Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Preparation and Characterization of Pd-Ru Alloy Composite MembranesBy Shin-Kun Ryi
The world nowadays faces many challenges associated with excessive utilization of fossil, fuels, such as poor air quality and greenhouse gas emissions. Hydrogen appears to be an attractive alternative
Jan 1, 2010
-
Characteristics of Indium-Tin-Oxide (ITO) Nanoparticles Recovered from TFT-LCD Panel ScrapsBy T. -W. Hong, Y. Son, S. -J. Hong, D. Choi
The characteristics of indium-tin-oxide (ITO) nanoparticles recovered from TFT-LCD panel scraps were investigated. The ITO was separated from TFT-LCD panel scraps by dissolving the color filter layer
Jan 1, 2014
-
Challenges of ISRU Rover Development?Four-wheel, skid-steer, rover developed for CSA ?U-chassis for payload accommodation ?Passive geometric suspension ?Max speed 13km/hr ?Remote workstation ?275kg payload capacity ?On-board
May 1, 2013
-
Integrated Process PredictionBy Malcolm Powell
"Predicting the performance of the whole mining process is surely the holy grail of predictive simulation. This can be named ‘Integrated Process Prediction’.The objective is to be able to predict the
Jan 1, 2016
-
Commissioning and Operation of the Ag Mills at the Aitik Expansion ProjectBy S. Markstrom
The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis
Jan 1, 2012
-
Abattage Longs Trous À La Mine Géant DormantBy Christian Bourcier
La méthode d?exploitation traditionnelle de la mine est le chantier chambre-magasin. Cependant, lors de l?exploitation d?un chantier, nous avons été confrontés à un problème de soutirage. Le minerai a
Oct 1, 2001
-
Structural Geology Summary Of The Mcarthur River Unconformity-related Uranium Deposit, Athabasca Basin, SaskatchewanBy S. Harvey
The McArthur River deposit is a structurally-controlled unconformity-related uranium deposit. The mineralization is situated at the intersection of a pronounced fault zone, referred to as the P2 fault
Jan 1, 2020
-
Heat Flow and PermafrostBy Alan M. Jessop
This paper discusses the distribution of frozen ground in the zone of discontinuous permafrost in relation to the pattern of surface temperature. The importance of understanding permafrost in relation
Jan 1, 1972
-
Commissioning and Operation of the AG Mills at the Aitik Expansion Project (aaf8f334-a1ef-48c8-b4f0-2d5b88480a9a)By S. Markstrom
The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis
Jan 1, 2012
-
An Empirical Approach to Charge Media Wear PredictionBy Peter Radziszewski
"Typical mining operating costs can be divided between extraction (30 % to 70 %), comminution (30 % to 50 %) and separation (5% to 20% ). Cornminition process costs, representing an important contribu
Jan 1, 2000
-
Reduction Kinetics of Goro Nickel Oxide Using HydrogenBy M. Wu, G. Plascencia, A. E. M. Warner, A. Vahed, T. A. Utigard
Nickel oxide granules formed by pyrohydrolysis of a chloride solution, were reduced in hydrogen. Below 400 °C, an incubation period was observed, followed by very slow reduction. In the temperature ra
Jan 1, 2005
-
Geology of the Adams MineBy F. Dubuc
"The Adams Mine of Jones & Laughlin Steel Corporation is situated on the Boston Township iron range near Kirkland Lake, Ontario. Eight different orebodies have been outlined, with a total open-pit cru
Jan 1, 1966
-
Copper Production Increase at the Horne SmelterBy Yves Prévost, Guy St-Amant, Guillaume Dion
In 2010, the foreseen increase of copper grade in feed concentrate at the Horne Smelter was a significant challenge to maintain a steady copper flow throughout the process. The Horne Smelter process i
Jan 1, 2019
-
Mine Hoist Plant Design FundamentalsBy R. A. (Dick) McIvor
"It is important to ensure that the basic mine hoist plant design fundamentals are incorporated into any new mine hoist plant project before detailed design engineering is commenced. Some of the basic
Jan 1, 2019
-
Bidgood Kirkland MineBy G. E. Parsons
"The Bidgood is a small gold mine about 5 miles east of the main Kirkland Lake camp. Since the beginning of production in 1934, gold having a value of $5,000,000 has been produced from the property. P
Jan 1, 1954
-
Integrating Radar Proximity Sensing and Camera Vision to Improve Mining Equipment Safety with Minimal DistractionBy Nima Nabavi
Shovels and excavators have significant blind spots due to their large sizes, increasing the chances of collision with other surrounding equipment such as haul trucks, loaders, and dozers. While a cam
Oct 1, 2009
-
Social Performance - The hard science behind the ?soft? stuffBy Jo Render
Expectations of your management approach ??Life of mine applicability ??Tailor scale of activity to scale of project ??Assess impacts, risks, and opportunities ??Use global good practice, backed
May 1, 2011
-
Gold Powder Technology: A ReviewBy H. Aminian
Gold powders have many important industrial applications. In this paper the available processes for the preparation of gold nano and micron sized powders are described. The attention has been given to
Jan 1, 2011
-
CANMET-MMSL Alternative Binder TechnologyBy A. Pratt
Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET-MMSL has invented an alternative binder technology that
May 1, 2010
-
Ingénierie de la maintenance, de la conception à l?exploitationBy Turcotte. Yves-Laurent
Notre conférencier, Monsieur Yves L. Turcotte, Vice-président et Directeur général chez Promaintech Novaxa est diplômé en génie industriel de l?Université du Québec à Trois-Rivières et détient une maî
Feb 1, 2008