Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Indusmin Limited Dust AbatementBy D. E. Gorse, R. G. Anderson
"Indusmin's history dates back to 1937 when they developed the Blue Mountain Nepheline Syenite deposit at Nephton, Ontario, and began supplying material for the glass, fiberglass, paint, ceramics and
Jan 1, 1980
-
Pressure Leaching of Copper-Cobalt-Zinc Containing Calcine with the Outotec Pressure Oxidation ProcessBy Mehmet Canbazoglu, Kaarlo Haavanlammi, Hannu Laitala
Cobalt is currently a critical metal because of the increasing number of electrical vehicles forecast for production. Copper and zinc are base metals that are used in many everyday applications, inclu
Jan 1, 2019
-
Minage des zones étroites à la Mine BousquetBy Paul Gauthier
Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére
Oct 1, 2001
-
Low-Temperature Geothermal Energy in Mining EnvironmentsBy R. Therrien, L. Gosselin, J. Raymond
ABSTRACT: The ground-source heat pump is a low-carbon technology that uses the earth’s renewable geothermal energy to heat and cool buildings, with an ef?ciency 3 to 4.5 times that of conventional sys
Jan 1, 2010
-
Dynamic Testing of Threadbar used for Rock ReinforcementA comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation
May 1, 2009
-
Characteristics of Coal Bumps by Microseismic Monitoring in Underground Coal Mining with Hard Roof and Coal SeamsBy Yi-xin Zhoa
The characteristics of coal bumps are analyzed based on the microseismic data from No.8935 workface in Xinzhouyao coal mine, Datong Mining Group. The geology of this workface is characterized by the t
Aug 1, 2013
-
Rapid Dewatering of Mill TailingsBy T. Yalcin
"This paper describes a process that can provide high rates of dewatering and that has the potential of bringing significant savings in tailing disposal costs. It involves a three-stage, closed-circui
Jan 1, 1987
-
Slurry Pumping PracticeBy C. A. Horne
"The transportation of mineral solids in the form of slurry is a subject most of us are associated with and, in fact, live with on a daily basis. The design parameters of slurry systems and most impor
Jan 1, 1976
-
Availability and Reliability of Siemens’ Gearless Drives (1f6ae043-857f-4a1d-a432-9fc8b3cbe926)By Todd Kennedy, Kurt Tischler
"This paper presents the field experience of Siemens with regard to Gearless Drives in the mining industry … We consider the elapsed production hours of Siemens Gearless Drives to be extensive enough
Jan 1, 2012
-
The Acid Plant Expansion and Energy Saving at Toyo Copper SmelterBy N. Kubo
Sumitomo Toyo Copper Smelter and Refinery was commenced in 1971, and its production capacity of sulfuric acid was 550tpd at the beginning. In 2001 Toyo Copper Smelter and Refinery projected to expand
Jan 1, 2007
-
History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream AreaBy K. G. Thorne, M. J. McLeod, D. Hoy
"Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col
Jan 1, 2008
-
Production of Copper Sulphate from Mine-Water PrecipitateBy A. G. Lylie
Introduction At the Britannia Mining and Smelting Company's mill, the equivalent of 2,500 to 2,800 pounds of copper sulphate crystals per day is made from copper which is precipitated from the m
Jan 1, 1951
-
Electric Furnace Off-Gas Cleaning Systems at PT IncoBy Paykan Safe
?? Background ?? WorleyParsons Gas Cleaning ?? PT Inco Smelter ?? Process Design Considerations ?? Furnace Control and Combustion ?? Combustion Chamber ?? Spray Chamber ?? Draft Control ?? Bag
May 1, 2008
-
Refractory failure in slagging gasifiersBy J. P. Bennett, K. S. Kwong
Slagging gasifiers are used to produce chemicals and/or electricity from feedstocks such as coal and/or petroleum coke. A gasifier environment includes pressures from 400 to 1000 psi, temperatures fro
Jan 1, 2004
-
Geology of the Stall Lake copper deposit Snow Lake, Manitoba (2efa5b05-37b0-4117-9900-ec4060d7eb36)By R. D. Studer
"The Snow Lake massive sulphide deposits are hosted by Aphebian volcanic rocks of the Flin Flon - Snow Lake greenstone belt, which in this area were deformed and metamorphosed to the amphibolite facie
Jan 1, 1982
-
Geomecanics Aspects of Block Cave Mine PlanningBy Enrique Rubio
Several mining operations are currently evaluating the feasibility of changing their mining method to Block Caving. There will also be several deep low-grade ore bodies that will face the need to go u
May 1, 2002
-
Recovery of Rare Metals from Spent Hydrodesulphurization CatalystBy J. Shibata, K. Manabe, A. Fuji, N. Matsunaga, D. Murakami, Yamaguchi University, T. Suzuki
"Spent hydrodesulphurization (HDS) catalyst contains rare metals such as cobalt, nickel (Ni), molybdenum (Mo), and vanadium (V). The overall objective of this project is to develop a hydrometallurgica
Jan 1, 2016
-
Improvements in SAG Mill Throughput from Finer Feed Size at the Newmont Ahafo Operation (b60080de-d277-480f-a175-8d275f54e347)By Bryon Bisiaux, Walter Valery, Sonny Mwansa, George Amonoo, Adrian Dance
"Newmont Ghana Gold Limited’s Ahafo operation have been working with Metso Process Technology & Innovation (PTI) since early 2009 to increase mill throughput from a combination of controlled blasting
Jan 1, 2012
-
Valuation of mineral properties which do not contain exploitable reservesBy Lionel C. Kilburn
"This geological engineering method is based on jour main characteristics of mineral properties, viz; location: inclusion of valuable mineralization; inclusion of geophysical and/or geochemical target
Jan 1, 1990
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975