Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Rupture Dynamics and Source Scaling Relations of Microseismic Hydraulic Fractures in Shale Reservoirs

    By T. Urbancic, Eric von Lunen, G. Viegas, A. Baig

    "The characterization of the failure process of induced fractures by hydraulic stimulation is fundamental to understanding the generation and evolution of the discrete fracture network within the rese

    Jan 1, 2015

  • CIM
    The Hoist and Other Equipment at the Lake Shore Mine

    By D. L. Cramp

    The Direct-Connected Electric Hoist In the latter part of 1931 a new electric hoist was installed at the Lake Shore mine. A number of interesting features were incorporated in this machine, which is

    Jan 1, 1933

  • CIM
    Studies of Compositional and Corrosion Properties of Nanostructured Superhydrophobic Thin Films on Aluminum Substrates

    By D. K. Sarkar, Ying Huang

    "Superhydrophobic thin films were fabricated on aluminum alloy substrates by chemical etching followed by passivation with organic acid molecules; (ii) electrophoretic deposition (EPD) of functionaliz

    Jan 1, 2016

  • CIM
    The Application of Mining, Minerals and Sustainable Development?s ?Seven Questions of Sustainability? to a Planning Process in Alberta

    By Don Peel

    Mineral aggregate, the most widely used mineral resource globally, has attracted little academic or public interest. Of all mining developments, the aggregate resource is seldom factored into resource

    May 1, 2004

  • CIM
    An integrated Truck Management Information System (Truck MIS) Concept

    By Leroy G. Hagenbuch

    "IntroductionAn integrated Truck Management Information System (Truck MIS) evolves as seemingly separate functions combined to yield a single homogeneous result / product. The concept of a computer in

    Jan 1, 1986

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • CIM
    Secondary Blasting and Car Loading at Flin Flon

    By H. A. Kramer

    The Flin Flon mine is at present hoisting 5,000 tons of ore daily. In 1943, a peak production of 6,188 tons daily was maintained. Before discussing secondary blasting, it is felt that a short review o

    Jan 1, 1946

  • CIM
    Evolution of the Teniente Converter- Caletones Smelter

    By C. Carrasco

    Caletones Smelter, Division El Teniente of Codelco Chile, has used Teniente Converter (TC) as the only smelting unit since November 2000. The modernization project considered the shutdown of the last

    Jan 1, 2007

  • CIM
    Achieving business results through IT: Insuring controller performance benefits with web-enabled monitoring at Noranda

    By L. Lariviere, M. Grenier, R. Khalili, D. Shook

    A mineral processing facility near Montreal, CEZinc, Noranda Inc., has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition

    Jan 1, 2003

  • CIM
    Strength and Grade Relationships For a Copper-Zinc Sulphide Ore

    By J. E. Udd

    A core sample for this study was taken from the sulphide ore of the Geco Mine. The subsequent research was based on the assumption that a part of the scattering of strength-grade data could be correla

    Jan 1, 1977

  • CIM
    The Benefits and Challenges of “Split Milling” at the Williams Mill

    By Glenn Norris, Tyler Buckingham

    "Gold recovery gains in the order of one to two percent have been realized in 2009 due to changes in the operation of the grinding circuits at Barrick Gold Corporation’s Hemlo - Williams Mill. The ini

    Jan 1, 2010

  • CIM
    Roasting and Smelting Practice at the Thompson Plant of The International Nickel Company of Canada, Limited

    By J B. McConnell

    The Thompson smelter has three unique features which form the basis ~f its design: fluid bed roasters which treat nickel concentrate filter cake from the mill, as well as the flux, in order to achieve

    Jan 1, 1963

  • CIM
    Estimation des débits de gaz dans les fours de durcissement de boulettes d'oxyde de fer

    By Claude Gosselin

    En 1995, la Compagnie minière Québec Cartier a mis de l'avant un projet de recherche sur la modélisation de l'écoulement des gaz pour ses fours de frittage à l'usine de bouletage de Por

    May 1, 2001

  • CIM
    Mining Gold Ore at Pioneer

    By Allan P. Fawley

    ONE hundred miles from Vancouver, at an elevation of 4,000 feet, is the Pioneer mine. It is situated on Cadwallader creek, a tributary of Bridge river, and is reached by travelling from Vancouver to S

    Jan 1, 1937

  • CIM
    Continuous minicell test of collectorless flotation at Mattabi Mines Ltd.

    By M. Leroux, S. R. Rao, J. Kim, J. A. Finch

    "Continuous in-plant testing of collectorless Cu/Pb bulk flotation on Lyon Lake ore at Matlabi Mines Ltd. Was conducted using a portable circuit based on 5 L mini flotation cells. It is concluded that

    Jan 1, 1994

  • CIM
    The Spiral Stoping System as Applied at the Beattie Mine

    By Jay Tuttle

    THE spiral stoping method of mining was first seen by the writer at the Granby Consolidated Mining, Smelting & Power Company's Hidden Creek mine, at Anyox, British Columbia. Where the method re

    Jan 1, 1939

  • CIM
    The Effect of Sample Size on the Created Fracture Surface by the Splitting (Brazilian) Test

    By R. Simon, A. Khosravi

    "Tensile strength of rock samples is measured by direct and indirect tensile tests in accordance with standard guidelines. Due to the difficulties in performing direct tensile test, the indirect tensi

    Jan 1, 2015

  • CIM
    An Economic and Environmental Case for Re-processing Gold Tailings in South Africa

    By James A. Brown, Marius Botha, Christopher A. Fleming

    "The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig

    Jan 1, 2010

  • CIM
    Conversion of Dome Mine No.8 shaft timber guides to steel guides and refits of shaft hardware and skips

    By W. G. Spencer, E. Sulis, P. M. Tiley

    "Dome Mine's No.8 shaft is located about 1 km northeast of Dome's No.3 shaft and mill complex in South Porcupine, Ontario.No.8 shaft was brought into production in 1984 to hoist ore and wast

    Jan 1, 1993

  • CIM
    Removal of Arsenic and Dissolution of Copper from Arsenic Bearing Copper Ore by High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama, Ryuji Oinuma

    "Recently, the arsenic grade in copper ores has been increasing year by year. Arsenic bearing minerals (enargite (Cu3AsS4) and tennantite (Cu12As4S13)) coexist with typical copper minerals such as cha

    Jan 1, 2016