Nexgen Energy’s Rook I Project, Southwestern Athabasca Basin, Saskatchewan: The Next Generation Of Uranium Processing And Tailings ManagementBy Sean Hillacre, Arthur Lieu
NexGen’s approach to uranium processing design including the crushing/grinding and leaching of raw ore through to yellowcake precipitation and tailings management focuses on minimizing surface footpri
Jan 1, 2020
-
Electrolytic Reduction, Precipitation, And Thermal Decomposition Of Uranous Sulfate: A Pathway For Closed Loop Sulfuric Acid RecycleBy A. D. Burns, K. M. Nikolaisen
Electrolytic reduction followed by the addition of sulfuric acid and the application of heat can be used to selectively crystallize uranous sulfate from solution. This approach, when coupled with down
Jan 1, 2020
-
A Dual Bound Approach To Damage-Based Finite-Element Modeling Of Tube HydroformingBy C. Butcher
Numerical simulations of straight tube hydroforming of a dual phase steel were performed using both upper and lower bound constitutive models for porous ductile materials. The Gurson model is based up
Jan 1, 2010
-
The Sullivan Concentrator Pilot MillBy R. M. Lauer
OVER THE YEARS concentration of the Sullivan ore has become progressively more difficult as the ore has become increasingly refractory. The introduction of new reagents and changes in the flow of the
Jan 1, 1960
-
Size Enlargement by Agglomeration in Mineral ProcessingBy W. Pietsch
For a number of reasons, solids entering and leaving facilities for the treatment of minerals are becoming increasingly finer. Such materials pose problems throughout processing. Solids featuring smal
Jan 1, 2004
-
Chemical and Petrographic Variations in Rhyolitic Zones in the Noranada Area, QuebecBy L. Larson
Rock samples were taken, away from zones of mineralization , from seven sections of five rhyolitic zones as define d by Spence (l967) in the Noranda area. The purpose of the investigation was to test
Jan 1, 1977
-
Product stewardship at Dofasco: A discussion paperBy B. W. Steele
"Dofasco began operations in 1912 as a steel foundry located in Hamilton, Ontario. Today, Dofasco is a fully integrated mill that manufactures hot rolled, cold rolled, galvanized and tinplate steels.
Jan 1, 1996
-
Mapping Sandstone-hosted Lead Deposits at Yava, Nova Scotia, by Ground EM MethodsBy Ajit K. Sinha
"Abstract - Electromagnetic surveys were conducted over the Yava sandstone-hosted lead deposit in Nova Scotia to evaluate the usefulness of such surveys for detecting and mapping sedimentary hosted m
Jan 1, 1993
-
Economics, Resources, Environment and Technology As Driving Forces in the Base Metals IndustryBy A. D. Dalvi
Economics, Resources, Environment and Technology are the major driving forces in the base metals industry. However, these factors are intertwined and together will propel the industry in the future. T
Jan 1, 2005
-
Rapid Flexural Toughness Development Dry-Mix Shotcrete for Mining ApplicationsBy N. Ginouse, S. Reny
"In the mining industry time is critical as production depends on the speed of the mining cycle. During the mining process, the time required to re-open access for the next phase of an underground hea
Jan 1, 2015
-
Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
Geochemical Control of Chromium, Vanadium, and Titanium Ore DepositsBy H. D. B. Wilson
"IntroductionRECENT ADVANCES in geo-chemistry and in •our knowledge •of crystal structure provide a key which enables us to create a systematic picture of the genesis of many ore deposits. This geneti
Jan 1, 1953
-
Occupational Standards and Certification for Mineral Processing Technicians in the Northwest TerritoriesBy Mary Ann Bennett, Val Nichols, Colleen Proctor
"In 1997 when Royal Oak Mines Inc. went into receivership, the mineral processing technicians (mill operators) who had been working at Giant Mine in Yellowknife, Northwest Territories for most of thei
Jan 1, 2005
-
Geology of Northern Empire MineBy P. C. Benedict
Introduction and Summary The Northern Empire mine is a mile east of Beardmore, and 100 miles northeast of Port Arthur, district of Thunder Bay, Ontario. Production started in March, 1934, and termi
Jan 1, 1947
-
Coal preparation in the western foothills and mountainsBy Stanley G. Butcher
"Introduction Many operators in western Canada, with a background in the minerals industry, talk of ""coal beneficiation"", whereas the coal industry generally uses the term ""coal preparation"" . The
Jan 1, 1985
-
The Effects of Coating Speed and Substrate on Catalytic Titanium AnodesBy Michael S. Moats, Prashant Bagri
"In recent years with increasing concerns about energy consumption in hydrometallurgical processing, there is an ongoing attempt to use Catalytic Titanium Anodes (CTAs) for copper electrowinning. For
Jan 1, 2016
-
Development of materials for solid oxide fuel cells based on perovskite-type structureBy V. Thangadurai
The critical problems in commercialization of the present solid oxide fuel cells (SOFCs) and useful electrical and physical properties of IT-SOFCs electrolytes are discussed briefly. The conductivity
Jan 1, 2005
-
Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good ConductorsBy C. Samson, R. S. Smith, S. W. Hefford
"Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric
Jan 1, 2006
-
Heating Iron Ore Slurry to Improve Filtering Efficiency Prior to PelletizingBy Robert E. Wood
Engineers have known for some time that the efficiency of filtering iron ore concentrate slurry can be significantly improved by pre-heating the slurry ahead of the filters. However, heating such larg
May 1, 2010
-
A geological appraisal of the coal resources of Nova ScotiaBy Peter A. Hacquebard
Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9
Jan 1, 1979