Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Inco's SO2 - Air Cyanide Removal ProcessBy R. Vergunst, E. A. Devuyst, G. Robbins
"INTRODUCTIONThe Inca process for continuous cyanide removal from industrial wastewaters was patented in 1984 by G.J. Borbely, et.al. (1). The process requires SO2, air, lime and a copper catalyst. Bo
Jan 1, 1989
-
Recent Trends in Autogenous GrindingBy Bunting S. Crocker
This paper reviews the trends in the past two years in autogenous grinding throughout the world. It covers rock grinding in South Africa, Sweden, Canada, the United States, Finland and Germany. To pro
Jan 1, 1963
-
Some Properties of Aerated PowdersBy S. P. Chong, N. C. Shih, G. A. Turner
Fine powders, with the bulk of the particle diameters Jess than 10 microns, were aerated so that each particle was, on the average, separated from its neighbours by 1.3 to 2 mean diameters. In this st
Jan 1, 1970
-
Great Bear Lake -Coppermine River AreaBy D. F. Kidd
Introduction In a companion article, Surveys at Great Bear Lake, 1931, R. C. McDonald has described the general character, topography, and climate of the Great Bear Lake-Coppermine River area and the
Jan 1, 1932
-
Routine Dust Measurements and Standards"A growing public awareness of work-related diseases such as pneumoconiosis and the impact of this awareness on legislative bodies and on the skilled labour market are reasons why the Canadian mining
Jan 1, 1972
-
Criticality-Based Model for Rehabilitating Subway StationsBy M. Abouhamad
According to the Canadian Urban Transit Association (CUTA), 140 Billion CAD is required to maintain, rehabilitate, and replace subway infrastructure between 2010 and 2014. The current practice adopted
Aug 1, 2013
-
The Effect of DMSA Addition on the Performance of Thiosulfate Leaching of GoldBy S. Hume, J. Shepherd
Meso-2,3-dimercaptosuccinic acid(DMSA) was studied as an additive for thiosulfate leaching of gold. DMSA was added to solutionscomposed of either sodium thiosulfate or calcium thiosulfate and the solu
Jan 1, 2015
-
Chapter 1. Formation of an AgreementBy Karl J. C. Harries
"1.1. WHAT ARE AGREEMENTS AND HOW ARE THEY FORMED?In order to have an agreement, at common law, there must be an offer, acceptance of that offer, and consideration passing between the parties. In addi
Jan 1, 2003
-
Contemporary International Law on the Seabed and Ocean FloorBy J. A. Beesley
This paper reviews contemporary international law concerning the seabed, current developments in the United Nations on the seabed, and the main outstanding problems. It emphasizes the importance that
Jan 1, 1969
-
Use of Glycine as an Alternative Lixiviant to Leach Copper from ChalcopyriteBy Jaeheon Lee, Junmo Ahn, Doyun Shin
"Many alternative leaching systems including bacterial leaching have been introduced to avoid passivation on the surface of chalcopyrite and to increase the leaching efficiency of copper from chalcopy
Jan 1, 2017
-
The Role of Bubble Air Stream in Selective FlotationBy Vladislava A. Ignatkina, Victor D. Samyguin
"Within the limits of two-phase approach, considering mass transfer with pulp and air streams was shown that each bubble appears to be an elementary carrier, transporting particles from the collection
Jan 1, 2016
-
Effect of grain refinement on the tensile and fatigue crack growth properties of sand cast AM60 magnesium alloyBy M. Mahfoud
The effect of grain refinement on the tensile and fatigue crack propagation behavior of sand cast magnesium alloy AM60B has been investigated in the present study, C2Cl6 in the amount of 0,3% was used
Jan 1, 2005
-
Derive Establishment Strategy of BIM Library Market and Optimal Revenue-Sharing Strategy Between the Business PrincipalsBy Dong-min Lee
As the construction industry is becoming more large-scaled and complex, the BIM technology has been utilized throughout the industry. Since 2008, the construction industry in South Korea (Korea) has r
Aug 1, 2013
-
Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", PolandBy W. Swidzinski
"Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola
Jan 1, 2007
-
The Kinetics of Cerium (III) Oxidation with Different OxidantsBy Ahmad Ghahreman, James McNeice
"Cerium is the most abundant rare earth metal and is often found in deposits along with small amounts of more valuable metals such as neodymium and gadolinium1. As a result, the production of cerium o
Jan 1, 2017
-
Process Scale-up For Uranium, Mercury And Cesium Recovery From Surrogate Radioactive Cemented WasteBy A. Demers, M. Chapman, N. Reynier, R. Lastra, M. Courchesne, C. Laviolette
Historic medical isotope production at Canadian Nuclear Laboratories (CNL) in Chalk River involved the dissolution of irradiated isotope targets prior to extraction of Mo-99. This process generated li
Jan 1, 2020
-
Preliminary Mining and Construction Planning of the Churchill Falls ProjectBy H. L. Snyder
This paper outlines the approach to the underground construction work involved in the Churchill Falls Power Project. It is the first in a series of papers which CIM Bulletin plans to publish as the di
Jan 1, 1968
-
Proper equipment replacement timing the key to replacement economyBy R. E. Stewart
"Using the concept of economic life and marginal analysis, it can be shown that proper equipment replacement timing can save a mining company many thousands of dollars. To assist management with deter
Jan 1, 1980
-
On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’By Phillip Cancilla, Daniel Roy, Frank Rosenblum
"The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti
Jan 1, 2001
-
The CMIC / CanmetMINES Comminution Energy Recovery Potential Initiative – The Agnico Eagle Goldex Division CaseBy Yan Germain, Université Laval, Bernard Dallaire, Jocelyn Bouchard, Peter Radziszewski, Gilles LeBlanc, Michelle Levesque, Nicolas Tremblay
"The comminution process is estimated to be only 1% efficient, resulting in waste energy dissipated as heat, noise, and vibration. Energy recovery from grinding circuits has not been implemented mainl
Jan 1, 2016