Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Virtual Modeling in Tube Hydroforming Process of Complex Aluminium Parts

    By Mihaita Matei

    An adaptive approach to control the deformation in tube hydroforming process is presented. This requires: the use of an existing non-linear FE software (ABAQUS) that incorporates a user material model

    Jan 1, 2011

  • CIM
    Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling Equipment

    By M. J. Marinigh

    Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re

    Jan 1, 2007

  • CIM
    Integration and enhancement of mine operations and maintenance — A structured analysis approach

    By P. Roman, L. Daneshmend

    "During the last decade, mining companies have been overwhelmed by technological solutions to perceived problems. This is particularly true with information technology where rapid advances have result

    Jan 1, 2001

  • CIM
    Ore Pre-Concentration by Bulk Sorting Using Real Time Elemental Analysis

    "Conveyed coal flows have been diverted on the basis of real time ash analysis since the 1980s. Many coarse particle separation methods are available through screens, jigs, heavy media separation, par

    Jan 1, 2018

  • CIM
    Underground continuous mining — An overview

    By David Forrester

    "At the 95th CIM Annual General Meeting in Calgary, 1993, a paper entitled “Progress on Futuristic Mining Technologies” was presented(Matthews and Sarin), in which they outlined the goal of continuous

    Jan 1, 1996

  • CIM
    Alkyl Arsines And U

    By J. Gogal

    Cameco's Cigar Lake Operation (CLO) started commercial uranium ore production in 2015. Initial mining was focused in areas of the ore body with relatively low concentrations of elements of concern (EO

    Jan 1, 2020

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Diesel engines: mechanical considerations for equipment selection and operation

    By D. G. Champion

    "A comparison of diesel engine power ratings with in-service capability, and the selection of unit size and total number of units are discussed in the paper. Engine specific fuel consumption and its e

    Jan 1, 1986

  • CIM
    Gravity Gold Concentration at Newmont Mining

    The process of gold recovery by gravity concentration is incorporated in the metal recovery flowsheet at seven Newmont Mining Corporation owned mining operations in Australia, North America and Africa

    Jan 1, 2011

  • CIM
    West Bay Fault

    By N. Campbell

    "The fault under consideration follows a northerly trend past the west; side of the original settlement of Yell ow knife; which is situated 600 miles; north of Edmonton and 400 miles from the Northern

    Jan 1, 1954

  • CIM
    Integrating mining and mineral processing for advanced mining systems

    The integration of mining and mineral processing technologies into new advanced mining systems is considered to offer several benefits, including selective mining, reduction in waste, increased produc

    Jan 1, 2002

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • CIM
    A Rheometallurgical Approach to Liquid-Solid Separation

    By M. Girard, E. Bourricaudy, M. Ashbury, M. Canizares, A. Mezei

    Liquid-solid separation and slurry handleability relate directly to commercial plant ramp-up success or lack thereof. The paper provides a well-proven approach for testing, scale-up and commercial app

    Jan 1, 2011

  • CIM
    Zero-Process-Ignorance in the Comminution Circuits, Why Not?

    By A. Bouajila1

    Minerals processing organisations will be more and more under intense competitive pressure. Major changes are being experienced with intense respect to resources, processes, production strategies and

    May 1, 2001

  • CIM
    Chemical Modeling in Pressure Hydrometallurgy Using OLI

    By A. Anderko, V. G. Papangelakis, G. Moldoveanu, G. Azimi, M. Carlos

    "OLI Analyzer is a software package that uses the powerful Mixed Solvent Electrolyte (MSE) model to simulate the behavior of multicomponent electrolyte solutions from infinite dilution to the limit of

    Jan 1, 2012

  • CIM
    Investigation of one-pass grouted support systems for use in a high stress mining environment

    By John Galbraith, Dwayne D. Tannant, Chris C. Langille

    "Development of underground openings in a deep mining environment requires a support system that is able to absorb energy as a result of dynamic loading due to rockbursting and blasting and static loa

    Jan 1, 1996

  • CIM
    Coal Research and Development in• Canada -1968

    "Accelerated expansion of Western Canada's metallurgical coal industry has again stimulated considerable exploration activity in the Rocky Mountain Foothills Belt and influenced much of the R&D relate

    Jan 1, 1969

  • CIM
    Effects of La Addition on the Microstructure and Mechanical Properties of Sn-58bi Solders Joints with OSP Pads

    By T. H. Chuang, Y. Y. Shiue

    "Rapid whisker growth was significantly alleviated in a Sn-58Bi alloy doped with 0.5 wt.% La. Experimental results showed that many thin, plate-form intermetallic phases appeared in the solder matrix.

    Jan 1, 2012

  • CIM
    Nuclear Fuel Resources and Price Trends

    By D. D. Bell

    This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr

    Jan 1, 1967

  • CIM
    Performance of On-Stream Analyzers At Outokumpu Concentrators, Finland

    By Tapio Leskinen, Jouko Koskinen, Timo Nlltti, Lappalainen Seppo, Pentti Vanninen

    "The Courier 300 on-stream analysis system manufactured by Outokumpu has now been in operation at five of the company's concentration plants long enough to give a reliable basis for closer examination

    Jan 1, 1973