Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill FacilitiesBy Godfrey MacDonald
"The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East
Jan 1, 1997
-
Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing PlantBy Willemijn Husslage
Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000
May 1, 2011
-
A Novel Approach to Recover Precious Values from Low-Grade Canadian OresBy V. I. Lakshmanan, D. A. Mackie
"1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven
Jan 1, 1989
-
Laser-MIG Hybrid Welding of Maraging SteelBy K. V. Phani Prabhakar, G. Padmanabham1, L. Subashini
Laser-arc Hybrid Welding (LAHW) is a relatively recent concept which effectively combines the advantages of laser welding such as the high depth of penetration, low heat input, high welding speed and
Jan 1, 2014
-
Control of Bias and Level in a Laboratory Flotation ColumnBy André Pomerleau, Michel Grégoire, René del Villar
"The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble
Jan 1, 1999
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper MineBy M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999
-
Development of the Rainy River Gold Project and Processing PlantBy Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016
-
Inspection Techniques - Non-Destructive Evaluation – Mill Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) TechniquesBy Tom Shumka
"All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it be every six months to every three years. The inspection frequency dep
Jan 1, 2012
-
Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing CircuitBy Dave Rose, David G. Meadows, Mike Westendorf
"Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a
Jan 1, 2016
-
Magnetic Gold: Losses from a Gold Recovery CircuitBy Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher
A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl
Jan 1, 2014
-
Gravity Recoverable Gold and the Mineral Liberation AnalyserBy Philip J. Guerney, S. O’ Leary, André R. Laplante
"Concentration of dense mineral phases (s.g. greater than 7) for characterisation of individual particles and mineral grains by electron microscopy is a well established technique for the detection an
Jan 1, 2003
-
ISO/TC 127 Standards for Earth-Moving Machines Update on ISO/ TC 82 Mining mtg ?Lünen, Germany ?25 Apr 2013Information on ISO/TC 195 Building & Road Construction MachineryBy Chuck Crowell
ISO Standards ?Provide Information to Address Commercial and Safety Needs for Standardization: ?Definitions and Terminology ?Test Methods ?Performance Criteria ?Conformity Assessment Process ?D
May 1, 2013
-
Characterization of Mineralization in the Sullivan-North Star Corridor and Enhanced Exploration for Other Mineral Deposits in the Purcell Basin, Southeastern British Columbia: Application of High-resolution Airborne GeophysicsBy D. A. Brown, C. Lowe
"Abstract -A multi-sensor (electromagnetics, magnetics, gamma-ray spectrometry, and VLF) geophysical survey was recently conducted in the Purcell Basin of southeastern British Columbia in an area enco
Jan 1, 1998
-
Generation of Size-controlled Palladium (0) and Gold (0) Nanoclusters inside of the Microporous Domains of Gel-type Functional Resins. Prospects for Gold Catalysis in the Liquid PhaseBy Benedetto Corain
The production and dispersion of metal nanoclusters onto inorganic supports and amorphous carbon rest on well consolidated technologies belonging to the realm of industrial catalysis and of basic cata
Oct 1, 2003
-
An integrated hydraulic mining, selective agglomeration and hydraulic transportation process for Western Canadian coals - Part 1: Selective agglomeration of metallurgical coal in stirred tanks and in a pipeline loopBy W. Pawlak, J. Janiak, C. Rodkiewicz, B. Ignasiak
"There is a general consensus that, in order to widen the utilization of Western Canadian coals, a major effort must be devoted to their transportation, utilization of fines, beneficiation and mining
Jan 1, 1986
-
Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian OrogenBy K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy
"Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri
Jan 1, 2008
-
The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central AmericaBy Paul Hosford, Tim Haldane
"The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate
Jan 1, 2002
-
Installation of Flash Flotation Units at the Louvicourt ConcentratorBy Bernard Dallaire, Jean Cayouette, Sylvain Duchesne
"Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues
Jan 1, 2001
-
Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing FacilitiesBy Monique Pharand, Jeet Basi, Simon Hille
"High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M
Jan 1, 2016
-
Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative LeachingBy Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama
In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under
Jan 1, 2019