Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Forum on the Non-Cataracting Ball MillBy L. E. Djingheuzian
ANON-CATARACTING (N-C) ball mill is so operated that the balls are not thrown in-ward at the top of their paths. The result is to maintain, in the mill, a quiescent pool in which classification will o
Jan 1, 1958
-
The origins of zinc and brassBy J. E. Dutrizac, J. B. O'Reilly
"Zinc is a relatively abundant element which occurs as both high-grade sulphide ores {sphalerite ZnS) and oxide ores which the ancients collectively termed ""calamine"" (smithsonite ZnC03 and/ or hemi
Jan 1, 1999
-
A Large Pillar Blast at the Sullivan MineBy R. M. Porter
PILLAR extraction at the Sullivan Mine bas been in progress for over twenty-five years and bas .involved progressively larger pillars. The largest pillar blasted to date exceeds one million tons and i
Jan 1, 1961
-
Real-Time Data Reconciliation for Process ControlBy Éric Poulin, Simon Gariépy, Mario Paredes Malca
"While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread
Jan 1, 2006
-
Drilling hard siliceous sandstone strata effectivelyBy Joseph J. Larry
In hard siliceous sandstone strata overlying coal seams, roof bolting is often the bottleneck in the coal production cycle. In the past, these strata have been drilled by pneumatically operated stoper
Jan 1, 1979
-
Dry Beneficiation of Fine Coal in a Continuous Vibrated Gas-Fluidized Bed SeparatorBy Y. M. Zhao, C. L. Duan, Z. F. Luo, X. L. Yang
"Fine coal beneficiation in a dry way is considerably imperative for the efficient utilization and conservation of coal resource in drought regions, especially for China. In this study, a continuous v
Jan 1, 2016
-
Uncertainty in the Rock Engineering Design of Post-Tensioned Anchors for DamsBy B. Panton, J. Carvalho, E. T. Brown
High-capacity, post-tensioned anchors have found wide-spread use in initial dam design and construction, and in the strengthening and rehabilitation of concrete dams to meet modern design and safety s
Jan 1, 2015
-
Past And Future Cycles Of Copper: Regional And GlobalBy M. D. Gerst
The degree to which copper will continue to be in an integral part of the world economy in the future will depend largely on the dynamics of global economic development, the primary and secondary copp
Jan 1, 2007
-
Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern Quebec (1bfb6279-27f7-4a75-8482-2fe66a75eac0)By Alain Simard, André Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst
"The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old
Jan 1, 1990
-
Relationship between mineral deposits and geologic domains of the Abitibi Volcano-Plutonic Belt of Northwestern QuebecBy Alain Simard, Andre Gobeil, Sylvain Lacroix, Maurice Rive, Denis Racicot, Pierre Verpaelst
"The Abitibi volcano-plutonic belt forms the major portion of the Abitibi lithotectonic subprovince in the Superior Province. The Abitibi belt is composed essentially of"" (1) approximately 2.7 Ga old
Jan 1, 1989
-
Geomechancial Reservoir Models for Tectonic Stress Prediction – Workflow and Case StudiesBy A. Henk, C. M. Aruffo, K. Fischer
"Geomechanical reservoir modeling offers a valuable tool to predict tectonic stresses, in particular the local perturbations in orientation and/or magnitude which occur at lithological boundaries and
Jan 1, 2015
-
Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal OperationsBy Dominic Fragomeni, Tony DiFeo, Martyn P. Hay
"As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E
Jan 1, 2006
-
Cabot Corp. - Tantalum Mining Corporation of Canada Ltd.By William Ferguson, Claude Deveau, Wade Hazel, Stephen R. Young, Allen Lussier, Robert Copeland
"LocationSometimes known as the Bernie Lake mine, the mine is located about 180 km east-northeast of Winnipeg on the northwestern shore of Bernie Lake, close to the Nopiming Provincial Park and the Ma
Jan 1, 2000
-
Application of Coal to Sewage TreatmentBy Peter Silveston, Earl Shannon
Process-oriented experiments on the use of coal as an adsorbent for certain soluble components of sewage are described. The capacity of Canadian coals for these components was less than 0.1 per cent b
Jan 1, 1970
-
Monitoring and targeting of plant utilities at INCO Limited, Sudbury, Garson MineBy D. Pacey
"This paper reviews the installation, start-up, and operation of a comprehensive monitoring and targeting management technique in which all plant utilities (i.e., electricity, natural gas, compressed
Jan 1, 1997
-
Effect of Process Conditions on Froth Stability in an Industrial Copper Flotation CircuitBy G. Bartolacci
In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collecti
Jan 1, 2007
-
Noise and Vibration: Mine Workers’ Exposure in Quebec Underground Mines (bf19411f-d782-4aed-bfa6-78838c9cf781)By P. Marcotte, G. LeBlanc, S. Ouellette, J. Boutin
"To characterize noise and vibration sources of different types of mining equipment used in underground mining, the authors performed a study in eight Quebec mines on 28 pieces of equipment. This pape
Jan 1, 2015
-
World Class Remote Control SystemsBy Joseph Sawicz
By now, the concept of remotely controlling heavy equipment in underground mines has become commonplace. Personnel safety is the biggest justifier for remote control, followed by an inherent cost savi
Apr 1, 2005
-
Evaluation of a New Milling Process for the Caetité-Brazil Uranium Ore (faa813fd-29e4-40ec-8ac0-af3cb283b910)By H. M. Lima, L. A. Gomiero, C. A. de Morais
ABSTRACT The Caetité-Brazil uranium facility produces approximately 400 tonnes U3O8 per year from an ore averaging 0.29% U3O8. The process steps are ore crushing, heap leaching with sulphuric acid, ur
Jan 1, 2012
-
Modelling Detritals and Ancient Landslides Using Geochemical Signatures for Improvements to Slope Design – A Case StudyThis paper presents a case study where Cenozoic age detritals and an ancient buried landslide have been modelled in the final walls of an iron ore pit. Orebody 25 is located in Western Australia’s Pil
Jan 1, 2015