Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
The Development of a Novel Zinc Collector Using Both Lab and Mil Scale TrialsBy D. E. M. Plaumann, B. S. Fee, R. D. Hansen, R. R. Klimpel
"The steps from experimental curiosity through to commercial product can be slow and tortuous in spite of the quality of the technological advances offered by the new development. Data generation and
Jan 1, 1990
-
Thickened Tailings and Red Mud DisposalBy V. L. Mitsopoulos
This paper provides a summary of tailings disposal techniques and the improvements that have been made through the introduction of thickened tailings disposal. The general properties and characteristi
Jan 1, 2006
-
Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)By D. J. Parker, G. B. Tupper, I. Govender
Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t
Jan 1, 2012
-
XPS Study on the Reaction Mechanism of Chlorite with New Anionic Collector A6By Yulin Zhou, WenFeng Li, Wen Chen
"In this article, with the help of the X-ray photoelectron Spectroscopy (XPS), a modern test method, all the characteristics of the chlorite,and adsorption collector A6 on the surface of chlorite have
Jan 1, 2016
-
Effect of rare earth elements addition on thermal fatigue behaviors of AZ91 magnesium alloyBy S. Khoshkhooei
In this research, the effects of rare earth elements addition on thermal fatigue behaviors of AZ91 alloy were studied. Repeated heating and cooling cycles were applied on the samples at 170°C and 210
Jan 1, 2005
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013
-
Implementing Energy Management in the Canadian Mining IndustryBy Lauri Gregg
The implementation of Energy Management within the global mining industry has advanced significantly during the past 20 years. Consequently, the industry?s knowledge of energy efficiency improvement o
Aug 1, 2013
-
A Blast from the Past ? The Granduc TunnelBy V. Evans
Mine lateral development advance rates currently average about 5 metres (16.5 ft.) per day. Granduc Tunnel hit 35.1 metres (115 ft.) on their best day, 12 km from the portal, single heading forty-thre
May 1, 2011
-
Improvements to Grassroots and Minesite Exploration using Titan 24: Overview and Applications of Titan 24 Deep Imaging TechnologyBy Greg M. Hollyer
The search for minerals in the future will be dominated by deeper exploration and the need to accurately target ?blind? deposits as more and more of the ?easy? near surface targets are exhausted. In t
May 1, 2008
-
Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
Trends in concentrate dewatering operations in mills of the Noranda GroupBy K. V. Konigsmann
"Concentrate dewatering operations have a significant influence on the economics of base metal beneficiation. The expenditures f or energy and labour per tonne of product are high. The relatively low
Jan 1, 1984
-
A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine AreasBy Anil K. Beersing
Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring
Apr 1, 2005
-
Enabling Technologies – Diesel through HybridBy Evelynn Stirling
"The paper/presentation will review the evolution of diesel technology from older diesel engines (1990 vintage) through to the latest technology as a result of the ever changing emissions regulations.
Jan 1, 2019
-
Flotation of Pyrite in High Salinity WaterBy Qingxia Liu, Mingbo Zhang, Hongbo Zeng
The shortage of freshwater has been a major challenge for mineral flotation in arid areas. When using high salinity water, certain electrolytes are detrimental to flotation while others can improve th
Jan 1, 2015
-
Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork ProgramBy A. Allaire, J. Torrealba-Vargas, R. Welyhorsky
Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the
Jan 1, 2011
-
Improved Gold Extraction from a Refractory Arsenopyritic Ore by Chemical PretreatmentsBy Sandra L. Mesa-Espitia, Gretchen T. Lapidus
Gold present in arsenopyrite matrices is refractory and requires highly oxidative pretreatments in order to obtain acceptable degrees of extraction. However, these release many byproducts that are har
Jan 1, 2014
-
Metallurgical Optimisation after the Replacement of two BOF Vessels at Dillinger Hütte/GermanyBy V. Fiedler, H. Lachmund, R. Bruckhaus
"After producing some 50 million tonnes of crude steel the two BOF vessels at Dillinger Hüitte steel plant had to be replaced in 2000/01 due to large deformations. The new vessel design was optimised
Jan 1, 2004
-
The Separation of Chalcopyrite and Pentlandit from Inco's Sudbury Area Ores Pilot Plant TestworkBy G. E. Agar, W. B. Kipkie, R. A. Tenbergen
"This paper describes the successful pilot plant testing of a flowsheet, developed at INCO Ltd.'s J.Roy Gordon Research Laboratory (JRGRL), for improved separation of the constituent minerals in a bul
Jan 1, 1984
-
The “Mill Redesign Project” at Inco’s Clarabelle MillBy G. Labonté, J. Truskoski, A. Kerr, A. Bouchard, J. Barrett
"Improving mill grade recovery relationships is always good business. Inco’s Clarabelle mill has just undergone a $16 M process upgrade that was designed to improve nickel recovery by 2%. The “Mill Re
Jan 1, 2003