Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Research on the Comparison of Operator Viewpoints Between Manned and Remote Control Operation in Unmanned Construction Systems

    By Akihiko Nishiyama

    Unmanned construction technology used for remote control operation of construction machines has some problems to solve compared with manned operation of construction machines, such as fatigue due to l

    Aug 1, 2013

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    Odor Sensors for Ore Sorting and Mill Feed Control

    By Michael G. Nelson

    Control of the feed provided to mineral processing facilities is a continuing challenge. Much effort is currently being devoted to overcoming these problems. These projects are usually described under

    May 1, 2004

  • CIM
    Crack Detection and Seal-Lock Casting Repair

    By E. Ettles

    This paper features some of the spectacular new advances in the fields of fluorescent penetrant inspection and magnetic particle concentration. Casting fractures in the various stages -before the repa

    Jan 1, 1971

  • CIM
    A New Perspective on Kinetics of Chalcocite Leaching

    By V. Concha, M. Hashemzadeh

    "The objective of this study was to gain a better insight into the kinetics of chalcocite leaching in an acidic ferric sulfate media. Chalcocite leaching in acidic media is known to occur in two seque

    Jan 1, 2017

  • CIM
    Shaft Sinking at Rouyn Merger Gold Mine

    By L. J. Cunningham

    Introduction The property of Rouyn Merger Gold Mines, Limited, is in Rouyn and Joannès townships, Western Quebec, seven miles east of the town of Rouyn. Traversing it is the east-west trending Cadi

    Jan 1, 1948

  • CIM
    Modification of Feeding System for the Smelting Furnace and Other Recent Improvements at Gresik Copper Smelter

    By Kenta Kusunose, Dadang Sundana, Ahmad Munib Fikry, Yosuke Unno

    PT Smelting has operated the Mitsubishi Process in which feed materials are charged into the S- furnace through top lances using a pneumatic conveying system comprising 6 feeding tanks (S-Feeding Tank

    Jan 1, 2019

  • CIM
    The Red Dog VIP Mill Optimization Project - A Study in Fast-Track Project Execution and Alliance Contracting

    By Steve W. Ciccone

    The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes per

    May 1, 2002

  • CIM
    Project Execution & Cost Escalation in the Mining Industry

    By John A. Wells, Leticia Conca, Kenneth G. Thomas

    "Since about 2002 there has been significant capital cost escalation, not inflation, in the mining industry causing turmoil for successful project completion. Project capital costs have more than doub

    Jan 1, 2014

  • CIM
    Interpretation of some geochemical distributions in Key and Seahorse Lakes, Saskatchewan

    By G. R. Parslow

    U, Fe, Mn, Ni, Cu, Zn and Co data for the sediment in both Key and Seahorse lakes, which overlie portions of known economic uranium deposits in the region, are presented. With the exception of U, Fe a

    Jan 1, 1979

  • CIM
    Investigation into Laboratory Scale Tests for the Sizing of High Pressure Grinding Rolls (36201383-38b6-40ff-a8ef-b5e69088dfb5)

    By J. Drozdiak

    In this paper we present the results of preliminary investigations into the applicability of new laboratory scale tests for the prediction of operating gap and specific throughput in high pressure gri

    Jan 1, 2012

  • CIM
    Research on the Influence of Grain Size Composition on Cassiterite Recovery

    By T. Guan, G. Fu, X. Zhou, L. Deng

    "One kind of tailings from gravity separation of polymetallic mine contains 0.5–0.8% SnO2. The proportion of –0.037 mm size fraction of the tailings is 37.12%, and the distribution rate of SnO2 is 60.

    Jan 1, 2016

  • CIM
    The Development and Operation of a High-Intensity Wet Magnetic Separator Circuit for Hematite Recovery at Wabush Mines

    By M. Beech-Jones

    The increased emphasis on the efficient utilization of capital and mineral resources has led to several new advances in the science of mineral separation. One example of a recent development is the ap

    Jan 1, 1979

  • CIM
    Application of a Model-Based Predictive Controller on a Vacuum Heat-Exchange Network for the Bayer Process

    By Yannis Faitakis, Simon Bergeron

    "This paper describes the implementation of model-based predictive control (MPC) on a vacuum heat exchange network at Alcan's Jonquière Complex. The plant produces alumina from bauxite ore using the B

    Jan 1, 2003

  • CIM
    Geophysical Discoveries in the Mattagami, Quebec

    By N. R. Paterson, D. G. MacKay

    "The geology of the Mattagami mining camp, while of particular economic significance, is unfortunately obscured by a very thick mantle of overburden. For this reason geo-physical methods have been rel

    Jan 1, 1960

  • CIM
    Geology and mineralization of the Red Mountain porphyry molybdenum deposit, south-central Yukon

    By Kah Lert

    "The Red Mountain porphyry molybdenum deposit is situated in the Big Salmon Range, approximately 80 km east-northeast of Whitehorse, Yukon.Red Mountain is underlain by Paleozoic, argillaceous sediment

    Jan 1, 1995

  • CIM
    The Utilization of Copper Continuous Smelting, Converting and Fire-Refining Processes in China

    By Ling Wu

    The development of pyrometallurgical technologies has been focused on new smelting reactors, but the proposal for new converting reactors has been substantially lower. Up to today about 80% of copper

    Jan 1, 2019

  • CIM
    Surface coal mining in Elk Valley, British Columbia

    By Nichols. R. S.

    "Surface coal mining production from Elk Valley and area in southeastern British Columbia began in 1913. Since 1970, five open-pit mines have been put into production: Westar Mining's Hanner and

    Jan 1, 1984

  • CIM
    Geology of Kootenay Coal Measures in Southwestern Alberta

    By M. B. B. Research Council of Alberta Crockford

    Introduction Kootenay strata of Lower Cretaceous age contain much of the highest rank coal produced in Alberta. These strata outcrop in the foothills and mountains of southwestern Alberta and south

    Jan 1, 1949

  • CIM
    Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa Project

    By J. A. Brown, F. P. Kerr, M. A. Archer

    Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach

    Jan 1, 2020