Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geological Setting of the Meadowbank Gold Deposits, Woodburn Lake Group, Nunavut

    By William J. Davis, R. Blair Hrabi, Sally Pehrsson, Amelia V. Logan, Ross Sherlock

    "Abstract - The Meadowbank gold deposits are hosted by a series of polydeformed and metamorphosed auriferous iron formations located in the Neoarchean Woodburn Lake group, western Churchill province,

    Jan 1, 2004

  • CIM
    Coal mining in the Drumheller district

    By T. Patching

    "Introduction The occurrence of coal was first reported in the Drumheller area in 1793 but it was not until 1912 that production of coal was recorded. In that year 13,000 tonnes were mined in the Drum

    Jan 1, 1985

  • CIM
    Estimation of the Average Value of Gold Ore

    By W. A. Jones

    THE estimation of the average value of gold ore involves many considerations, among them the correct sampling of the deposit, the dilution by waste, and the loss of high-grade fines. It is a common ex

    Jan 1, 1943

  • CIM
    Bath Ratio Control Improvements at Alcoa Poços De Caldas - Brazil -An Update

    By L. Paulino, R. A. Camilli, J. Yamamoto, J. C. Araujo

    The first paper presented on this work [1], showed how bath ratio was increased from 78% to over 95% using a structured approach to reduce bath chemistry variability. This update will illustrate the s

    Jan 1, 2006

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • CIM
    Development of a Combination Shaft and Electric Furnace

    By G. V. Sirianni, G. E. Viens, R. A. Campbell, G. N. Banks, R. L. Sachdeva

    "A combined shaft-electric furnace for the smelting of ores and the melting of metallized iron pellets is being developed. The materials are preheated, and in some cases pre-reduced, in the shaft befo

    Jan 1, 1968

  • CIM
    Zinc Ferrite Treatment Options to Increase the Zinc Recovery at Teck Cominco's Trail Operations

    By M. A. Nagle

    Various strategic projects were carried out in 2002 to increase the capacity of Teck Cominco's integrated zinc-lead smelter at the Trail operations site in British Columbia, Canada. The lead smel

    Jan 1, 2006

  • CIM
    Tribological factual data base for the mining industry

    By J. Molgaard, J. Masounave, J. Prinsen, P. Beaulieu, G. Huard

    "A study carried out on behalf of the National Research Council (NRC) indicates that economic losses due to wear in the Canadian mining industry are in excess of $700 million annually. Severe wear, ma

    Jan 1, 1987

  • CIM
    Sophisticated Ring Geared Mill Drives Features and Experiences

    By Maarten van de Vijfeijken, Marco Rufli

    "By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve the grinding process. Beside all the direct and indirect advantages, several dedicated

    Jan 1, 2011

  • CIM
    Structural control of gold mineralization at the Sigma Mine, Val d'Or, Quebec

    By Francoi Robert, Andre J. Audet, Alex C. Brown

    "The Sigma gold deposit is in a band of deformed metavolcanic rocks that are cut by an irregular mass of porphyritic diorite and by narrow undeformed feldspar porphyry dykes. The gold is in veins cons

    Jan 1, 1983

  • CIM
    Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™

    By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt

    Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are

    Jan 1, 2019

  • CIM
    Zen and the Art of Specification Writing (77d7cb41-bec5-4fd5-adc0-f77765b61b69)

    By R. A. Nemchek

    Over the years, concentrator plant design has evolved from a large number of small grinding mills to a small number of large mills. In many cases, all of the tonnage runs through a single mill (typica

    Jan 1, 2012

  • CIM
    Tunnelling in Horizontally Laminated Ground

    By Matthew A. Perras

    With growing populations, infrastructure projects are utilizing underground space to expand transportation networks, water supply and sewer disposal systems and hydropower facilities. These new projec

    May 1, 2009

  • CIM
    Improving Silica Dust Controls for Metal/Nonmetal Mining Operations in the United States

    By Jay F. Colinet

    Researchers at the Pittsburgh Research Laboratory (PRL) of the National Institute for Occupational Safety and Health (NIOSH) work to reduce respirable dust exposures in mining operations. One focus o

    May 1, 2007

  • CIM
    Efficient Enhanced Gravity Separation Using the Kelsey Centrifugal Jig

    By Peter Barker, Terry Jones

    "The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully and effic

    Jan 1, 2007

  • CIM
    Chromite Deposits of the Eastern Townships, Quebec

    By C. H. Stockwell

    THE Eastern Townships of Quebec have been the chief Canadian source of chromite. Production, however, has never been large and, except for a period of steady but small output between 1894 and 1909, mi

    Jan 1, 1944

  • CIM
    Faults Affecting the Northeast Thelon Basin: Improved Basement Constraints from Source Edge Processing of Aeromagnetic Data

    By Vicki Tschirhart, Bill Morris, McMaster University

    A new method for mapping faults within basement rocks underlying the Thelon Formation and glacial overburden was developed and tested in the Aberdeen Sub-basin. This method utilizes newly acquired aer

    Jan 1, 2013

  • CIM
    Manufacture of Steel for Rope Wire

    By Fred A. Webber

    STEEL ROPE WIRE is one of the more specialized commodities among the many grades of highcarbon steel wires. In its production there are many metallurgical aspects of interest from the steelmaking on t

    Jan 1, 1957

  • CIM
    Geology of the Key Lake deposits

    By Arthur L. de Carle

    "IntroductionThe Key Lake uranium-nickel deposits are located within a Mineral Lease centred at latitude 57 ° 12' north and longitude 105 °39' west along the southeastern rim of the Athabasca sediment

    Jan 1, 1986

  • CIM
    Dead Roasting of Dumont Nickel Concentrate

    By M. Muinonen, R. Pandher

    Royal Nickel Corporation is developing the Dumont Nickel Project, a large nickel sulphide deposit located near the town of Amos, Québec. The nickel occurs as pentlandite, heazlewoodite, and awaruite.

    Jan 1, 2015