Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improved Input Parameters and Numerical Analysis Techniques for Temporary Support of Underground Excavations in Weak Rock

    By Jeffrey D. Oke

    While significant progress in underground construction engineering has occurred in the past few decades, a number of fundamental deficiencies persist regarding the recognition, prediction, and mitigat

    Jun 1, 2012

  • CIM
    Performance and Field Testing of the Service Brakes of Mining Trucks in B.C.

    By V. E. Dawson

    Brake testing of large mining trucks was initiated in British. Columbia in 1969 following an accident involving the failure of the service brakes of a l00-ton electric-drive truck. Some selected resul

    Jan 1, 1977

  • CIM
    Methodology for Quantifying Uncertainty Versus Data Spacing Applied to the Oil Sands

    ABSTRACT The inevitable uncertainty in modelling spatial variables decreases as more data become available. This reduction depends on the properties of the variable being modelled. Spatially continuou

    Jan 1, 2013

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • CIM
    Optimising Circuit Design for Gravity Gold Recovery

    To determine the optimal circuit configuration for gravity gold recovery consideration should be given to a range of factors in addition to the efficiency of the gravity circuit, including capital cos

    Jan 1, 2011

  • CIM
    A Review of the Industrial Minerals of Saskatchewan

    By E. Y. Carlson

    "IN A SHORT PAPER it is impossible to do much more than to list the industrial minerals found in Saskatchewan and to give a brief description of the activity associated with each. I will not attempt t

    Jan 1, 1959

  • CIM
    No. 2 Shaft Raise, Aunor Gold Mines, Ltd.

    By G. H. Montgomery

    THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the

    Jan 1, 1957

  • CIM
    Equilibrium Corrections in Geiger Analysis

    By C. Lapointe

    "IntroductionTen years ago, when nuclear fission became practical, the element uranium, until then a not very desirable by-.product of the radium industry, became overnight the strategic material par

    Jan 1, 1950

  • CIM
    Can behavioural science help the mining industry?

    By Al Holmes

    "In a recent survey of Canadian work values, 89% of the men surveyed and 97% of the women surveyed described the work in a mine as ""not at all auraetive"", Work in a mine, in fact, was rated by both

    Jan 1, 1980

  • CIM
    Surfactant Blinding Agents for Preg-Robbing Ores in Cil and Ril

    By J. Zachwieja

    As part of a general review on study of surfactant blinding agents to improve gold recovery during cyanide leaching of carbonaceous gold ores, processes of CIL and RIL leaching using surfactants were

    Jan 1, 2015

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    Cold Weather Problems in Belt Conveyor Design

    By Zolfan F. Oszter

    As exploration for new mineral deposits advances farther into the Canadian North, the more the design engineer is faced with the problems of cold weather conditions. This is especially true when desig

    Jan 1, 1965

  • CIM
    Monitoring and targeting of plant utilities at INCO Limited, Sudbury, Garson Mine

    By D. Pacey

    "This paper reviews the installation, start-up, and operation of a comprehensive monitoring and targeting management technique in which all plant utilities (i.e., electricity, natural gas, compressed

    Jan 1, 1997

  • CIM
    A fractal model for the aggregate density-size distributions generated during aggregation processes

    By M. J. Gagnon

    The agglomeration of particulate materials is used in many mineral processes to enhance the settling of the fine particles, Depending upon many physical and chemical parameters, the aggregates demonst

    Jan 1, 2005

  • CIM
    Comparative Evaluation of Shotcrete, Fibrecrete and Thin, Spray-On Polymer Liners for Blast Damage Mitigation

    By James F. Archibald

    A research effort has been undertaken, under WSIB sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining materials for mitigating dynamic failure effects

    May 1, 2003

  • CIM
    Corrosion properties of the skin of high pressure die cast AZ91 alloy

    By C. Blawert

    In previous studies of various HPDC magnesium alloys we found that the corrosion properties of the skin are inferior in comparison to the bulk, However, this is surprising as one would expect better c

    Jan 1, 2005

  • CIM
    Overview of Current Zinc Pressure Leach and Capacity Considerations for the HBM&S Zinc Plant

    By B. Krysa, J. Qiu

    The zinc pressure leach plant at HBM&S's operations is now in its fifteenth year of operation. Current pressure leach operation is steady at a concentrate processing rate of around 26.5 tonnes pe

    Jan 1, 2008

  • CIM
    Typical Reproducibility of Metal Balances in Flotation Plants

    "Each and every flotation plant must produce daily/weekly/monthly production reports in which metal balances for payable and penalising elements are presented. Several factors including ore heterogene

    Jan 1, 2016

  • CIM
    A Novel AG-Crusher-HPGR Circuit for Hard, Weathered Ores Containing Clays

    By P. P. Rosario

    A research project was conducted at the University of British Columbia (UBC) resulting in the development and evaluation of a novel comminution circuit incorporating autogenous grinding and parallel t

    Jan 1, 2012

  • CIM
    A flexible computerized maintenance program for a micro, mini or mainframe

    By Ken Musgrave

    "A program is described that helps managers and supervisors control maintenance more effectively. Work- order generation, preventive maintenance, repair parts inventory, planning and scheduling, repor

    Jan 1, 1986