Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)By C. S. Maggs, L. Shwydiuk, H. W. Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
Jan 1, 2003
-
Effect of Bending Angle and Punch Tip Radius on Spring-Forward in an Al-Mg-Si AlloyBy B. MohammadSadeghi, S. Bakhshivash, M. Haghshenas, F. Rahimi
"Spring-Back/Forward in sheet metals is defined as recovery of elastic strain upon unloading in a deformed sheet specimen. Since this phenomenon can cause alternation in the dimensions of a part, lead
Jan 1, 2016
-
A Two-Phase Backfill Approach to Dilution Control at the Doyon MineBy Emilie S. Williams
The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping
Oct 1, 2004
-
Aeration in Plant PracticeBy K. V. Konigsmann
"The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m
Jan 1, 1973
-
Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine LifeBy Kathy S. Kalenchuk
Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas
Jun 1, 2012
-
Study on Acoustic Wave Propagation in Fractured Rock Mass under High In-Situ Stress of Model Test and Damage Constitutive Relation (da00ca07-9cc1-45ad-9211-b9f1f4c94af2)By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo
The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under hi
Jan 1, 2015
-
Tracer Gas Measurements of Effective Ventilation Airflow and its Influence on Dust Concentrations in an Underground QuarryBy K. Sasaki
Ventilation measurements were carried out in a shallow underground-quarry space with relatively large internal volume of 14,600 m3 in order to evaluate its effective ventilation characteristics. Based
Aug 1, 2013
-
Characteristics of Coal Bumps by Microseismic Monitoring in Underground Coal Mining with Hard Roof and Coal SeamsBy Yi-xin Zhoa
The characteristics of coal bumps are analyzed based on the microseismic data from No.8935 workface in Xinzhouyao coal mine, Datong Mining Group. The geology of this workface is characterized by the t
Aug 1, 2013
-
Les gisements volcangènes du camp minier de Matagami: Structure, stratigraphie et implications metallogeniquesBy John R. Sullivan, Real Daigneault, Mathieu Piché, Jayanta Guha, Gilles Bouchard
"RESUMELa stratigraphie du camp minier de Matagami se résume a la présence de deux groupes volcaniques: le Groupe du Lac Watson et le Groupe de Wabassee qui le surmonte. Les gisements de sulfures mass
Jan 1, 1990
-
The Effect of Stope Inclination and Wall Rock Roughness on Backfill Free Face StabilityBy A. P. E. Dirige
In order to maximize the recovery of ore in variably dipping ore zones of moderate width, cemented backfill is normally placed to serve as structural support. With the intention of saving on costs, ba
May 1, 2009
-
Environmental geology and geochemistry at the Windy Craggy massive sulphide deposit, northwestern British ColumbiaBy Bruce W. Downing, Philip G. Claridge
"The availability of environmental data is a major concern in the development of an exploration project through the permitting and feasibility stages. The collection of these data should ideally start
Jan 1, 1993
-
Process Integration and Optimisation of the Boddington HPGR Circuit (5a005d54-696d-4671-abf8-b2ab149915bf)By S. Tavani, T. Rees
The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova
Jan 1, 2012
-
Rougher Column Flotation of Gold TelluridesBy J. T. Furey
"A pilot plant study was conducted to evaluate the performance of column flotation in the recovery of gold from a gold/tellurides bearing sulphide ore, and to compare the performance of column flotati
Jan 1, 1990
-
Study of the Surface Interaction between Copper Sulfide Minerals and NaHS as Flotation ActivatorBy H. Matsuoka, M. Kawata, K. Mitsuhashi, C. Tokoro, T. Kato
Copper sulfide minerals such as chalcocite, bornite, and chalcopyrite exhibit high floatability, thus they can be recovered as a froth product by adding only a collector in flotation process. However,
Jan 1, 2019
-
Detection of Kaiser Effect in Marbles Under Tensile StressesBy Xie Qiang
It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to
May 1, 2009
-
Electrochemical Studies of the Performance of Different Mesh Anodes during and after Zinc ElectrowinningBy E. Ghali, W. Zhang, M. Robichaud, G. Houlachi
"The performances of six mesh and one plate dimensionally stable anodes have been investigated in the zinc electrolyte at 38oC and compared to conventional silver-lead alloy anodes. The electrochemica
Jan 1, 2016
-
The Post-Failure Characteristics of Rock Pt 2: Application to Coal and Coal PillarsBy T. G. Joseph
The strain softening relationship developed in part 1 is now applied to coal. Having determined the post-failure stress-strain curve for coal specimens, this information can then be used in a finite e
May 1, 2002
-
1995 Federal Budget Targeting expenditureBy Robert B. Parsons
"Finance Minister Paul Martin's second budget might be good for Canada's mining industry in the long run, but the budget raises a number of concerns for the industry in the near term. The bu
Jan 1, 1995
-
Acid mine water treatment at Les Mines Gallen, Noranda Mines LimitedBy N. Lecuyer
"During early 1980, pre-production work commenced at the ""Les Mines Gallen"" project, north of Noranda, Quebec. As a result of the acid mine water associated with this property, a major pre-productio
Jan 1, 1983