    An Approach to Assess and Control the Flotation of Minerals – Semiconductors

    By V. Panayotov, M. Panayotova

    "Finding a reliable relationship between fundamental properties of minerals of non-ferrous metals and their ability to float is extremely important. The approach presented in this work allows us to dr

    Jan 1, 2016

  • CIM
    Transformation Behaviour of a Fine-Grained HSLA Steel

    By R. Loney, M. Militzer

    There is a significant demand for new high strength steels with fine grain sizes for structural applications. One approach in this regard is to develop hot-rolled HSLA steels where refining the micros

    Jan 1, 2004

  • CIM
    The Approach to Process Improvements at Brunswick Mine

    By Chris Larsen, Carole Fortin, Dave Scott, Curtis Deredin, Ian Orford, Jean Guy Gauthier, Andy Trusiak, Lyne Côté, Mike Cooper

    "Upon successful commissioning of the Stage Grinding Project (Cormier et. al., 2002), process improvements predicted through pilot plant testing were obtained in several flotation circuits, resulting

    Jan 1, 2005

  • CIM
    Geomechanics Strategies for Rockburst Management at Vale Inco Creighton Mine

    By F. Malek

    At Creighton Mine, magnitude events are a regular occurrence due to depth and major seismically-active structures. Over the last ten years, major advances have been made in research and development to

    May 1, 2009

  • CIM
    Revision of the Geology of the Southern Alberta Plains

    By Loris S. Russell

    THE plains of southern Alberta constitute one of the classic areas of geological investigation in Canada, for it was here in 1874, and in 1881 to 1883, that George Mercer Dawson (1, 2, 3) made the pio

    Jan 1, 1937

  • CIM
    Refining Practice at Pamour

    By R. H. Duval

    "In May 1936, Pamour started producing gold by cyanidation of flotation concentrates, and in 1939 was milling about 1, 600 tons per day.Refining records dating from 1939 show two oil-fired furnaces in

    Jan 1, 1965

  • CIM
    Light Weighting the Automotive Industry the Road to 2025 CAFÉ

    By G. S. Cole

    By 2025, the U.S. automotive industry will have to average 54.5 mpg (4.3l/100km) Corporate Average Fuel Economy (CAFÉ). While new/improved powertrain technology (turbocharging, electrification, diesel

    Jan 1, 2016

  • CIM
    Commissioning of the Ekati Diamond Mine

    By Mike Rylatt

    "The BHP Diamonds Inc. and Blackwater Group (Dia Met Minerals Ltd., Charles Fipke and Stewart Blusson) joint venture began production at Canada=s first diamond mine during the last quarter of 1998.Con

    Jan 1, 1999

  • CIM
    The Impact of Crushed Ore Ageing on Metallurgical Performance

    By O. Peters, D. Lascelles, R. Caldwell

    Ageing tests on a crushed Cu-porphyry ore were conducted to assess the impact of sample oxidation on flotation performance. The objective of the testwork was to simulate ageing of ore that would be bl

    Jan 1, 2009

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • CIM
    The Yunnan Consolidated Tin Corporation, Kochiu, Yunnan, China

    By T. T. Ni

    FOR MORE THAN 200 years, the Kochiu district of Yunnan province has been, and it still is, the hub of China's tin industry. The district produces annually from 80 to 90 per cent of that country&a

    Jan 1, 1951

  • CIM
    Beneficiation of Oolitic Iron Ores

    By K. Peake, A. Dalvi, V. Hernandez, S. Chang, M. Oliazadeh

    "Ironstone Resources Ltd. is developing the Clear Hills oolitic iron ore deposit in northwest Alberta, Canada. Sources of oolitic iron ore worldwide are abundant and ubiquitous, but there is currently

    Jan 1, 2014

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Maximisation des revenus et du rendement financier par l'optimisation de l'information, de la planification et des pratiques minières

    During the past 10 years, research work to improve the survey of stope limits after mining supplied useful information, particularly for large open and sub-level stopes, regarding waste dilution cause

    Jan 1, 2005

  • CIM
    Computer Control Experiments at Lake Dufault

    By H. W. Smith, C. L. Lewis

    "A process control computer has been installed in the Lake Dufault concentrator to: (a) control the on-stream X-ray analyzer and convert chart readings to elemental percentages, (b) calculate the flow

    Jan 1, 1969

  • CIM
    Géologie et Minéralisations En Zn-Cu-Ag-Au Des Mines Selbaie

    By Jean-Jacques Bouillon, Michel Jébrak, Stephane Faure

    "Le gisement polymétallique (Cu-Zn-Au-Ag) des Mines Selbaie est forme par un réseau de filons encaisses dans une séquence de pyroclastites felsiques du sill on Harricana-Turgeon. Les minéralisations s

    Jan 1, 1990

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • CIM
    Manganese Removal Process: from project status to production CIM

    By Robin Belley

    Outline Introduction Wabush Mines HistoricalBackground Mine and Concentrator at WabushMines High Intensity Magnetic Separators (HIMS) Development of the Manganese Removal Process Pilot Plant T

    May 1, 2011

  • CIM
    A Techno-Economic Evaluation of the Use of Seawater for Copper Flotation

    By Nawshad Haque, Leanne Smith, Hal Aral, Joseph Cho, Warren Bruckard

    "Water availability is one of the principal parameters in determining the feasibility of mining projects in arid and semi-arid regions. The volumetric water footprint (VWF) of a conceptual model of a

    Jan 1, 2016

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di