Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • CIM
    An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan

    By J. Yue

    "Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of

    Jan 1, 2017

  • CIM
    The Earth Moving Equipment Safety Round Table Design Evaluation for Equipment Procurement Process

    Diverse and considerable energies are associated with mobile equipment operated and maintained on mine sites. Loss of control of these energies is a common cause of injury on mine sites and this is we

    Aug 1, 2013

  • CIM
    Applicability of Near-Infrared Hyperspectral Imagery (NIR-HI) For Sensor Based Sorting of an Epithermal AU-AG Ore

    By F. J. A. van Ruitenbeek, M. Dalm

    In the presented study test work was performed with near-infrared hyperspectral imagery (NIR-HI) on 36 ore samples from a South-American epithermal Au-Ag mine. The aim of the test work was to investig

    Jan 1, 2015

  • CIM
    Modernization and Start-Up of the Spcc Ilo Smelter

    By W. Torres Pino, L. Mariscal Samaniego

    The Ilo Smelter has been continuously operating since 1960 with Reverberatory furnaces and Pierce Smith converters producing blister copper. The original installed capacity of 1.134 tons per day of co

    Jan 1, 2007

  • CIM
    Purification of solid from secondary aluminum smelting dross

    By J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.

    Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,

    Jan 1, 2005

  • CIM
    Copper Recovery from Electric Cable Scrap by Shaking Tables

    By C. -M. Katsari, G. N. Anastassakis

    "Copper is considered one of the most important industrial metals because of its properties (conductivity, malleability) and variety of uses. Approximately 70% of the global copper is used for various

    Jan 1, 2016

  • CIM
    Comparative Grinding Pilot Test of Grinding Balls vs. Balls/Mill Pebs Blend

    By V. K. Alves, P. Lacoste-Bouchet

    "In order to improve ball milling efficiency in pellet plants, Companhia Vale de Rio Doce (CVRD), experiments new technologies in Santa Luzia (M.G. – Brazil) research center facility. Pilot grinding t

    Jan 1, 2005

  • CIM
    Recovery of Platinum Group Minerals from Grinding Circuits: A Protocol for Prediction

    By N. Mejia, Z. Xiao, D. Fragomini, A. R. Laplante

    "The adaptation to platinum-group minerals (PGMs) of a protocol developed to predict gold recovery by gravity is presented. The protocol is based on three different data sets: ore characterization of

    Jan 1, 2004

  • CIM
    Recent Gravity Improvements at the Porcupine Joint Venture

    By Ron Millions, J. A. Folinsbee, Ishwinder Grewal, Michael Fullam, Don Strickland, Tony Y. Chong

    "Since milling began in 1912, the Dome mill, now part of the Porcupine Joint Venture (PJV), has been expanded several times, the most recent increasing the milling rate from 3,500 to 11,500 tonnes per

    Jan 1, 2004

  • CIM
    Overburden Mining Improvements at Suncor Energy?s Millennium Mine

    By Timothy D. Dreger

    In the spring of 2009, Suncor Energy Inc. technical personnel saw an opportunity to improve planning 0and mining of overburden material in order to address aggressive construction goals and increased

    May 1, 2011

  • CIM
    Universal Kriging For Ore-Reserve Estimation- Conceptual Background and Application to the Navan Deposit

    By N. W. D. Davis

    "As I have recently carried out some further research on the Navan lead-zinc deposit data while working in Michel David's research team, I should like to add a few comments on the paper- ""Universal K

    Jan 1, 1976

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Diamonds: A Canadian Perspective

    By John Lindsay

    "Although diamond mining is a relative newcomer to the Canadian mining industry, with the first diamond mine coming on stream in 1998, Canada is already a significant producer of high quality diamonds

    Jan 1, 2003

  • CIM
    Carbon-in-Pulp and Carbon-in-Leach Adsorption Circuits -Optimization of Design Using the Carousel System

    By N. Morrison, E. J. Rogans, A. J. Macintosh, N. Schoeman

    "The design of carbon-in-pulp (CIP), and carbon-in-leach (CIL) adsorption circuits has essentially remained unchanged since the early days of the carbon process for gold recovery. For CIP circuit the

    Jan 1, 1998

  • CIM
    Data Acquisition from an Industrial Zinc Flotation Circuit

    By A. Wright, P. Lacombe, R. del Villar, D. Hodouin, C. Sepulveda

    "The data acquisition from industrial plants is a fundamental step for process modelling in process optimization, process analysis and automatic control.The introduction, some years ago, of modern dis

    Jan 1, 1991

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • CIM
    West Bay Fault

    By N. Campbell

    "The fault under consideration follows a northerly trend past the west; side of the original settlement of Yell ow knife; which is situated 600 miles; north of Edmonton and 400 miles from the Northern

    Jan 1, 1954

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Galvanic Interaction and Particle Size Effects in Self-Heating of Sulphide Mixtures

    By Jan E. Nesset, James A. Finch, Frank Rosenblum, Rebecca Payant

    "Under certain conditions of moisture and oxygen, sulphides can spontaneously heat, a phenomenon known as self-heating. In this paper, we test a hypothesis that galvanic interaction between some sulph

    Jan 1, 2011