Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Filtration in the Mining Industry

    By W. C. Ferguson

    "This paper could be more appropriately titled ""The Application of Vacuum Filters to Underground Minewater Treatment. in a previous paper co-authored by the writer (1) the history and development of

    Jan 1, 1971

  • CIM
    A numerical description of the formation of a crater in rock blasting

    A newly developed damage model was used in the study of rock fragmentation mechanisms involved in crater blasting. Simulations show that at the detonation of the explosive charge, a crushed zone aroun

    Jan 1, 1998

  • CIM
    Application of a modified Plastofrost apparatus to coal rheology

    By P. D. Duever, P. J. Readyhough, P. L. Silveston

    "The Plastojrost apparatus, developed by Ritter and Juranek in the 1960s has been modified primarily, to automatic temperature control. A limited investigation of carboniferous and cretaceous coal sam

    Jan 1, 1987

  • CIM
    Technology at the forefront of percussive rock-drilling operations

    By Lar Liljeblad

    "As demands upon the earth's natural resources continue to grow, exploration companies, mining organizations and others face the problem of the need to tackle increasingly more difficult strata t

    Jan 1, 1991

  • CIM
    A Review and Update of the Grinding Circuit Performance at the Los Pelambres Concentrator, Chile

    By Gonzalo Bernstein, David G. Meadows, German Naranjo, Edgardo Tapia

    "During the last decade Antofagasta Minerals’ Los Pelambres Mine has dramatically increased its ore throughput following the fast initial phase ramp up through a series of planned incremental expansio

    Jan 1, 2012

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    On-Site Daily Mineralogy - SIDMIN Program

    By Fuzail Siddiqui

    "The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch

    Jan 1, 2000

  • CIM
    Underground Cable Fault Location Under Methane and Coal Dust Explosion Hazard Conditions

    By A. Kozlowski

    We present research on cable fault location methods for mines where coal dust and methane explosions are a frequent potential hazard. The methodology and devices for low- and medium voltage cables fau

    Aug 1, 2013

  • CIM
    The Noranda Process after six years of operation

    By A. G. Storey, J. B. W. Bailey

    "The Noranda Process at the Horne Division ofNoranda Mines Limited now smelts approximately 350,000 short dry tons of concentrate a year, which is 40% of the total smelter throughput. Campaigns are av

    Jan 1, 1980

  • CIM
    Rare Earth and Thorium Recovery in Canada

    By John R. Goode

    "The year 2011 witnessed a major surge in rare earth prices as China, supplier of +95% of the world’s rare earths, reduced export quotas and increased export taxes and duties. In response, companies a

    Jan 1, 2012

  • CIM
    The clay products industries of Ontario (5957d9bc-4126-437f-966b-b9a7c64fbbca)

    By G. R. Guillet

    "Bricks made from local Paleozoic shales, and floor and wall tiles made from imported clays, both established record production volumes in 1985 and are the strongest segments of Ontario 's clay p

    Jan 1, 1988

  • CIM
    Effect of CaO and Al2O3 on the Liquidus Lines of the CU2O-Fe2O3-SiO2 System in Equilibrium with Metallic Copper

    By H. Henao, E. Kohnenkamp, L. Rojas

    The slags generated in the copper conversion process are mainly composed of Cu2O-Fe2O3-SiO2 with the compounds CaO and Al2O3 in concentrations up to 10 wt%. The present work contributes to the knowled

    Jan 1, 2019

  • CIM
    Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper Ore

    By F. M. Makarinsky

    "SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced

    Jan 1, 1975

  • CIM
    Stochastic Approach to the Corrosion Assessment of Rock Bolts

    By Francois Charette

    Corrosion is a significant factor affecting the capacity and working life of ground support. The paper explores a relatively simple method to predict the load capacity of a support system using a Mont

    Jun 1, 2012

  • CIM
    National Strategy Overcoming HR Challenges in the Canadian Mining Industry

    Session 1 ? Intro to MiHR ? Business Case for Aboriginal Inclusion ? Overview of the Mining HR Guide for Aboriginal Communities ? Two presentations of Programs featured in the Guide ?? The RAP Pr

    May 1, 2009

  • CIM
    Nuevaunión - Applying Capital and Infrastructure Synergies to Support Development of the Relincho and La Fortuna Deposits

    By C. Velásquez, W. Bergholz, C. Spence, P. Lind

    NuevaUnión SpA (NuevaUnión) is a development project located in the Huasco province of the Atacama region of Chile. It is held in a joint venture company owned 50:50 by Teck Resources Limited (Teck) a

    Jan 1, 2019

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Permeability and Storativity of low Permeable Rock under the Supercritical CO2 Injection using Flow Pump Method

    By Y. Mitani, H. Ikemi, K. Kitamura, H. Honda

    "Instead of carbon capture and geological storage (CCS) that does not rely on structural aquifers, injecting carbon dioxide into sedimentary rock deep underground has been considered. For advection ve

    Jan 1, 2015