting long term mill throughput is one of the challenges facing metallurgists, geologists and mine engineers in their quest to consistently deliver accurate life of mine

    Jan 1, 2012

  • CIM
    Cyclone Modelling - Case Studies

    By R. N. Murarka

    "Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced

    Jan 1, 1992