Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
CMIC-NSERC Footprints Project: A Roadmap for Large Project Development and ImplementationBy Alan Galley
CMIC Mandate CIM Annual Meeting, Toronto, May 6, 2013 To increase mining research, innovation and commercialization efforts in order to strengthen Canada?s pre-eminent role as a global leader in min
May 1, 2013
-
Towards Formalizing Qualitative Operations Input Data into Mine PlanningBy E. Lampard
Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu
May 1, 2011
-
Constitutive Model for Numerical Modelling of Highly Stressed Heterogeneous Massive Rocks at Excavation BoundariesBy M. C. Villeneuve
A numerical modelling approach was developed to explicitly simulate geomechanical characteristics of intact rock: mineralogy, grain size and fabric. The approach involved creating a representative con
May 1, 2009
-
The New Britiannia Project a TVX Gold Inc. /High Rlver Gold Mines Ltd. Joint VentureBy Roy Lindsay, Paul O'Hara, Gary Halverson
"The New Britannia Minesite is located in Snow Lake, Manitoba, 420 miles north of Winnipeg (figure 1). The mine previously operated from 1949 to 1958 extracting some 5.39 million tons of ore at a 0.15
Jan 1, 1996
-
The Installation and Operation of Heap Leaching Test FacilitiesBy J. Maheu
Heap leaching is an old technique for the recovery of copper, but a fairly new technique for the recovery of gold.The paper outlines the equipment required for the establishment of heap leaching test
Jan 1, 1982
-
Semi-Autogenous Grinding Circuit Reduces Capital CostsBy H. C. Counsell, R. Webber
"The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,
Jan 1, 1984
-
Starting Koala North ? North America?s First Underground Diamond MineBy Paul Harvey
Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year
May 1, 2003
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultrafine Sulphide ConcentrateBy G. Deschênes
The Eleonore property (James Bay district of Northern Québec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi
Jan 1, 2013
-
Lead Circuit Flotation at the Red Dog MineBy M. J. Fairweather, Keith Lee, Naseem Mian
"The initial metallurgical response of the lead flotation circuit at Cominco Alaska's Red Dog Mine was substantially below feasibility expectations. A program of diagnostic mineralogical analysis poin
Jan 1, 1997
-
Treatment of Carnallite Potash Ores by Selective FlocculationBy Samantha Beeson, Collin Poole
"This paper examines the development of two new selective flocculation techniques for recovering KCI values from low grade carnallite potash ore.Direct recovery of KCI was achieved using one of two mi
Jan 1, 1997
-
Optimising Stope Sequences for Long Term Mine PlanningBy André van Wageningen
Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos
May 1, 2004
-
Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003
-
Ore Handling for the McArthur River and Cigar Lake ProjectsBy Chuck Edwards
"The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec
Jan 1, 1997
-
Paste Production Storage Mechanism (PPSM), a Major Advance in Solids Concentration TechnologyBy Rudy Tenbergen, Dick Farmery, Jim Naylor
"Paste backfill has replaced cemented rock fill as one of the components to improve ground · control and mine safety at the Macassa Operation of Kinross Gold Corporation in Kirkland Lake, Ontario. It
Jan 1, 1997
-
Molybdenum Extraction from Uranium Rich Strip SolutionBy Charles "Chick" Rodgers
"The Key Lake uranium mine is the largest single uranium producer in the world. It is owned 2/3 by Cameco Corporation and 1/3 by Uranerz Exploration and Mining. Cameco is the operator. Current product
Jan 1, 1996
-
Using airborne magnetic and electromagnetic data to monitor mine tailings in Copper Cliff, northern OntarioBy J. Shang, P. Howarth, B. Morris
Tailings from the nickel refinery in Copper Cliff, Ontario, consist of fine silicates mixed with a variable amount of conductive and magnetic minerals mainly associated with sulphides and iron oxides.
Jan 1, 2001
-
Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and ControlsBy E. T. C. Spooner, Ioannou S. E.
"Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi
Jan 1, 2000
-
Stochastic Simulation of Open Pit Pushbacks with a Production SimulatorMaterial scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti
May 1, 2004
-
THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.By Pierre Gaucher
It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob
Oct 1, 2001