Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Zero - Waste Process for Copper Smelting Slags

    By J. Smit, F. Parada, R. Parra, E. Balladares, M. P. Merino

    "In this study, a two-step process was developed for recovering copper, molybdenum, zinc and iron (hematite). In the first step, grinded slags (-65 mesh) were sulphated with SO3 at 350-500ºC to form i

    Jan 1, 2014

  • CIM
    Realistic Spring Block Models for Earthquake-Induced Landslides

    By George Efremidis, Markos Avlonitis, Elias C. Aifantis, Avraam Konstantinidis

    "Nowadays, there is an increasing interest for realistic spring-block models capable of addressing precursor phenomena in catastrophic earthquake-induced landslides. By pre-defining the constitutive l

    Jan 1, 2015

  • CIM
    Cleaning Up a Gold Mill for Permanent Shutdown

    "Since all gold mills must sooner or later be cleaned up for permanent shutdown it was felt that a record of what was done at one mill might be of some help to those who will have to do the same job i

    Jan 1, 1966

  • CIM
    Building on Canadian Capabilities for Space Resource Missions

    By John Ratti

    Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes

    May 1, 2013

  • CIM
    Tracking Hauling Trucks for Cut-Fill Earthmoving Operations

    By Ali Montaser

    Hauling trucks are important part of equipment fleets for large earthmoving operations such as those encountered in dams and highway construction projects. This paper presents an automated methodology

    Aug 1, 2013

  • CIM
    Evolution of Texture During Accumulative Roll Bonding (ARB) of Nanostructured 5083 Aluminum Alloy

    By Saeid Akhavan

    Accumulative roll bonding (ARB) is a severe plastic deformation process for achieving ultrafine grains in metallic sheets without changing the sample dimensions. In this study, ARB process was carried

    Oct 1, 2011

  • CIM
    Hydrometallurgical Process for Treatment of Zinc Fume Dusts

    By M. Lahtinen, H. Takala, B. Saxén

    Oxidic zinc fume dusts are formed in electric arc furnace (EAF), Waelz furnace operations, and also in the Top Submerged Lance (TSL) furnace of Outotec Ausmelt. These dusts are normally considered as

    Jan 1, 2014

  • CIM
    Evaluation of Artificial Intelligence for Improved Plant Operation

    By Alain Tshilombo, Vijay Reddy, Chowdary Meenavilli, Kelvin Buban, Cory Kosinski, Sriraj Meenavilli, Siddhartha Tirumalaraju

    The use of artificial intelligence (AI) for process optimization is expected to play an increasingly important role in the future of the mining industry. The objective of AI is to develop a data drive

    Jan 1, 2019

  • CIM
    Slag Reduction and Settling for Improved Metal Recovery

    By R. Dawes, B. R. Davis, T. LeBel, C. Pelow

    Settling of copper, lead, and other metals in slags is an important part of overall recovery of metals, both in primary and secondary operations. The impact of slag reduction on settling is not well k

    Jan 1, 2019

  • CIM
    Rougher Flotation Cell Pulp Level Control to Increase Recovery

    By Mark Ferra

    Flotation is used in mining to produce concentrates of copper, gold and several other valuable ores. In 2017, a copper mine near Globe, Arizona improved their rougher cells productivity using technica

    Jan 1, 2019

  • CIM
    Split-Feed Circuit Design for Primary Sulfide Recovery

    By John A. Herbst, Gerald H. Luttrell, Jaisen N. Kohmuench, Aaron Noble, Michael J. Mankosa

    The HydroFloat TM is an innovative fluidized-bed separator that can substantially increase the upper particle size that can be successfully treated by flotation. Recent studies conducted using laborat

    Jan 1, 2016

  • CIM
    The Pechiney reduction cell family: 25 years of development in design and process control

    By C. Vanvoren

    "Since 1975, the Aluminium Pechiney Research Centre at Saint-Jean-de-Maurienne (LRF) has been concentrating its efforts on designing, testing and perfecting the Aluminium Pechiney point-fed prebaked r

    Jan 1, 2002

  • CIM
    Quantitative Methods for Copper Smelter Re-Engineering Projects

    By A. Navarra, Norman Toro, T. Marín, Fernando Ayala

    The quantitative techniques to evaluate the enhancement of a particular unit operation should consider the corresponding changes to the adjacent unit operations. For example, the expansion of off gas

    Jan 1, 2019

  • CIM
    Failure mechanics and design considerations for footwall slopes

    By D. C. Martin, P. M. Hawley, C. P. Acott

    "In bedded deposits such as coal or sedimentary iron, economic limits of mineable reserves are clearly defined by the footwall of the seams or ore-bearing units. Where open pits are developed in dippi

    Jan 1, 1986

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Crisis Management and Communications Preparing for the Unexpected

    By Dale Coffin

    Definition Of A Crisis Crisis \kri-ses:\ An unstable or crucial time or state of affairs whose outcome will make a decisive difference for better or worse (Webster's New Collegiate dictionary)

    May 1, 2004

  • CIM
    Immobilization of Arsenate in Soils by the Addition of Magnesium Oxide: An Experimental and Modeling Investigation

    By M. Niinae, F. Nakahara, T. Kawamoto, T. Suzuki

    "MgO was chosen as an As(V) immobilization agent and a series of immobilization experiments was performed to obtain insights into the behavior of As(V)and MgO during leaching tests. Our experimental a

    Jan 1, 2016

  • CIM
    “Energy Management Program”

    By K. H. B. Wenzl

    "Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta

    Jan 1, 1978

  • CIM
    Setting the Record Straight

    By Don Thompson

    It isn?t a lie if you don?t tell the whole truth The pictures National Geographic didn?t print Other photos National Geographic didn?t print?

    May 1, 2009

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985