Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    CIM Leading Practice Guidelines for Mineral Processing

    By CIM Mineral Resource, Mineral Reserve Committee

    These Leading Practice Guidelines for Mineral Processing (LPGMP) were prepared by the Sub-Committee on Leading Practice Guidelines for Mineral Processing. The Sub-Committee reports to the Executive Co

    Nov 25, 2022

  • CIM
    Reliability of diesel powered load-haul-dump machines in an underground Quebec mine

    By J. F. Perreault, J. Paraszczak

    "The profitability of an underground mine depends to a great extent on the production cost.Random equipment failures and their consequences have significant influence on the total operating cost of a

    Jan 1, 1994

  • CIM
    Reporting Standards for Mineral Resources and Mineral Reserves Introduction

    By Greg Gosson

    "Early efforts to develop formal reporting systems to quantify and classify mineral deposits date back over 100 years. (e.g. Hoover 1909: “Proved, Probable, Prospective Ore”). This was at first driven

    Jan 1, 2003

  • CIM
    Maintenance improvements through the introduction of reliability concepts

    By Leslie McHattie, Sadek E. EI-Alfy

    "The Maintenance Engineering Department at Carol Mining and Concentrating is currently in the process of introducing reliability concepts such as failure analysis, rework elimination, predictive maint

    Jan 1, 1992

  • CIM
    Application of conveyor belt monitoring technology to conveyor belt reliability

    By J. L. Barton, R. A. Murray

    "This paper looks at how Syncrude Canada Ltd. is utilizing the Conveyor Belt Monitoring technology developed and patented by the Australian CSIRO and licensed to Syncrude by Conveyor Belt Monitoring o

    Jan 1, 1992

  • CIM
    Renewable Power at Remote Mining Sites

    By Michel Carreau

    Presentation topic Introduction to Renewable Power in Remote Mining Industry Trend What are the Challenges and How to address them Acceptability (Management Buy-in) ? RP not core business to mi

    May 1, 2013

  • CIM
    Monitoring Wear and Corrosion With Integrated Ultrasonic Transducers

    By Silvio E. Kruger

    Real time measurement of wear and corrosion provides crucial information needed to determine an optimal schedule for corrective maintenance and is a powerful tool to maximise equipment availability an

    Aug 1, 2013

  • CIM
    Maintaining the reliability of a plant electrical system

    By A. P. Williams

    "This paper presents an overview of plant electrical systems in general, a discussion of the problems that may occur due to plant growth, the maintenance required to maintain the reliability and safet

    Jan 1, 1987

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    Protective instrumentation for large grinding mill trunnion bearings

    By R. L. Guerguerian, Eugene Bercel

    "Grinding mill hydrostatic trunnion bearings require an external pumping source to provide and maintain the oil film between the bearing members. In order to guarantee a predetermined minimum film thi

    Jan 1, 1981

  • CIM
    Energy Efficiency in Comminution – Getting More from the Crushing Stage

    By A. Christoffersson, T. Nillson-Wullf, H. R. Manouchehri

    "Mining industry has been the building blocks for human development through millennia and will continue to play its role in sustainability and meeting society’s needs for raw material. In the way towa

    Jan 1, 2016

  • CIM
    Simulation models for mineral processing plants

    By J. W. Merks

    "Simulation is the process of designing a computerized model, of a system or procedure, for the purpose of understanding its behaviour and developing strategies to control its operation. Simulation mo

    Jan 1, 1991

  • CIM
    Environmental design considerations for belt conveyors

    By M. Bender, H. D. Goodfellow

    "Belt conveyors, because of their low capital and operating costs and inherent flexibility in handling a wide variety of products, have numerous applications in the mining industry. With the increased

    Jan 1, 1982

  • CIM
    An Overview of Southern African PGM Smelting

    By R. T. Jones

    The largest known platinum group metal (PGM) deposit in the world is the Bushveld Complex in South Africa, with the Great Dyke in Zimbabwe also being one of the biggest. It is therefore not surprising

    Jan 1, 2005

  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • CIM
    Tailings disposal

    By P. C. Lighthall, D. W. Zandee, W. Shukin

    "IntroductionThis chapter deals with the on land disposal and storage of fine tailing in slurry form behind dams. Other types of tailing, such as coarse dry cobbs from magnetic separation of iron ores

    Jan 1, 1989

  • CIM
    Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )

    By Earle J. Klohn

    "The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr

    Jan 1, 1972

  • CIM
    Diesel-generating plant waste heat recovery systems at remote locations

    By D. Kovachevich, M. A. Pfeifer

    "A t remote locations typical of mines and associated ore processing plants, diesel electric generators are ideally suited for power plants due to their inherent operating flexibility, efficiency and

    Jan 1, 1984

  • CIM
    Classification of ore reserves based on geostatistical and economic parameters

    By H. H. Wober, P. J. Morgan

    "The proposed classification of ore reserves based on geostatistical and economic parameters is designed to be used as a communication tool to identify for investors, bankers, and financial analysts t

    Jan 1, 1993

  • CIM
    Toward the Optimization of Flotation Column Operation (9284e55e-ecc3-4510-af19-44c99925dde0)

    By J. Bouchard, A. Desbiens, M. Maldonado, R. del Villar

    ABSTRACT: Despite many years of practical applications in mineral processing plants, the potential of column flotation has still not been fully exploited. The challenge in measuring some key variables

    Jan 1, 2011