Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Aluminum Ships: Myths and Facts

    By T. Lamb

    There are many honor stories about aluminum in the marine environment and many are not based on facts, so they are myths. Myths must be addressed before progress can be made. This paper attempts to di

    Jan 1, 2011

  • CIM
    Filtration of Copper Smelter Gases at Hudson Bay Mining and Smelting Company, Limited

    By D. J. Robertson

    "THE copper smelting operation of the Hudson Bay Mining and Smelting Company, Limited, at Flin Flon, Manitoba, generates a gas flow of 350,000 c.f.m. at n.t.p. This gas stream passes to atmosphere thr

    Jan 1, 1960

  • CIM
    The Ecstall Story: The Ecstall Concentrator

    By Michael P. Amsden

    "THE ECSTALL CONCENTRATOR is situated adjacent to Highway 101 and the Ontario Northland Railroad, 15 miles east of Timmins, Ontario. Ore is delivered to the concentrator by rail from the mine, which i

    Jan 1, 1974

  • CIM
    Influence of Geomechanical Processes on Relative Permeability

    By Mohamed Hamoud

    Relative permeability curves represent an important element of special core analyses, but challenges remain in obtaining valid results and the extrapolation and use of existing permeability results is

    Jun 1, 2012

  • CIM
    Ventilation Strategy Related to Battery Powered Equipment at Macassa Mine

    By S. Ross, M. Mayhew

    "Kirkland Lake Gold introduced battery equipped vehicles (BEVs) at the Macassa Mine in 2011. The fleet of underground BEV haulage trucks and loaders has grown over the years to over 30 units, the worl

    Jan 1, 2019

  • CIM
    Present and Future Challenges in the Aluminum Casting Industry

    By D. Bernard

    Over the last decades, the wrought aluminum casting industry has made significant progress with regards to process consistency by the introduction of new technologies in the field of liquid metal proc

    Jan 1, 2006

  • CIM
    Mineral Processing Education in the United States

    By Kathleen A. Altman

    "This paper supplements the information provided annually at the Canadian Mineral Processors Operators Conference regarding the education of Mineral Processors in Canada. The purpose of the paper is t

    Jan 1, 2008

  • CIM
    Mine backfill design and testing

    By Robert J. Mitchell

    A general approach to mine backfill design, including laboratory testing procedures, is outlined in this paper. Relationships between certain design parameters are developed and the effect of other fa

    Jan 1, 1979

  • CIM
    Sinking of a Circular Air Shaft to No. 12 Colliery at New Waterford, N.S.

    By W. C. Risley

    IN the year 1933, workings at the No. 12 colliery, New Waterford, of the Dominion Coal Company, Limited, had advanced to a point where additional ventilation would soon be required. Furthermore, devel

    Jan 1, 1936

  • CIM
    East Boulder Mine - A River Runs Through It

    By Ken J. Brouwer

    Stillwater Mining Company commenced construction and development of the East Boulder underground mine in 1998. This new PGM mine is situated adjacent to the East Boulder River approximately 35 miles s

    May 1, 2002

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    One Hundred Years of Electrolytic Copper Production in Finland

    By P. Latostenmaa, O. Forsén, M. Lundström, J. Aromaa

    The history of electrolytic copper production in Finland is closely connected with the industrialization of Finland and events of the Second World War. Production of cathode copper by electrowinning f

    Jan 1, 2019

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    Review of Chemical Methods

    By F. T. Rabbitts

    Introduction When the investigation of radioactive ores began at the Mines Branch about five years ago it was at once evident that improved chemical methods for the determination of uranium were esse

    Jan 1, 1952

  • CIM
    Applied Research in the Bituminous Coal Industry

    By Henry F. Hebley

    THE solid fuel industry, especially that branch represented by bituminous coal, is gradually becoming aware of its ? paramount importance in a world where there is an ever increasing demand for the pr

    Jan 1, 1945

  • CIM
    Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations

    By A. Khan

    The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con

    Aug 1, 2013

  • CIM
    Characteristics of Coal Supplied by Eastern Producers for Use in Thermal Generating Stations

    By Paul R. Terry

    This paper presents a brief picture of the quality of coal produced in Eastern Canada for use in thermal generating stations. It describes, in particular, the characteristics of coals burned in six po

    Jan 1, 1965

  • CIM
    Insurability of Large Gearless Mill Drives

    By L. Bos

    The availability and reliability of large grinding mills and their Gearless Mill Drives (GMDs) are of paramount importance for the grinding process. Although GMDs have been in service for decades, and

    Jan 1, 2012

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    A Complete System for On-Stream Particle Size Analysis

    By B. F. Osborne

    "A new sensor cannot be considered in isolation from the process in which it is utilized. This paper, describing an on-stream particle size analyzer, therefore gives considerable emphasis to the slurr

    Jan 1, 1972