Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Air Granulation of Copper Slags for Iron Silicate Production Part 2: Drawing Parallels from Air Granulation of PGM Converter Slag

    By M. Mahdi, L. So, A. MacMillan, D. Metcalfe, J. Woloshyn, D. Sauter, N. Uys, JP. Janse van Rensburg

    For city smelters, with limited real estate, efficient slag cleaning furnaces followed by water granulation to produce an iron silicate product is the preferred process approach. Water granulation, ho

    Jan 1, 2019

  • CIM
    Underground Belt Conveyor System at the Sullivan Mine

    By F. M. Waldie

    THE 2,538-foot belt conveyor recently installed underground at the Sullivan mine hoists ore from the 3,350-foot level to the 3,900-foot or main haulage level, a vertical distance of 680 feet. The des

    Jan 1, 1945

  • CIM
    Genesis of Canadian Massive Sulphides Reconsidered by Comparison to Cyprus Deposits

    By R W. Hutchinson

    Cupreous pyrite deposits in Cyprus have many geologic similarities to Canadian massive sulphide copper-zinc ores as well as certain significant differences. A comparison of the Cyprus and Canadian dep

    Jan 1, 1965

  • CIM
    Geothermal Research in Canada

    By Alan Jessop

    A small group has been set up at the Dominion Observatory, Ottawa, to make a survey of terrestrial heat flow throughout Canada. Terrestrial heat flow is the heat rising from the interior of the earth

    Jan 1, 1964

  • CIM
    Monitoring of Dynamic Bolts for High Stress Mining

    By F. Charette

    The paper reviews the requirements of the instrumentation required to monitor mining excavations in a high stress environment, and the development plan to instrument the D-Bolt in such a fashion as to

    Jun 1, 2012

  • CIM
    Autonomous Tramming System for Open Pit Drilling Platforms

    By V. Polotski

    This paper describes a platform for autonomous operations in open pit mining environments. A typical operation consists of: (1) Initial locomotion toward a remote worksite; (2) Pattern navigation with

    May 1, 2003

  • CIM
    Sinking No. 5 Winze at Wright-Hargreaves Mine

    By W. T. Sampson

    Introduction The Kirkland Lake (Ontario) property of Wright-Hargreaves Mines, Limited, - consists of four claims. The two main shear zones or 'breaks' of the Kirkland Lake camp extend thr

    Jan 1, 1948

  • CIM
    New Formulations for Reverse Flotation of Phosphate from Sedimentary Ores

    By A. Klingberg, M. Svensson, N. Smolko Schwarzmayr

    "Removal of silicates and carbonates from sedimentary phosphate ores by the use of new synthetic collector/formulations was investigated in a comparative study with traditionally used collector system

    Jan 1, 2016

  • CIM
    Shaft Sinking at Rouyn Merger Gold Mine

    By L. J. Cunningham

    Introduction The property of Rouyn Merger Gold Mines, Limited, is in Rouyn and Joannès townships, Western Quebec, seven miles east of the town of Rouyn. Traversing it is the east-west trending Cadi

    Jan 1, 1948

  • CIM
    In-Situ Leaching of Gold Deposits

    In-Situ Leaching (ISL) process plants are low cost producers for uranium deposits where the geology is suitable. In the 1970s, a three-year pilot ISL program occurred on gold ore from the Ajax Mine, C

    Jan 1, 2011

  • CIM
    The Dentonia Flotation Mill

    By W. Holdsworth

    The flotation mill of Dentonia Mines, Limited, at Greenwood, B.C., went into operation on April 20th, 1934, and by October 11th a total of 15,000 tons of ore had been treated. It is intended in this p

    Jan 1, 1935

  • CIM
    Western Canada’s Oil and Gas

    By Carl O. Nickle

    "IntroductionIF I WERE ASKED what are the two most important single factors in shaping the growth of Canada to date, and in building its future, the answer would be: first, the treasure house of natur

    Jan 1, 1952

  • CIM
    Progress in Mechanical Loading

    By R. S. Bigelow

    Part 1.- Metal Mines Early experiments with mechanical loaders in metal mines were confined largely to machines of the shovelling type and generally air-operated. Although the first application of t

    Jan 1, 1931

  • CIM
    Low-Grade Iron Ore for High-Quality Steel: India's Kudremukh Iron Ore Project

    By L. E. Fischer

    The background for the 630-million-dollar-plus iron ore project at Kudremukh is outlined. The system and plants for mining, crushing, concentrating, transporting via a slurry pipeline, filtering and s

    Jan 1, 1979

  • CIM
    Uranium Exploration in the United States

    By Phillip I. Merritt

    "IntroductionDuring and since• the war, it has been my privilege to work closely with those in Canada who are responsible for the vital raw materials needed in our co-operative atomic energy programme

    Jan 1, 1950

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    An Innovative Approach to Shaft Sinking Stage (Galloway) Design

    By J. Holder

    "A key barrier to vertical mineshaft construction is the construction access required for workers. A suspended work stage is used to provide this access for the mechanical, electrical and structural a

    Jan 1, 2019

  • CIM
    Pyrolysis of Chrysotile Asbestos Fibre

    By H. M. Woodrooffe

    IT IS WELL KNOWN that chrysotile asbestos from various occurrences exhibits varied physical properties and certain differences in chemical corn position, both of which conditions may have an important

    Jan 1, 1956

  • CIM
    Review of the Principles of Flow of Bulk Solids

    By J. R. Johanson, A. W. Jenike

    "A solid flows out of a bin provided that the outlet is sufficiently large so that stable obstructions to flow do not develop. The geometry and surface finish of a bin and the construction of the feed

    Jan 1, 1970

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981