Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Headframe Design Selection In A Salt Mine Environment: Carbon Steel Vs. Stainless Steel Headframe

    By Simon Weixiao Sun

    Conventionally, carbon steel has been the primary material for salt mine headframe construction, protected by specialty paint layers to prevent corrosion. These layers require meticulous QA/QC during

    May 4, 2025

  • CIM
    Sinking Methods and Present Situation of Vertical Shafts in China

    By Zhiyang Long, Ruiling Xiao

    "A mine shaft is one main development method of establishing access in an underground mine. The construction technology of the mine shaft sinking is complicated and large equipment setup on surface an

    Jan 1, 2019

  • CIM
    Economical Manufacture of Quality Lime (caec3a53-9812-4761-a5b0-5c17ff14588a)

    By Victor Azbe

    Azbe System of Controlled Calcination To obtain good and cheap lime there are certain fundamental requirements that need to be satisfied. These are : (1) Proper combustion of fuel and steady suppl

    Jan 1, 1946

  • CIM
    Zinc Ferrite Treatment Options to Increase the Zinc Recovery at Teck Cominco's Trail Operations

    By M. A. Nagle

    Various strategic projects were carried out in 2002 to increase the capacity of Teck Cominco's integrated zinc-lead smelter at the Trail operations site in British Columbia, Canada. The lead smel

    Jan 1, 2006

  • CIM
    Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference Distributions

    By Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo

    "A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp

    Jan 1, 2009

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • CIM
    Assessment Methodologies For Girth Weld Defects In Pipelines

    By W. R. Tyson

    Imperfections such as lack-of-fusion and undercut are inevitable in field welding of pipelines. Above a certain size, such defects must be removed or repaired. In the present state of the art, determi

    Jan 1, 2010

  • CIM
    A Recommended Rock Classification for Rock Mechanics Purposes

    By T. H. Patching, D. F. Coates

    The Sub-Committee on Rock Classification, Canadian Advisory Committee on Rock Mechanics, has evolved a classification of rocks which should prove useful in studies of rock mechanics. Considered in two

    Jan 1, 1968

  • CIM
    Fabrication of seam-welded aluminum tube for hydroforming

    This paper describes results of an investigation of fracture during tube expansion of 5052 and 5754 aluminum seam-welded tubes to optimize the forming of aluminum tubes during hydroforming. The tubes

    Jan 1, 2004

  • CIM
    Pacific International Space Center for Exploration Systems (Pisces)

    By Rob Kelso

    The PISCES Goals ? To conduct research and develop programs to enable and promote planetary surface exploration ? To host international tests and technology demonstrations at the PISCES Test Site.

    May 1, 2013

  • CIM
    Monitoring of Dynamic Bolts for High Stress Mining

    By F. Charette

    The paper reviews the requirements of the instrumentation required to monitor mining excavations in a high stress environment, and the development plan to instrument the D-Bolt in such a fashion as to

    Jun 1, 2012

  • CIM
    Drilling hard siliceous sandstone strata effectively

    By Joseph J. Larry

    In hard siliceous sandstone strata overlying coal seams, roof bolting is often the bottleneck in the coal production cycle. In the past, these strata have been drilled by pneumatically operated stoper

    Jan 1, 1979

  • CIM
    The effect of slag composition control on the performance of magnesite-chrome refractory linings in top blown rotary converters

    By R. White, C. Doyle, B. Martin, C. Díaz, J. Hrepic, G. Cuthbert

    "A program initiated to improve the service life of the magnesite-chrome refractory in the top blown rotary converters at INCO’s Copper Cliff Nickel Refinery identified slag corrosion as a major wear

    Jan 1, 1997

  • CIM
    Smelting Furnace Melt Zone Wall Modification to Cope Higher Production Rate Operation

    By Antonius Prayoga

    PT Smelting adopted the Mitsubishi Continuous Technology for its copper smelter plant which has been operating since 1998. Through a series of expansion projects, the plant annual production capacity

    Jan 1, 2015

  • CIM
    Large Ring Gears ? A Topic of Concern

    By Robert M. Vadas

    Special considerations are described as they apply to the design of ring gears for high-power grinding mills. AGMA requirements, the importance of the supporting structure, material selection and rela

    Jan 1, 1978

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Design and Commissioning of Commercial Coal Preheating Plants

    By R. H. Chambers, L. Alderman

    "The paper is introduced by an examination of the factors which have led to the present world-wide interest in charging preheated coal to coke ovens. Various possible methods of preheating and chargin

    Jan 1, 1972

  • CIM
    Quasi-Real Time Seismic Hazard Maps for Mining

    By Marty Hudyma

    Mining-induced seismicity and rockbursting is one of the primary risks in deep mines. Seismic data management software has been created to facilitate analysis of mining-induced seismicity. The Mine Se

    Oct 1, 2009

  • CIM
    Process Hazard Analysis - Foundation for Managing Operational Risks

    By Palaniappan Chidambaram

    Despite the advances in processing technologies, construction techniques, inspection methods, and materials, the number of process safety incidents are still increasing, and often the same types of in

    Jan 1, 2014

  • CIM
    Climate Change and Canadian Mining: Opportunities for Adaptation

    By Jason Prno

    Context ? Climate change an issue of global significance ? Research is lacking ? Study initiated by the David Suzuki Foundation, led by ArcticNorth Consulting Industry Surveying ? 34% and 48% of

    May 1, 2010