Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effects of Borehole Deviation on Blasting Results and the Tolerable Error in Borehole Surveying

    By Jerry J. Ran

    In open stope mining borehole deviation is one of the main factors affecting the blasting results. Though previous research has identified some actual deviation patterns, these studies are unable to r

    May 1, 2002

  • CIM
    Summary of industrial minerals in Saskatchewan

    By Paul Guliov

    Potash dominates the industrial mineral scene in Saskatchewan accounting for 44% of total provincial mineral production in 1981. More than 7 million tonnes of potash have been produced annualy in rece

    Jan 1, 1984

  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001

  • CIM
    Gold as a Novel Catalyst in the 21st Century : Preparation, Working Mechanism and Applications

    By Masatake Haruta

    Gold can be deposited as nanoparticles on a variety of support materials by coprecipitation or deposition-precipitation of Au(OH)3, grafting of organo-gold complexes such as dimethyl-Au(III)-acetylace

    Oct 1, 2003

  • CIM
    Mass Flow Prediction for Reagent Control at Les Mines Selbaie (eace00b2-88bf-4cb6-8ac7-61dd727f9e04)

    By C. Bazin

    "Discrete transfer functions which use the grinding circuit feed tonnage to predict mass flowrates at reagent addition points in the flotation circuit were calibrated using a dynamic grinding/flotatio

    Jan 1, 1993

  • CIM
    Development of a 5D Mining Exploratorium for Mine Plan Audits

    By Paul G. Dunn

    The planning of underground mines is a complicated process involving geological, engineering and operational constraints. MIRARCO is in the process of developing a 5D Mining Exploratorium where 3D min

    May 1, 2003

  • CIM
    Geomechanical Analysis of Maximum Operating Pressure for SAGD Reservoirs

    By Dale A. Walters

    The thermal recovery of bitumen reservoirs by steam assisted gravity drainage (SAGD) is often designed to maximize the operating pressure. In general, the benefits of higher operating pressures are hi

    Jun 1, 2012

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • CIM
    Pyrometallurgical operations of the Cominco lead-zinc smelter

    By G. W. Toop

    "The Cominco smeller in Trail, British Columbia, is a large integrated lead-zinc production facility. In the plant description, emphasis is given to the pyrometallurgical operations including zinc con

    Jan 1, 1994

  • CIM
    Development and Production at The Lingan Mine, Cape Breton Island

    By W. Leblanc, J. C. Marsh, D. Kettle, J. Tompkins, G. Hartley

    "The Lingan Mine is the newest of the four operating collieries of the Cape Breton Development Corporation and is located on the east coast of Cape Breton Island. Development of slopes began in 1969 u

    Jan 1, 1973

  • CIM
    Investigation of Volatilization of Arsenic and Antimony from Tennantite/Tetrahedrite Ore by Roasting Process

    By Kazutoshi Haga, Batnasan Altansukh, Yasushi Takasaki, Mohd Yazid Bin Abdul Razak, Atsushi Shibayama

    "In this study, the volatilization behaviour of arsenic (As) and antimony (Sb) from arsenicantimony bearing minerals such as tennantite (Cu12As4S13)/tetrahedrite (Cu12Sb4S13) in copper ore was investi

    Jan 1, 2016

  • CIM
    A Comparison of Grindability For Forty-Five Non-Metallic Materials

    By R. A. Wyman

    A comparison of the amount of minus-28-mesh product produced by a standard grinding test procedure is provided for 45 non-metallic materials. The percentage of product, the weight of product per unit

    Jan 1, 1977

  • CIM
    Separation and Purification of Rare-Earth Elements Based on Electrophoretic Migration

    By P. Hajiani

    "Feasible and sustainable separation of lanthanides outside of China has been a dilemma for the past few years. The present technique uses REE electrophoretic mobility (Ui) variation in an electrical

    Jan 1, 2016

  • CIM
    The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery Circuits

    By Z. Xiao, A. R. Laplante

    "The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri

    Jan 1, 2001

  • CIM
    Quantifying Dependencies in Computer-Based Mining Simulation Modeling

    By Mustafa Kumral

    Monte ? Carlo simulation is often used to assess the risks associated with uncertain variables in mining operations. The success of Monte-Carlo simulations depends upon reproducing the dependencies am

    Aug 1, 2013

  • CIM
    A Simple Gravity-Recoverable Gold Test

    By Jason Clarke, André R. Laplante

    "The gravity-recoverable gold (GRG) ore characterization test was developed 15 years ago and has been applied to hundreds of ore samples. The test accurately determines the size distribution of GRG, a

    Jan 1, 2006

  • CIM
    Assessment of Material Diggability for Shovel Excavation in Oil Sands

    By Sibabrata Patnayak

    A major problem during shovel excavation in oil sand mining is the variability of material diggability resulting in varying mechanical energy input, cycle time, energy consumption, wear, and stress lo

    Apr 1, 2005

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • CIM
    Map Filing

    By H. S. Fowler

    The Consolidated Mining and Smelting Company has been in the business of mining and exploration since its incorporation in 1906. The Company has reports written as early as 1890. Consequently, its fil

    Jan 1, 1944

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014