Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Information Strategy Planning on Nuclear Power Plant Project Management System

    By Son Hye Jin

    Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the

    Aug 1, 2013

  • CIM
    The Development of a Novel Zinc Collector Using Both Lab and Mil Scale Trials

    By D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel

    "The steps from experimental curiosity through to commercial product can be slow and tortuous in spite of the quality of the technological advances offered by the new development. Data generation and

    Jan 1, 1990

  • CIM
    Thickened Tailings and Red Mud Disposal

    By V. L. Mitsopoulos

    This paper provides a summary of tailings disposal techniques and the improvements that have been made through the introduction of thickened tailings disposal. The general properties and characteristi

    Jan 1, 2006

  • CIM
    Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)

    By D. J. Parker, G. B. Tupper, I. Govender

    Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t

    Jan 1, 2012

  • CIM
    XPS Study on the Reaction Mechanism of Chlorite with New Anionic Collector A6

    By Yulin Zhou, WenFeng Li, Wen Chen

    "In this article, with the help of the X-ray photoelectron Spectroscopy (XPS), a modern test method, all the characteristics of the chlorite,and adsorption collector A6 on the surface of chlorite have

    Jan 1, 2016

  • CIM
    Effect of rare earth elements addition on thermal fatigue behaviors of AZ91 magnesium alloy

    By S. Khoshkhooei

    In this research, the effects of rare earth elements addition on thermal fatigue behaviors of AZ91 alloy were studied. Repeated heating and cooling cycles were applied on the samples at 170°C and 210

    Jan 1, 2005

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Implementing Energy Management in the Canadian Mining Industry

    By Lauri Gregg

    The implementation of Energy Management within the global mining industry has advanced significantly during the past 20 years. Consequently, the industry?s knowledge of energy efficiency improvement o

    Aug 1, 2013

  • CIM
    A Blast from the Past ? The Granduc Tunnel

    By V. Evans

    Mine lateral development advance rates currently average about 5 metres (16.5 ft.) per day. Granduc Tunnel hit 35.1 metres (115 ft.) on their best day, 12 km from the portal, single heading forty-thre

    May 1, 2011

  • CIM
    Improvements to Grassroots and Minesite Exploration using Titan 24: Overview and Applications of Titan 24 Deep Imaging Technology

    By Greg M. Hollyer

    The search for minerals in the future will be dominated by deeper exploration and the need to accurately target ?blind? deposits as more and more of the ?easy? near surface targets are exhausted. In t

    May 1, 2008

  • CIM
    Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’

    By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond

    "Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control

    Jan 1, 2010

  • CIM
    Trends in concentrate dewatering operations in mills of the Noranda Group

    By K. V. Konigsmann

    "Concentrate dewatering operations have a significant influence on the economics of base metal beneficiation. The expenditures f or energy and labour per tonne of product are high. The relatively low

    Jan 1, 1984

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Enabling Technologies – Diesel through Hybrid

    By Evelynn Stirling

    "The paper/presentation will review the evolution of diesel technology from older diesel engines (1990 vintage) through to the latest technology as a result of the ever changing emissions regulations.

    Jan 1, 2019

  • CIM
    Flotation of Pyrite in High Salinity Water

    By Qingxia Liu, Mingbo Zhang, Hongbo Zeng

    The shortage of freshwater has been a major challenge for mineral flotation in arid areas. When using high salinity water, certain electrolytes are detrimental to flotation while others can improve th

    Jan 1, 2015

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Improved Gold Extraction from a Refractory Arsenopyritic Ore by Chemical Pretreatments

    By Sandra L. Mesa-Espitia, Gretchen T. Lapidus

    Gold present in arsenopyrite matrices is refractory and requires highly oxidative pretreatments in order to obtain acceptable degrees of extraction. However, these release many byproducts that are har

    Jan 1, 2014

  • CIM
    Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/Germany

    By V. Fiedler, H. Lachmund, R. Bruckhaus

    "After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised

    Jan 1, 2004

  • CIM
    The Separation of Chalcopyrite and Pentlandit from Inco's Sudbury Area Ores Pilot Plant Testwork

    By G. E. Agar, W. B. Kipkie, R. A. Tenbergen

    "This paper describes the successful pilot plant testing of a flowsheet, developed at INCO Ltd.'s J.Roy Gordon Research Laboratory (JRGRL), for improved separation of the constituent minerals in a bul

    Jan 1, 1984

  • CIM
    The “Mill Redesign Project” at Inco’s Clarabelle Mill

    By G. Labonté, J. Truskoski, A. Kerr, A. Bouchard, J. Barrett

    "Improving mill grade recovery relationships is always good business. Inco’s Clarabelle mill has just undergone a $16 M process upgrade that was designed to improve nickel recovery by 2%. The “Mill Re

    Jan 1, 2003