Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High Pressure Direct Injection of Natural Gas in a Diesel Engine for High Performance/Low Emissions

    By K. Bruce Hodgins

    The North American mining industry faces challenging emissions regulations in coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, industry

    May 1, 2002

  • CIM
    Thermodynamic Modeling of the Mn-RE Systems for the Application of RE in Mg Alloy Development

    By I-H. Jung, J. Kim

    "Mg alloys are extensively used as light structural materials in modern industry. Mn and RE (rareearth) metals are effectively used as alloying elements to enhance the properties of Mg alloys. Therefo

    Jan 1, 2012

  • CIM
    Mapping Orebody Hardness Variability for AG/SAG/Crushing and HPGR Circuits (fe3522cb-a012-40ec-8345-267cf67eef3d)

    Arguably the SMC Test® has become the most popular laboratory hardness test in the world with over 17,000 tests having been completed to date, covering over 650 different ore bodies. It is now routine

    Jan 1, 2012

  • CIM
    New technology for the abatement of SO2 in nonferrous pyrometallurgical processes by a dry limestone scrubber

    By F. Parada, R. Parra

    "The neutralization process of SO2 from coal burning plants is a well-defined technology using limestone to form CaSO4 according to the following reaction: CaCO3 + SO2(g) + 1/2O2(g) = CaSO4 This paper

    Jan 1, 2007

  • CIM
    Effect of Impurity and Pretreatment Conditions on the Catalytic Activity of Au Powder for CO Oxidation

    By Yasuo Iizuka

    We have had studied CO oxidation on unsupported Au powder (mean particle size, ca.100nm) manufactured by evaporating ultra high purity gold metal (>99.99%) in inert gas and reported that it showed som

    Oct 1, 2003

  • CIM
    Forward Osmosis for Industrial Process Water Recovery: The Case of TMA-CO2-H2O as Draw Solution

    By V. G. Papangelakis, T. Clark, G. Kolliopoulos

    Sustainability of the hydrometallurgical industry requires the development of processes for effective water recovery; if process water is recovered and recycled, fresh water intakes will be reduced. F

    Jan 1, 2015

  • CIM
    Potential of Leading Indicator Data Collection and Analysis for Proximity Detection and Alert Technology in Construction

    By Eric D. Marks

    Fatalities resulting from ground workers colliding with objects and construction equipment accounted for approximately 18% of the total construction fatalities experienced in 2010. Current injury and

    Aug 1, 2013

  • CIM
    Sherritt Zinc Pressure Leach Study for China Western Mining Company: High Zinc Extraction at High Altitude

    By Z. Yang, M. J. Collins, N. E. Tuffrey, R. J. Kalanchey, I. M. Masters

    The high elevation of China Western Mining Company (WMC)' s Ganhe refinery, and the high iron content of concentrates produced by the WMC mines, were key factors in the selection of pressure leac

    Jan 1, 2008

  • CIM
    Mathematics Model and Programming Realization of the Varying-Rate Gas Drainage Process for a Sealed Lane

    By H. G. Wang

    The production process of a coal mine can often be interrupted by all kinds of events scheduled or unscheduled and thus often needs gas drainage for a temporary or long-term sealed area. Gas drainage

    Aug 1, 2013

  • CIM
    Mineralogical Control of the Form of Ferric/Ferrous Precipitates for Effective Treatment of Acid Mine Drainage

    By Yugo Mitani, Tatsuya Kato, Chiharu Tokoro, Abdullah Al Mamun

    Acid mine drainage (AMD), which is a major source of mining pollution, often contains ferric and/or ferrous ions together with several toxic elements. The ferric and ferrous ions in AMD precipitate in

    Jan 1, 2016

  • CIM
    BILMAT: An algorithm for material balancing mineral processing circuits Applications to comminution, desliming and flotation circuits

    By E. Kouame, M. D. Everell, D. Hodouin, T. Kasongo

    "To properly operate a mineral beneficiation plant it is often necessary to have systematic evaluations of the performances of a piece of machinery, of one of the processes or of the plant as a whole.

    Jan 1, 1981

  • CIM
    A study of copper smelting reverberatory furnace design and performance and methods available for increasing throughput

    By M. A. T. Cocquerel, M. G. Burcher, J. G. Eacott

    "This paper is based on work carried out to examine the feasibility of increasing the smelting rate of two oil-fired calcine-charged reverberatory furnaces . Various constraints prevented physical enl

    Jan 1, 1980

  • CIM
    Leaping Forward in SAG and AG Mill Simulation sing a Mechanistic Model Framework

    By R. M. de Carvalho

    Empirical and phenomenological models of SAG and AG mills have dominated the scene for the last few decades, being used nearly every time a mill is scale-up or an attempt is made to improve its perfor

    Jan 1, 2012

  • CIM
    Simple ways for reducing equipment queuing time at a repair shop in an open pit operation

    By Jean-Luc Collins

    "This paper shows how simple reliability concepts such as mean time between failures and mean repair time can be used efficiently to help increase equipment availability and so reduce the economic los

    Jan 1, 1988

  • CIM
    The Manpower Problem in the Petroleum Industry

    By V. Taylor

    "THE petroleum industry in Canada has been experiencing considerable difficulty in filling its manpower requirements during the last few years, and because of the rapidly expanding nature of the indus

    Jan 1, 1967

  • CIM
    The Use of Hydraulic Cyclones in the Filtration of Sullivan Lead Concentrates

    By D. B. Smith

    DURING the summer of 1953, test work commenced at the Sullivan Concentrator with a view to the modification of filtration practice by the inclusion of wet cyclone classification of the lead concentrat

    Jan 1, 1956

  • CIM
    Distribution of Tensile Stress under Modified Boundary Condition in Theoretical Solution for the Diametrical Compression Test

    By T. Tsutsumi, S. Kukino

    "During the diametrical compression test, the tensile stress generated near the loading plate is influenced by the contact area between the loading plates and specimen. However, very few studies have

    Jan 1, 2015

  • CIM
    Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff Mine

    By Mehdi Razavi

    Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope

    Oct 1, 2010

  • CIM
    Continuous SAG Volumetric Charge Measurement

    By Andre Vien, Jean-François Dupont

    "Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p

    Jan 1, 2001

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Abstract-Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited ab

    Jan 1, 1992