Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Goldstrike pressure oxidation plant process and engineering design, construction and commissioning

    By K. S. Fraser, H. J. H. Pieterse

    "A pressure oxidation plant to pretreat refractory sulphide ore at the Goldstrike plant in Nevada, was commissioned in early February 1990. The plant, with a nominal capacity of 1363 t/d, was commissi

    Jan 1, 1992

  • CIM
    Structural character of en echelon polymetallic veins at the Silver Queen mine, British Columbia

    By H. L. Cheng, C. H. B. Leitch, C. T. Hood, A. J. Sinclair

    "Epithermal Zn-Pb-Cu-Ag-Au quartz-carbonate-barite veins at the Silver Queen mine near Owen Lake, west-central British Columbia, are hosted by Late Cretaceous Tip Top Hill andesitic volcanic rocks. Th

    Jan 1, 1991

  • CIM
    Rabbit Lake project - mining and development

    By G. W. Clark

    "The mining of the ore bodies at Rabbit Lake has in the past been by the open pit method. This method is presently being used to develop the B-zone and will continue into the future with the developme

    Jan 1, 1989

  • CIM
    Exploration drilling of evaporites: procedures developed in eastern Canada

    By D. C. Carter, J. P. Anderle

    "Exploration drilling of evaporite sequences in eastern Canada has undergone significant changes in equipment, techniques and philosophy since the early 1970s. The result has been the recovery of full

    Jan 1, 1990

  • CIM
    Sedimentary exhalative (sedex) zinc-lead-silver deposits, northern Canadian Cordillera

    By R. C. Carne, R. J. Cathro

    "Most of the recent large discoveries of zinc, lead and silver in Western Canada are Paleozoic-aged stratiform deposits that occur within the limits of the tectonic sub-province of the Canadian Cordil

    Jan 1, 1982

  • CIM
    Rhyolite geology at Kidd Creeka progress report

    By P. R. Goad

    "Kidd Creek is a large volcanogenic base metal sulphide deposit, located near the west end of the Abitibi greenstone belt, 27 km north of Timmins, Ontario. The rhyolite geology is characterized by a N

    Jan 1, 1985

  • CIM
    Ground geophysical surveys over the McClean uranium deposits, northern Saskatchewan

    By N. Saracoglu, R. H. Wallis, J. E. Betz, F. L. Jagodits, B. R. Krause

    "Geophysical test surveys were conducted with various methods (EM, lP, gravity and magnetic) over the McClean uranium deposits of the Canadian Oxy- lnco Joint Venture. The result s were assessed to ju

    Jan 1, 1986

  • CIM
    North Star and Don Jon Mines

    "The North Star and Don Jon copper deposits lie beneath the waters of Thompson Lake, which is 12 miles east of Flin Flon, Manitoba. The deposits were discovered during the years 1949 and 1951 by diamo

    Jan 1, 1949

  • CIM
    Canam Deposit

    By W. R. Bacon

    "The Canam property is in southern British Columbia, 24 miles southeast of Hope. It is reached by 5 miles of road from Mile 26 on the Hope-Princeton Highway.Between the years 1930, when the property w

    Jan 1, 1949

  • CIM
    Notes on East Coulee Coal Area, Alberta

    By Gordon L. Kidd

    The object of this paper is to show the relations of the East Coulee coal area to the near-by Willow Creek, Wayne, Rosedale, and Drumheller areas, all being parts of the Drumheller field. The word ?ar

    Jan 1, 1929

  • CIM
    Bankfield and Tombill Mines

    By A. F. Matheson

    "Bankfield Consolidated Mines, Limited, and Tombill Gold Mines, Limited, in the Little Long Lac area, Ontario, mined an orebody that was common to both. The discovery' of this orebody was made by surf

    Jan 1, 1954

  • CIM
    Flin Flon Mine

    By Geology Staff, C. H. Stockwell

    "The Flin Flon base metal mine, owned and operated by the Hudson Bay Mining and Smelting Company, is on the Manitoba-Saskatchewan interprovincial boundary at a point 400 miles north of the Internation

    Jan 1, 1954

  • CIM
    Madsen Red Lake Mine

    By Russell McIntosh

    "The Madsen mine is in the southeastern part of Baird township, in Red Lake area, Ontario. It lies about 6 miles southwest of the town of Red Lake, with which it is connected by an all-weather road.Th

    Jan 1, 1954

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    Gold Deposits, Exploration Realities, and the Unsustainability of Very Large Gold Producers

    By H. R. Bullis

    "Abstract- This paper discusses what appears to be a flaw in the current belief, widely held within the gold mining industry and investment community, that the creation of ever-larger gold mining comp

    Jan 1, 2001

  • CIM
    Uranium Processing, A Review of Canadian Developments

    By K. D. Hester

    "1.0 INTRODUCTIONThe uranium industry started in Canada with the reopening of the gravity concentrator at Eldorado's Port Radium mine in the North West Territories in 1942. In 1948, uranium exploratio

    Jan 1, 1987

  • CIM
    Development of a Mathematical Programming Model to Support the Planning of Short-Term Mining

    By Camilo I. Morales

    At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same

    Oct 1, 2009

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000