The Use of a Novel Chemistry Significantly Enhances the Strip Rate of both Gold and Silver from Carbon in Strip CircuitsBy E. J. Fuller, J. C. Monette
"Gold and silver cyanide complexes are presently desorbed from activated carbon by means of hot caustic elutions. These solutions may or may not contain additional sodium cyanide. There are several pa
Jan 1, 1992
-
Expansion of Uranium Milling at Denison Mines LimitedBy E. LaRocque
"Long term contracts requiring delivery of 6,000,000 pounds of U308 per year to its customers have made it necessary for Denison Mines to expand its milling capacity from 7,100 tons per day to 15,000
Jan 1, 1982
-
A Two-Phase Backfill Approach to Dilution Control at the Doyon MineBy Emilie S. Williams
The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping
Oct 1, 2004
-
Investigation on Efficiency and Wear with the LCM Centrifugal MillBy Peter Mitschke, Friedrich Rosenstock, Heinrich Meiler
"The development of the Centrifugal Mill jointly by Chamber of Mines (Johannesburg) and LURGI GMBH (Frankfurt) had been described by L. Kitschen e.al. during the 14th IMPC at Toronto in October 1982.
Jan 1, 1985
-
Deep shaft hoisting at LaRonde —The Penna shaft hoisting plantBy B. McLaughlin
Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl
Jan 1, 2004
-
Laboratory and in situ investigations of tracking cutters for computer-aided design of shearer drumsBy B. Tiryaki, M. Ayhan, O. Z. Hekimoglu
"This paper discusses the aspects of tracking cutters related to the computer-aided design of shearer drums. A comprehensive computer analysis of drum dynamic parameters for multi-tracking tool arrang
Jan 1, 2003
-
Characterization of Reference Gold CatalystsBy Susumu Tsubota
Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by
Oct 1, 2003
-
Some Crushing and Grinding Considerations in Plant DesignBy H. A. Steane
"This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i
Jan 1, 1976
-
Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De ContrôleBy Michel Aubertin
Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè
Nov 1, 2002
-
Regulation and the Regulatory Process in the Mineral IndustryBy F. C. Lendrum
"This paper had its origin in a panel discussion organized by the Canadian Uranium Producers Metallurgical Committee (CUPMC) at their Annual Meeting in Blind River in May, 1964. The reason for the pan
Jan 1, 1986
-
Genetic Aspects & Classification of Important Canadian Uranium DepositsBy R. H. McMillan
A classification of important uranium deposits which utilizes both genetic and descriptive criteria is presented. The dual aspect is useful because, while the non-genetic nomenclature for the differen
Jan 1, 1978
-
State of Mining Environmental ManagementMining Subscribes to Murphy?s Law Personal observations on the past ?Perfect, benign deposit mines can be screwed up-spills and concentrate handling issues ?Long term contamination and water manag
May 1, 2010
-
Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)By C. S. Maggs, L. Shwydiuk, H. W. Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
Jan 1, 2003
-
Electromagnetic testing of wire ropes — New developmentsBy K. Leung, J. E. Udd, L. B. Geller, F. Kitzinger
"Sixteen miners died tragically at the Paymaster gold mine in Timmins, Ontario, in February 1945 when a badly corroded hoist rope broke. The investigation of the Royal Commission that followed arrived
Jan 1, 2003
-
Stochastic evaluation of sampling errors in mineral processing streamsBy C. Ketata, M. C. Rockwell
During the operation of a mineral processing plant, the unit processes are investigated by analyzing the data extracted by means of stream sampling. The data structure is identical to the time series
Jan 1, 2001
-
Total systems approach to design for underground mine-mill integrationBy M. Morin
"This paper examines the design issues associated with the integration of mineral processing within underground mining using a total systems approach. It demonstrates conceptual integrated system desi
Jan 1, 2003
-
Effects of Operating Parameters on Grinding Steel Consumption"INTRODUCTIONThe Kidd Creek Concentrator is located 28 kilometers east of the city of Timmins, Ontario. Two types of ore are treated; 'A' type, a copper-zinc-low silver ore producing copper and zinc c
Jan 1, 1988
-
Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage ForcesBy R. E. Barbosa
Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present
May 1, 2009
-
Agglomeration of Sulphide MineralsBy J. A. Finch, J. Vergouw
"Flotation selectivity becomes progressively more difficult to achieve with decreasing particle size. One of the possible problems is agglomeration, i.e. particles clustering together. One mechanism d
Jan 1, 1997
-
The use of Rubber Mill Liners in the Strathcona Concentrator Of Falconbrillge Nickel Mines LimitedBy F. G. Pickard
"The Strathcona Concentrator is one of three concentrators presently operated in the Sudbury District by the Nickel Division of Falconbridge Nickel Mines Limited. Production commenced in 1968 at a mil
Jan 1, 1974