Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Noranda's Bell Allard pastefill plant: commissioning and beyond

    By Maureen McGuiness

    "The pastefill circuit at the Bell Allard Mine in Matagami, Quebec started up in August 1999. The surface pastefill plant produces a cemented paste which is sent underground by gravity through a verti

    Jan 1, 2002

  • CIM
    The choice of rockbreakers at Sherritt's Fox Mine

    By John G. Kelly

    "In 1982 an extensive study was carried out to determine the best means of size reduction for the ore to be hoisted through the borehole hoisting system at Sherritt Gordon's Fox Mine.The study ex

    Jan 1, 1986

  • CIM
    Étude des critères de fiabilité des bancs miniers : le cas de la fosse Tiriganiaq au Nunavut

    By J. Kabuya Mukendi, F. Brunet, J. Hadjigeorgiou, P. Matte, D. Leblanc, M. Grenon

    La stabilité des bancs miniers est un élément important de la conception des fosses. Il n’y a pas de consensus sur les critères à utiliser pour évaluer la fiabilité des bancs miniers. Lors de la conce

    Jan 1, 2012

  • CIM
    Locating Pre-Slide Topography Using Site Investigation Data, Case Study of the Maskun Landslide, Iran

    By V. Maazallahi, A. Rouleau, A. Saeidi

    "The geometry of the terrain topography before and after the failure are the essential factors for analyzing a landslide and for the design of remedial works. This paper presents a method to determine

    Jan 1, 2015

  • CIM
    Drilling and blasting research at the Noranda Technology Centre

    By L. van Hijfte, A. Piché

    "Drilling and blasting are fundamental operations in the mining cycle and constitute an important component of the mining costs. Problems associated with improper drilling and blasting practices can c

    Jan 1, 2000

  • CIM
    Obtaining Maximum Value from Metallurgical Projects - Avoid Throwing it Away

    By A. Eltringham

    Operations downstream of mining and beneficiation are still being subjected to increasing scrutiny as highly capitalized projects have been either slow to achieve their targets or have actually failed

    Jan 1, 2011

  • CIM
    Custom Designed Equipment

    By Michael T. McCaffrey

    The wide range of potential feed materials, process steps, and products in metallurgical facilities means that standard equipment might not be available to adequately meet the project technical and ec

    Jan 1, 2015

  • CIM
    The Assessment of Aging Shaft Linings for Potash and Salt Mines

    By S. Hopkins, J. Nolan, S. Gillis

    "Cast in place concrete shaft linings have been used in many salt and potash shafts sunk in North America over the last 100 years. A large number of these shafts have exceeded their initial design liv

    Jan 1, 2019

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    Design for Safety

    By Philip J. Bangerter, Chris Twigge-Molecey

    Design for safety is critical to metallurgical plants, due to the inherently dangerous nature of their processes. Two significant areas of concern are: 1. preventing catastrophic process failures that

    Jan 1, 2015

  • CIM
    Hydrometallurgical Processing of Telfer Concentrates: Accepting and Winning the Challenge

    By D. Lunt

    Telfer bulk concentrates typically contain 8% chalcopyrite, 8% chalcocite, 45% pyrite and 80-120 g/t gold. Although very high copper and gold recoveries can be obtained by subjecting the concentrate t

    Jan 1, 2004

  • CIM
    Retrofit to Agrium’s Special Standard Surge Bin Improves Reliability, Safety, & Life Cycle Cost

    By T. Holmes, S. Davison

    "The Special Standard Surge bin at Agrium’s Vanscoy Potash Operations (VPO) has been plagued with flow problems and wear, and corrosion issues for it’s entire working life. Investigation showed that t

    Jan 1, 2016

  • CIM
    Horizon control technology for selective mining in underground coal mines

    By I. R. Muirhead, A. L. Craven

    The trend in mining thermal coal is only to mine coal with the lowest sulphur content. In many coal seams, bands of coal with high sulphur content are often present, generally occurring either at the

    Jan 1, 2000

  • CIM
    Packing in SAG Mill Shell Liners ? Issues and Controls

    By D. Royston

    In SAG mills fed with a variety of ore types, hard packing between the shell lifters can come and go depending on rock type and rock size distribution and the presence of a binder. Packing can appear

    Jan 1, 2012

  • CIM
    The Holy Grail - Predicting Localized Corrosion Damage from First Principles

    By D. D. Macdonald, G. Engelhardt

    The accumulation of damage due to localized corrosion [pitting, stress corrosion cracking (SCC), corrosion fatigue (CF), crevice corrosion (CC), and erosion-corrosion (EC)] in complex industrial syste

    Jan 1, 2005

  • CIM
    Portland Cement in Canada

    By W. A. Toohey

    Introduction From the earliest times it has been an inherent trait of man to build or create something for his own use or convenience. The need of some form of shelter other than that of the caves

    Jan 1, 1927

  • CIM
    Dynamic Simulations for Off-Gas Systems Design

    By D. Berkley

    Off-gas systems often become the limiting factor in production increase and environmental projects. Any upgrade or new off-gas project needs to address control instability issues, instabilities that c

    Jan 1, 2005

  • CIM
    WMCR - Kalgoorlie Nickel Smelter Operations Overview 1972 - 2005

    By J. Malone, D. Loth, J. Palmer

    WMC Resources' Kalgoorlie Nickel Smelter was commissioned in 1972 at a design capacity of 30,000 tpa of contained Nickel in matte. A series of upgrades and progressive improvements have resulted

    Jan 1, 2005

  • CIM
    The West Bay Fault, Yellowknife

    By Neil Campbell

    Abstract Following discovery on the Giant property of very promising gold deposits, some of which terminate against the steeply-dipping West Bay fault, a geological study was initiated co locate po

    Jan 1, 1947

  • CIM
    Process Engineering Of Flotation Circuits No.34

    By R.P. Edwards, B.C. Flintoff

    Froth flotation is one of the most widely used and effective processes for mineral benefication. First introduced in 1911, flotation technology has seen many developments over the past 80-plus years.

    Jan 1, 1995