Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Change in Operating Philosophy after Converting the Comminution Circuit from a Single Stage Sag Mill to a SAG/Ball Mill Circuit – The Tarkwa Experience (300ae6fa-a4d4-4788-9f6d-d7c721c2548d)By J. O. Yeboah, V. Boakye, P. A. Bepswa, M. Lombard, G. Nutor
The comminution circuit at Tarkwa Gold Mine was commissioned as a Single Stage SAG mill operated in closed circuit with hydrocyclones designed to process 4Mtpa. The circuit was later expanded by addin
Jan 1, 2012
-
Aeration in Plant PracticeBy K. V. Konigsmann
"The results of Mr. Klymowsky's research confirm the essential role played by oxidation products in the flotation of base metal sulphides. They invite a discussion on the subject of aeration which I m
Jan 1, 1973
-
Development and Improvement of Submerged Lance Converting and Refining Furnace of Fangyuan Two-Step ProcessBy Haibin Wang, Zhiwei Huang, Zhixiang Cui, Wenzhao Cui, Zhi Wang
Fangyuan Two-Step copper smelting process was commercialized in October, 2015 and has been operating for 3 years and 5 months. As the unique continuous copper smelting process with simplified flow in
Jan 1, 2019
-
The Emerald Lake concentrator design and commissioningBy Gary Hawthorn
"Laboratory testing, by Lakefield Research determined that, in spite of the relatively high pyrite content of the Golden Rose (GR) orebody, it would respond well to gravity concentration followed by e
Jan 1, 1989
-
Flotation of REE Bearing Minerals from Silicate and Carbonate Host DepositsBy T. Deng
Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga
Jan 1, 2014
-
Cyclones at East Malartic Mines Ltd.By J. W. Keyes
"The original grinding circuit at East Malartic consisted of two 8 by 8 C.A.C. mills in closed circuit with two 72 inch Akins Classifiers and an 8 by 10 secondary mill in closed circuit with two 48 in
Jan 1, 1964
-
Constitutive Model for Numerical Modelling of Highly Stressed Heterogeneous Massive Rocks at Excavation BoundariesBy M. C. Villeneuve
A numerical modelling approach was developed to explicitly simulate geomechanical characteristics of intact rock: mineralogy, grain size and fabric. The approach involved creating a representative con
May 1, 2009
-
Grindability Assessment Using Particle Size or Particle Surface AreaBy Baoquan An
The energy required to fragment a rock is proportional to the increase in the fracture surface area and hence is proportional to the rock?s surface area. In comminution, the slope of the linear relati
May 1, 2004
-
Computer modelling limitations and new directions - Part 1By Simon Houlding
"The objective of Part J of this paper is to identify the limitations of the traditional modelling methods and to illustrate, by example, the potential for error created by their application to comple
Jan 1, 1991
-
Application of a cross-pit bridge conveyor system in miningBy R. W. Zeindler, D. A. Fawcett
"A summary is presented of the report completed by the Coal Mining Research Centre in 1980. This report was of a cross-pit conveyor system applied as an auxiliary mining complement to the major stripp
Jan 1, 1981
-
An analysis of AL-60 airleg maintenance dataBy R. Frank Chiappetta, E. B. Wilson
"The maintenance records for AL-60 airlegs at Falconbridge Ltd. are used to demonstrate some of the procedures for the analysis of such data.The data are not representative of pure failure s of one ty
Jan 1, 1985
-
Operational Data and Maintenance ReliabilityBy Justin S. Johnsen
As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa
Nov 1, 2011
-
Designing for Closure And Beyond: The Perspective from Financial InstitutionsWHAT IF? ?Mine closure and reclamation liabilities were fully funded -at all times from current mine revenues ?Unexpected & catastrophic events were insured ?Remediation costs could be capped ?Ris
May 1, 2006
-
A Pilot-Scale Treatment of coal Preparation Plant Effluent by the Selective Agglomeration ProcessThe construction, commissioning and operation of a continuous pilot-scale selective agglomeration (oil agglomeration) unit are described. This plant has been used to recover fine coal from an effluent
Jan 1, 1979
-
Climate Change: Framing The Challenge; Strategic Approaches for the Mining IndustryBy Henry Stoch
It?s a green, green world ? Public concern about the impact of human activities on the environment and the roles that businesses play in that impact is rising. What?s happened in the last few months
May 1, 2008
-
Energy Conservation at Inco Metals Company: Compressed Air in Underground MiningBy J. G. Cullain
In conjunction with the over-all goals of energy conservation at Inco Metals Company, a program of improvement in compressed air utilization was established. Air flows were monitored and compared to c
Jan 1, 1979
-
The Use of Ceramic Tests in the Correlation of StrataBy A. S. Dawson
"IntroductionTHE PURPOSE of this paper is to describe the results of a preliminary investigation of a method thought to be useful in interpreting geological structures in un-metamorphosed sedimentary
Jan 1, 1952
-
Synthesis and Application Research of Nano-HydrotalcitesBy Liu Yulin, Zhao Yi, Tan Qi, Liu Lei
"Hydrotalcite is one kind of layered double hydroxides, and has special crystal chemical characteristics. Due to its good thermal stability, hydrotalcite used as the PVC heat stablier has attracted sc
Jan 1, 2016
-
Kinetics of Chalcopyrite Leaching in Novel and Exotic LixiviantsBy Isabel F. Barton, J. Brent Hiskey
Chalcopyrite (CuFeS2) is the earth’s most abundant copper ore mineral, but is refractory to leaching with sulfates, chlorides, and other common lixiviants and oxidants. This has led to increasing rese
Jan 1, 2019
-
Promises, Promises: Students, Industry and The New Labour MarketGeology grads mine heated job market Salaries up 44 per cent in three years ?[Geology student] passed up a $100,000-a-year job at a mining company last December when he finished his degree in geol
May 1, 2008