Global Survey of Copper Electrorefining: 2019 World Tankhouse Operating DataBy Tim Robinson, Michael S. Moats, William G. Davenport, Andreas Filzwieser, Andreas Siegmund, Shijie Wang
This survey continues the long tradition of providing a snapshot of operating data from industrial electrorefineries. It is a supplement to previous surveys that were performed in 1987, 1991, 1995, 19
Jan 1, 2019
-
Overview on Contirod® Wire-Rod Plant Operations in Sarkuysan (Modernization Activities And Results)By T. Ediz
Sarkuysan Electrolytic Copper holds three competitive technologies namely Outokumpu, Southwire (SCR®) and CONTIROD® under the same roof. After more then thirty years experience of Outokumpu Upcast ® i
Jan 1, 2007
-
Environmental management at Namew LakeBy w. w. Fraser
"In late 1985, Hudson Bay Mining and Smelting Co., Limited announced the Namew Mine/Mill project. Environmental baseline monitoring and planning began in early 1985 while a major drilling program was
Jan 1, 1991
-
Tailings Dam Engineering An Overview of its Evolution, Current Practice and New Challenges Topic Area ? Metal Mining, EnvironmentBy Robert C. Lo
As tailings dams grow in physical size, their impact on public safety and the environment also increases in severity. Over the last three decades, tailings dam engineering has evolved from largely "tr
May 1, 2001
-
Improvement of End-Of-Life Electronic Products Recycling Process in JX Nippon Mining & Metals GroupBy Y. Miyabayashi, K. Nishikawa, H. Nagai
JX Nippon Mining & Metals Group recovers valuable metals from end-of-life electronic products in an economical and environmentally-benign way, based on technologies that have been acquired in mining,
Jan 1, 2014
-
Forecasting Sag Mill Energy Consumption Using Gated Recurrent UnitsBy S. Avalos, J. M. Ortiz, W. Kracht
Semi-autogenous grinding mills are intensive energy consumers. Current models base their energy consumption inference on operational variables and feeding ore characterization. While they provide adeq
Jan 1, 2019
-
Vertical Cutter Mining? A BARGE WILL BE INSTALLED IN THE BOTTOM OF A COMPLETED PIT. ? THE PROVEN BAUER CUTTER TECHNOLOGY WILL BE INSTALLED ON THE BARGE AND A DEWATERING PLANT WILL BE INSTALLED NEAR THE BASE OF THE PIT
May 1, 2003
-
Flow Behavior of Aluminums Alloys in Semi-Solid State Using Backward Extrusion TechniqueBy F. Hosseini
Shaping of metals by thixoforming relies on the unusual flow behavior of semisolid slurries containing nondendritic solid phase. The Flow behavior of metallic alloys containing both solid and liquid p
Oct 1, 2011
-
Vanadium Market Structure and OutlookBy T. T. Perles
This paper will review the state of the global vanadium industry and outline the implications for the market in the coming years. Global vanadium resources and reserves will be defined. Current produc
Jan 1, 2014
-
Characterization of Flue Dusts from a Copper Smelter Furnace, Copper Recovery and Arsenic StabilizationBy A. Morales
Flue dusts from a copper smelting furnace (continuous furnace), have been extensively characterized. The main phases detected have been cuprospinel, anhydrous copper sulfate (chalcocyanite), lead sulf
Jan 1, 2007
-
Mine 2-4D vs MineschedThe 2-4D window shown above is the base startup window which allows you to begin a new project. ??Setting up the project is the first step ??The next step is to setup the properties to be used in th
Feb 1, 2008
-
Rabbit Lake project - mining and developmentBy G. W. Clark
"The mining of the ore bodies at Rabbit Lake has in the past been by the open pit method. This method is presently being used to develop the B-zone and will continue into the future with the developme
Jan 1, 1989
-
Risk Management and Project EvaluationWhat Discounted Cash Flow Analysis can do for you: ?Provide an accurate financial analysis of a project for the first 25 to 30 years of operations ?Identify cash flow requirements ?Identify relativ
May 1, 2010
-
How 3D Images Support Rock EngineeringBy Andreas Gaich
COMBINED 3D IMAGES _ Highly detailed 3D geometry _ Identification of fine fractures together with a general impression of the situation _ Dealing with unfavourable outcrop geometries
May 1, 2009
-
Chemical Analysis of Uranium OresBy H. Polkowska-Motrenko
Analytical methods for the determination of uranium and other precious elements in ores, industrial wastes and by-products have been developed. The analytical techniques employed are NAA and ICP-MS. T
Aug 1, 2010
-
Large Steelmaking Slag Blocks Using New Carbonation ProcessBy T. Takahashi, K. Oyamada, Y. Miyata, T. Isoo
The carbonation reaction of steelmaking slag has been known for many years. However, the size of blocks manufactured from this by-product material has been limited due to the difficulty of achieving a
Jan 1, 2004
-
Phosphate deposits in British ColumbiaBy Z. D. Hora
Sedimentary phosphate-bearing rocks are found over a considerable area of so utheastern British Columbia that extends from Fernie east to the Alberta-British Columbia boundary and from the Internation
Jan 1, 1984
-
Microstructure and Mechanical Properties of Twin-Roll Cast Al-Mg Based AlloysBy C. Y. Lim, H. W. Kim, M. S. Kim, J. H. Cho, Y. S. Lee
Al - 5.5 wt% Mg - 0.3 wt% Cu alloy strip was successfully fabricated by horizontal-type twinroll casting (TRC). For producing sound strips with no surface defect, the casting was conducted at various
Jan 1, 2014
-
Electrochemical Formation of RE-Ni (RE= Nd, Dy, Pr) Alloys in Molten SaltsBy R. Hagiwara, S. Kobayashi, K. Yasuda, T. Nohira, K. Kondo
To establish a process for the electrochemical recovery of rare earth elements from used magnet scraps, the electrochemical formation of RE-Ni alloys in molten NaCl-KCl-RECl3 salt at 973 K was investi
Jan 1, 2014
-
Geochemical profile of till from Longlac, Ontario to Somerset IslandBy William W. Shilts
"In carrying out a geotechnical survey of a proposed gas pipeline route from the Arctic Islands south to Longlac, Ontario, the Polar Gas Consortium contracted the drilling of several hundred 2- to 2D-
Jan 1, 1980