Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    The compression-percolation test for mine tailings backfill

    By R. J. Mitchell

    "A lest apparatus has been developed for obtaining the relations among confining stress, porosity and percolation rate for hydraulic sand backfills. The apparatus can also be used to evaluate internal

    Jan 1, 1981

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    Modeling the Optimal Haul Truck Retirement Age

    By Chris Ryan

    Operational excellence along with the need for a capital management strategy demanded an educated budgetary retirement age for haulage fleets, with uniform applicability. Given fleet size and volume o

    May 1, 2010

  • CIM
    Building the Next Major Iron Ore Mine in the Labrador Trough

    Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu

    May 1, 2011

  • CIM
    Critical Wear in Ageing Infrastructure

    By Bruce Peberdy

    Outline ?Building Systems ?Climatic Effects ?Thermal Effects ?Building Components ?Building Materials ?Structural Deterioration ?Maintenance Considerations

    Nov 1, 2011

  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    Laser-Induced Breakdown Spectroscopy of Molten Matte

    By Mohamad Sabsabi, André Hamel, André Moreau, Paul Bouchard

    "Laser-Induced Breakdown Spectroscopy (LIBS) is an atomic spectroscopy technique used to measure elemental concentrations. It is well-adapted to in-situ and in-line measurements during materials proce

    Jan 1, 2016

  • CIM
    The Frood-Stobie Mine

    By H. F. Zurbrigg

    "The Frood-Stobie Mine is by far the largest metal producer in the Sudbury area. Its efficient development was made possible by the consolidation of three mining properties that covered parts of the s

    Jan 1, 1949

  • CIM
    When does a project with Questionable Viability, Warrant Further Investment?

    By David Whittle

    When does a project with questionable viability, warrant further investment? There are cases in which projects, which evaluate to a negative mean probable value, are worth investing in. There are al

    May 1, 2006

  • CIM
    A total system concept for the reclamation and hydraulic transportation of dense solids from tailings and settling ponds

    By Peter Van-De-Velde

    "The results of applying Japanese pumping technology to North American reclamation projects will be discussed.IntroductionEconomic high-density mineral reclamation and subsequent transportation of sol

    Jan 1, 1985

  • CIM
    Application of Continuous Improvement, 5S and Standard Work in an Underground Mining Environment

    By G. Molloy

    The purpose of this paper is to demonstrate the value of applying continuous improvement, in particular 5S and standard work, in an underground environment. 5S and standard work are two aspects of Lea

    Aug 1, 2013

  • CIM
    Gravity Gold Concentration at Hemlo Gold Mines Inc. Golden Giant Mine

    By Scott G. Honan, Wayne F. Luinstra

    "Since 1992, the concentration of gold using gravity methods has progressed to become an important part of production at Hemlo Gold's Golden Giant Mine. Currently, the gravity circuit accounts for app

    Jan 1, 1996

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008

  • CIM
    The Effect of Iron Removal from Raffinate on the Copper Bioleaching Process

    By A. Ghahremaninezhad, E. Jorjani, A. Riahi, Islamic Azad University, B. Nazari, H. Hani, Z. Manafi

    The presence of a high iron concentration, 9.1 g/L, in the raffinate of the Sarcheshmeh copper heap bioleach process led to the formation of various types of jarosite, (K,Na,NH4,H3O)Fe3(SO4)2(OH)6, on

    Jan 1, 2016

  • CIM
    Optimizing Plant Facilities Location

    By R. D. Hossack

    "The selection of a site for plant facilities is a function of several factors and has as its objective the maximization of profits, given fixed markets and sources of raw material locations. In pract

    Jan 1, 1970

  • CIM
    Geological engineering aspects of the conceptual design of a radioactive waste vault in hard crystalline rock

    By M. A. Mahtab, A. S. Burgess, R. G. Charlwood, P. O. Sandstrom, J. L. Ratigan

    "Addressing a current operating and environmental concern, this paper first presents an overview of the design program for an underground radioactive waste storage vault. It then reviews the construct

    Jan 1, 1980

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    IO2 - Intelligent Optimization of Industrial Operations ? A Mining Application

    By Jom Kresta

    Fundamental changes in the Bitumen Production process at Syncrude have led to the integration of Mining and Extraction operations. Successful operation of the integrated process requires the coordinat

    May 1, 2002

  • CIM
    Roadbeader excavation in consolidated rockfill at Kidd Creek Mines

    By V. C. Wittchen, T. R. Yu, J. E. Croxall

    "The consolidated rockfill at Kidd Creek Mines is a weakly cemented, minus 15 cm aggregate which posed problems for conventional drill/blast drifting methods. Consequently, lateral access to mineable

    Jan 1, 1990