Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Planning & Financial Valuation Model and Framework for Sustainability Investments

    Agenda ?The Context ?The Challenge ?The Solution ?Benefits and lessons learnt from pilots ?Next Steps The Context ?Facilitate management decision making process by supporting the development

    May 1, 2011

  • CIM
    Formation of Schwertmannite-Like and Scorodite-Like Coatings on Pyrite and its Implications in Acid Mine Drainage Control

    By N. Hiroyoshi, R. D. Corpuz, M. Ito, Hokkaido University, C. B. Tabelin, S. Veerawattananun

    "Acid mine drainage (AMD), the very acidic and heavy metal-contaminated leachate generated when pyrite-bearing rocks are exposed to surface oxidizing conditions, is a serious environmental problem enc

    Jan 1, 2016

  • CIM
    Compressed air – Its time has come for improved efficiency

    By Lanny Pasternak

    "This article is directed at plant production, engineering and maintenance personnel. Seldom does any industrial operation take the time to study the costs involved in the generation of what is probab

    Jan 1, 1996

  • CIM
    Design of dewatering circuits in oil sand plants by utilizing a hydrocyclone model simulation

    By A. I. A. Salama

    The CANMET Western Research Centre (CWRC) has developed a hydrocyclone model simulation of dewatering and fine particle separation circuits. The simulation is based on an existing empirical model. Uti

    Jan 1, 2003

  • CIM
    Application of longhole drilling methods for narrow vein mining

    By Richard Cyr, Peter Larsen, William Quesnel

    "The need to continually improve efficiency and lower costs in mining operations is of paramount importance to all concerned in the industry. Mining operations are constantly testing new methods and e

    Jan 1, 1990

  • CIM
    Microstructural control for creep resistance of titanium aluminide intermetallics

    By J. Beddoes

    The various microstructural factors that influence the creep resistance of y-titanium aluminides are presented and discussed. Titanium aluminides have potential for a variety of intermediate temperatu

    Jan 1, 2004

  • CIM
    Recovery of Barite for Drilling Mud Purposes from Tailings

    By R. D. MacEchern, M. C. Rockwell

    "This paper describes the research and tests carried out to recover the readily available barite from the tailings produced by the Nystone Chemical Ltd. operation at Debert, N.S. The tailings comprise

    Jan 1, 1984

  • CIM
    Modelling Effectiveness of Covers for Tailings Closure ? Case Studies

    By Lindsay A. Robertson

    The long term management of acid generating tailings at mine closure is a common issue, however, management of ARD is significantly impacted by local conditions, including climate. Acid generating tai

    May 1, 2011

  • CIM
    Computer Applications in Open-Pit Mine Planning

    By O. Garg

    This paper summarizes the computer applications in open-pit mine planning at the Iron Ore Company of Canada (IOC). A brief history of the use of computers at IOC is given, and a description of the exi

    Jan 1, 1979

  • CIM
    Human Factors Design Principles for Load-Haul-Dump Vehicles

    By T. R. Eger

    The Load-Haul-Dump (LHD) vehicle is a trackless, free-steered vehicle used in underground hardrock mining to move large quantities of ore/rock to haulage trucks, ore dump locations, or crushing statio

    Aug 1, 2013

  • CIM
    Review of Passive Treatment Systems for Acid Mine Drainage

    By Sheila E. Daniel

    "Since 1989, the Mine Environmental Neutral Drainage Program (MEND) has sponsored research into ways of reducing the environmental impact and financial liabilities associated with Acid Mine Drainage f

    Jan 1, 1995

  • CIM
    Acceleration of Project Schedule for Targeting Early Revenue Streams

    By Zia Pirzada

    "Time is of the essence" and "Time is money" These are powerful and true statements during a project life cycle and have far-reaching implications on the success and failure of the project Time and p

    Oct 1, 2010

  • CIM
    Intégration De La Désulfuration Dans La Restauration Des Sites Miniers Générateurs De DMA

    By Bruno Bussière

    Le drainage minier acide (DMA) provenant de la circulation des eaux à travers les rejets miniers sulfureux est sans doute le principal problème environnemental auquel est confrontée l?industrie minièr

    Nov 1, 2002

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Sladen Malartic Mine

    By J. E. Gill, A. R. Byers

    "The property of Sladen Malartic Mines, Limited, is in the northern half of Fourniere township, Abitibi county, Quebec. The group is large, but the part so far found to be of economic interest is a st

    Jan 1, 1954

  • CIM
    Pickle Crow Mine

    By W. P. Corking

    "The purpose of this paper is to describe the relationship of the goldbearing ore to structure at the Pickle Crow mfoe. Information beyond this scope may be found in the reports and papers of Hurst( l

    Jan 1, 1954

  • CIM
    Using Effective Stress Theory to Characterize the Behavior of Backfill

    The importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on

    May 1, 2007

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed and massive f

    Jan 1, 2012

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Environmental Improvements at Sudbury, Ontario

    By R. E. Michelutti

    "The Sudbury area environment became drastically altered commencing in 1871 with lumbering, repeated fires and early open roasting operations from 1887 to 1929. These combined factors had such a prono

    Jan 1, 1986