Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Moveable Mineral Processing Miniplant

    By P. Wells, P. Quinn

    "A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such

    Jan 1, 2003

  • CIM
    A Computer Model Study of Methane Migration in Coal Beds

    By H. S. Price, F. N. Kissell, R. C. McCulloch, J. C. Edwards

    "The methane em1ss10n from deep coalbeds which are actively mined is a serious problem facing the mining industry today. Pinpointing the source of methane and predicting the emission of this gas from

    Jan 1, 1973

  • CIM
    Development of a Stable Social Unit at the Black Angel Mine

    By P. J. Noakes

    Remote and isolated, located in a frigid, hostile environment, the Black Angel mine in Greenland had to create a warm social environment which would help attract and retain a stable work force of mine

    Jan 1, 1978

  • CIM
    Characterization of the 75% Gd0.8Sr0.2Co03_6 / 25% Ce0.9Gd0.102-8 composite cathode system for use in intermediate temperature solid oxide fuel cells

    By L. B. Kilius

    The composite cathode system based on Ce0.9Gdo.1O2_,5 electrolyte with a painted cathode was used for an intermediate temperature (500-700°C) solid oxide fuel cell. This cathode system was chosen due

    Jan 1, 2005

  • CIM
    Environmental Harmony ? An Objective in Mine Planning and Development

    By W. G. Dallas

    The social and environmental problems presented by the location of a large zinc/ lead ore body within one mile of a thriving town are described. The development problems are social, involving the educ

    Jan 1, 1977

  • CIM
    Assessment of Properties and Microstructure of X100 Pipeline Girth Welds

    By D. V. Dorling, J. T. Bowker, J. A. Gianetto

    Over the last few years, interest in the development and construction of large diameter, high pressure pipelines from the Mackenzie Delta in northern Canada and Alaska's North Slope has steadily

    Jan 1, 2005

  • CIM
    Comparative economics of bacterial oxidation and roasting as a pre-treatment step for gold recovery from an auriferous pyrite concentrate

    By S. R. Gilbert, C. O. Bounds, R. R. Ice

    "Many ores are upgraded to produce auriferous sulphide concentrates (principally pyrite) which are not amenable to direct cyanidation. Often these refractory gold-bearing concentrates contain undesira

    Jan 1, 1988

  • CIM
    Vocational Guidance and the Professional Scientific & Engineering Societies

    By Garnet T. Page

    "ABSTRACTThese societies •can help in such aspects of a vocation.al guidance program in secondary schools as: provide vocational and technical information, and assist with vocational exploration, such

    Jan 1, 1952

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Australia?s in situ Recovery Uranium Mining best Practice Guide: Groundwaters, Residues and Radiation Protection

    By I. B. Lambert

    The guide has been developed by officials from resources and environment agencies in the Australian Government and the South Australian and Northern Territory Governments. It elaborates on the Austral

    Aug 1, 2010

  • CIM
    Testing In Situ Aluminium Cell Control with the Dyna/Marc Cell Simulator

    By M. Dupuis

    Recently, a new approach to controlling alumina feeding in a H.H. cell has been proposed [1, 2 and 3]. This approach, labeled In Situ aluminium cell control, is based on a correlation between the slop

    Jan 1, 2011

  • CIM
    Three Dimensional Transient Analytical Modeling of Friction Stir Welding (FSW) Including Actual Affected Parameters

    By S. Rash Ahmadi

    Welding is highly reliable and efficient metal joining process. In welding the metal adjacent to the weld joint is subjected to severe thermal conditions. As a result, complex changes in metallurgical

    Oct 1, 2011

  • CIM
    Milling of Potash in Canada - An Overview

    By Graeme G. Strathdee

    "IntroductionThis paper presents an overview of the industry status, describes current potash industry practices at three mills, and summarizes developments that have taken place since the previous re

    Jan 1, 2000

  • CIM
    Ergonomic Intervention Through the Design of Jumbo Drill Rigs and its Effect on Cost Savings and Workers Health and Safety

    By Cindy Schiewek

    Industrial injury occurrences are an ongoing concern for Mine Operators. Along with the personal suffering of injured workers comes an increase in compensation and productivity costs. Growing recognit

    May 1, 2003

  • CIM
    Slope Stability at Lac Jeannine

    By J. M. Réjean Gagnon

    "Quebec Cartier Mining Company is currently mining a low-grade iron ore deposit in northeastern Quebec. The Company is producing some 8,000,000 dry gross tons of concentrates per year, grading about 6

    Jan 1, 1968

  • CIM
    Mixing Optimization Enables Increased SX Mixer / Settler Production Capacity

    By N. Dobrin, R. Sheinman, Y. V. Kokotov, L. N. Braginsky

    Increasing the production of a Mixer-Settler unit requires either increasing flow rates or increasing extractant concentration. The mixers still have to ensure complete emulsification and to maintain

    Jan 1, 2014

  • CIM
    Processing of Refractory Sulphides at Mantos de Oro, Chile

    By John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.

    "Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow

    Jan 1, 2009

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Lithogeochemical patterns associated with the Darrehzar porphyry Cudeposit, Pariz area, Iran

    By H. Ranjbar

    The Darrehzar porphyry Cu deposit is situated in the Urumieh-Dokhtar magmatic suite of Central Iran. The REE and trace element data suggest that the deposit lies within a continental margin setting. P

    Jan 1, 1997

  • CIM
    Arbitration: Effective Dispute Resolution for the Metallurgical Industry

    By P. A. Tichauer

    Arbitration is a flexible method for dispute resolution that gives control to the disputing parties while still maintaining a clear and well-structured decision making process. It responds to the desi

    Jan 1, 2015