Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using High Performance 2D Radar for Mine Equipment Automation and Obstacle Detection

    By Reik M. Winkel

    Radar Technologies are successful implemented in the military industry since decades and recently found their way in the mining industry as level gauge radars for bin applications. The latest generati

    Oct 1, 2009

  • CIM
    Geo-electrical Investigation for Sulfur Prospecting in Teshreen Structure in Northeast Syria

    By Asfahani. Jamal, Randa Mohamad

    "Abstract - Electrical and structural characteristics of formations favorable for sulfur occurrences in northeast Syria are described using geo-electrical prospecting methods. Simple (VES) and combine

    Jan 1, 2002

  • CIM
    Cy-Tech Ion Exchange System for Recycling of Cyanide in Gold Mills

    By A. Hussain

    PAPER NOT SUBMITTED FOR PUBLICATION

    Jan 1, 1987

  • CIM
    Logistic Regression for Geologically Constrained Mapping of Gold Potential, Baguio District, Philippines

    By Emmanuel John M. Carranza, Martin Hale

    Abstract- An application of logistic regression to mapping of gold potential in the Baguio district of the Philippines is described. Categorical map data such as lithologic units and proximity classes

    Jan 1, 2001

  • CIM
    Shaft Sinking Experience in Athabasca Basin and Geoscientific Investigations for Future Shafts

    By Rashid Bashir

    Shaft sinking through solid rock, which contains little or no water, poses little difficulty. However, when loose, water-bearing strata have to be contended with, water control measures, and pumping f

    Aug 1, 2010

  • CIM
    The Jameson Cell for Pre-Rougher Applications in Base and Precious Metals

    By Virginia Lawson, Adam Price

    The rougher flotation stage is used to reject liberated gangue at a coarse size. Base and precious metals due to their high specific gravity tend to recycle in the grinding circuit and report to the f

    Jan 1, 2019

  • CIM
    ZA alloysa challenge to the metals industry

    By E. Gervais

    "In today's marketplace, heavy competition between materials is the norm. This is particularly true f or the base metals, which are being increasingly challenged by new or improved materials in a

    Jan 1, 1987

  • CIM
    Metallurgical Test Program For Fission Uranium Corp.’s Triple R Uranium Deposit

    By Lawrence Melis

    Fission Uranium Corp.’s Triple R Uranium Deposit at its Patterson Lake South Project is located in northwest Saskatchewan in Canada’s Athabasca Basin. As part of pre-feasibility studies for the projec

    Jan 1, 2020

  • CIM
    Reductive Leaching of Metal Oxides in Nickel Laterite Ores, Deep Sea Manganese Nodules and Spent Batteries / Catalysts

    By L. C. S. Dharmasiri, S. M. Shin, A. Senaputra, J. S. Sohn, K. H. Park, J. Avraamides

    Reducing agents can be applied to leach metal values from natural and secondary resources such as laterite ores and deep sea manganese nodules and recycled materials such as spent batteries / catalyst

    Jan 1, 2014

  • CIM
    Why Does a High Oxidation Potential Improve Uranium Leaching for Some Ores

    By S. Burling

    Australia has a number of uranium deposits, but they vary significantly in their mineralogy, grade and textural characteristics. Therefore, information from traditional (or conventional) sources regar

    Aug 1, 2010

  • CIM
    A Field Assessment of the SIUC Innovative Spray System for Continuous Miners

    By Yoginder P. Chugh

    Beginning in 2010, a scientifically-founded water spray system for continuous miners (CMs) has been in development at Southern Illinois University that significantly reduces respirable dust exposure f

    Aug 1, 2013

  • CIM
    Development of the Americ-Baker Cellular Mineral Thermal Insulating Materials for Buildings

    By W. J. D. Stone

    Discussions with people knowledgeable in the insulating material field revealed that materials on the market would be considerably improved if there was a greater meeting of certain very desirable cri

    Jan 1, 1979

  • CIM
    Testing and Implementation of a Fatigue Monitor System for Haul Truck Operators

    By Mark W. Bartlett

    Program Objectives ??Identify and implement a tool for haul truck drivers that: -Reduces or eliminates fatigue-related injuries and fatalities -Reduces accidents and equipment damage ??Following

    May 1, 2011

  • CIM
    SAG Mill Liner Design for Secondary Crushing (1f7d545d-3a50-4254-8cea-23d41b1e2a55)

    By D. Royston

    Reducing SAG Mill feed size has been a major trend in recent years. ‘Mine to mill’ strategies have reduced blasted-rock size, and in a growing number of operations reducing the primary crusher CSS and

    Jan 1, 2012

  • CIM
    Friction bolt anchored wire rope for rock support in burst-prone ground

    By P. K. Kaiser, D. D. Tannant

    "A support system for large ground convergence conditions or burst-prone ground must contain holding elements (rockbolts, cable bolts, etc.) that are strong yet capable of sustaining large deformation

    Jan 1, 1995

  • CIM
    Mineralogical and process controls on the oxidative acid-leaching of radioactive phases in Elliot Lake, Ontario, uranium ores: I - uraninite, uranothorite and monazite

    By Roy O. Ifill, W. Charle Cooper, Alan H. Clark

    "A detailed study of the compositional relationships of the Uand Th-bearing minerals in Elliot Lake uranium ores has been conducted, particularly with regard to uranothorite, which clearly plays a cri

    Jan 1, 1989

  • CIM
    Selection of large diameter wire rope for use on surface milling excavators

    By Ronald G. Hamm

    "With the advent in Canada of large open-pit equipment, the associated wire rope required must keep pace, especially in design and construction, along with the field that leads to increased rope life.

    Jan 1, 1983

  • CIM
    The Advanced Control Project at Highland Valley Copper

    By Cy Jordan, Ben Burdett, Adrian Dance, Jack Rainey

    "In 1997, EIMCO Minerals installed a knowledge-based control system on one of the five primary grinding lines at Highland Valley Copper. The objective of the system is to maximise throughput without a

    Jan 1, 1998

  • CIM
    Enhancing the Collection of Rock Mass Fabric Data for Open Pit Mines

    By C. Poon

    For slope stability, knowledge of major and minor discontinuity sets that form the rock mass fabric is paramount for pit slope designs. Due to the increased awareness of health and safety in mining pr

    May 1, 2009

  • CIM
    Vanadium Electrolyte Cost and Purity Considerations for Vanadium Redox Flow Battery Applications

    By Maria Skyllas-Kazacos

    The All-Vanadium Redox Flow Battery that was pioneered and has been developed at the University of New South Wales (UNSW) in Sydney since the mid-1980s is currently regarded as one of the most attract

    Jan 1, 2014