Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Conditional Bias of Geostatistical Simulation for Estimation of Recoverable Reserves

    By Jason A. McLennan

    Conditional bias is an infamous problem with estimation methods including kriging. Changing estimation parameters will mitigate, but not remove, conditional bias. The conditional bias of kriging is we

    May 1, 2002

  • CIM
    Two-Stage Fluid Bed Reactor for Arsenic Removal and Fixation

    By K. Adham, C. T. Harris

    Arsenic is often associated with copper, nickel and gold in sulphide deposits. This paper describes a two-stage high-temperature fluid bed reactor for the removal and fixation of As from ores and conc

    Jan 1, 2014

  • CIM
    The technical-scale realization of the Kivcet Process for lead

    By Kiran B. Chaudhuri, Michael Koch, Jorg Lema Patino

    "Stricter pollution regulations together with other factors have stimulated interest in the modernization of the traditional sinter - blast-furnace lead operation. In this context, direct smelting met

    Jan 1, 1980

  • CIM
    Hyperspectral Remote Sensing Characterization of Mine Materials for Process Control

    By Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton

    Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re

    Jan 1, 2019

  • CIM
    Automatic control of underground vehicles at high speed

    By Loui Geoffroy, Philippe Gaultier, Martin Piotte, Claude Coache, André Drouin

    "Automatic driving at high speed of an underground truck was tested at Brunswick mine in September 1995. Modifications to the truck included: a remote interface to control actuators, front and back vi

    Jan 1, 1997

  • CIM
    Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

    By Kazem Oraee

    Implementing stable final pit walls in open pit mines during the open pit design phase and mine exploitation has become one of the most important concerns of mining engineers in recent years. Failure

    Aug 1, 2013

  • CIM
    Selecting Effective Hydrogen Production and Delivery Optionis for Mining Applications

    By Kimberly M. Curran

    The path by which hydrogen supply is provided to any end use application will have a strong effect on the specific economics and price stability for the product supply and the flexibility with which i

    May 1, 2007

  • CIM
    Actiflo® Clarification For Mining Application: Efficient And Compact Technology

    By Gaétan Bourdages

    A clarification technology used by municipalities to produce high-quality drinking water, polish sewage treatment plant effluent and handle combined sewer overflows has recently found new applications

    Feb 1, 2008

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004

  • CIM
    The Autonomous Real-Time System for Ubiquitous Construction Resource Tracking

    By M. Soleimanifar

    With more and more industrial construction projects implementing RFID and other sensor-based technologies on fabrication and project sites, new innovative processes are needed to help automatically re

    Aug 1, 2013

  • CIM
    A calibration probe for level detection systems in flotation columns

    By A. Uribe-Salas, J. A. Finch, B. J. Huls

    Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat

    Jan 1, 1990

  • CIM
    Applications of Engineering Analysis to Improve Tire Management

    By Jie Zhou

    Mining mobile equipment is becoming larger in order to lower operation cost and increase productivity; however, their performance characteristics are often limited by the tire capabilities. Although c

    May 1, 2006

  • CIM
    A Technique for Rapid Compass-and-Pace Surveying of Streams

    By P. C. Parsons, G. C. Milligan

    "IN FIELD WORK in the Cape Breton Highlands, which are heavily covered with vegetation, it is necessary to run traverses along the valleys of small brooks. We encountered difficulty in closing such tr

    Jan 1, 1971

  • CIM
    Shaft Sinking at Falconbridge

    By E. N. Gilje

    "IntroductionDURING the past five years, over two miles of shaft sinking have been completed at Falconbridge. As sinking has continued, we have improved our equipment and technique with a resulting in

    Jan 1, 1955

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Autoclave Gas Vent Flow Modeling that Illustrates the Effects of Water Injection

    By I. Farr, M. R. Mock, J. C. Robison

    "HPAL and POX autoclave vapor-space gasses are vented through an autoclave PCV (Pressure Control Valve). The downstream steam-born mist of liquid droplets and solid particles travels in excess of 1000

    Jan 1, 2017

  • CIM
    A general purpose computer program for data analysis in exploration

    By W. R. Green, B. W. Barde

    "Geological exploration involves the collection and analysis of a wide variety of information. A basic problem in interpretation is to determine the interrelationship s of the different data. A number

    Jan 1, 1984

  • CIM
    Computer process control for the Kudremukh Iron Ore Company Limited

    By V. Balakrishnan, A. Hewitson

    "The Kudremukh Iron Ore Company Limited, a government of India enterprise, has constructed iron ore mining, crushing, handling and concentrator facilities at Kudremukh, in southwest India. Concentrate

    Jan 1, 1984

  • CIM
    New bearing application for pinion gear drives on mine hoists

    By R. A. McIvor, R. Levac

    "The Stobie No. 7 shaft, 14 ft diameter, double- drum skip hoist, was installed at the INCO Limited Frood Stobie Complex in 1942. Figure 1 shows the hoist layout. The hoist was originally equipped wit

    Jan 1, 2001

  • CIM
    Coal preparation in the western foothills and mountains

    By Stanley G. Butcher

    "Introduction Many operators in western Canada, with a background in the minerals industry, talk of ""coal beneficiation"", whereas the coal industry generally uses the term ""coal preparation"" . The

    Jan 1, 1985