Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Monitoring of Dynamic Energy Resistant Rockbolts: Laboratory and Field ResultsBy F. Charette
Instrumentation has been developed that can monitor the strain applied to a D-Bolt up to 7.5% elongation. The technology far exceeds the limit for foil resistance strain gauges. In the laboratory the
Aug 1, 2013
-
Energy Consumption for Iron Chloride Pyrohydrolysis: A Comparison between Fluidized Beds and Spray RoastersBy K. Adham
Iron chloride pyrohydrolysis (ICP) is used as an efficient way to fix iron as an oxide, for sale as a by-product or for safe disposal. Iron chloride is reacted with water at elevated temperatures to y
Jan 1, 2006
-
Dust Suppression 1n the Sydney Coal FieldBy D. McFadgen
"THE Dominion Steel & Coal Corporation, through its subsidiaries, the Old Sydney Collieries and the Dominion Coal Company Limited, produces 4% million tons of coal annually from eight submarine collie
Jan 1, 1960
-
Thermal Fatigue in Rocks- La Roque-Gageac' Case StudyBy D. Virely, M. Gasc-Barbier, J. Guittard
"The valleys of the Dordogne and the Vézère (France) have been inhabited since prehistoric times, as evidenced by the famous site of Lascaux. A few miles away, the village of La Roque-Gageac is also a
Jan 1, 2015
-
Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper IndustryBy A. Bezama
For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a
Jan 1, 2007
-
An Examination of the Failure Mechanisms in Modeled Cemented Paste BackfillBy R. L. Veenstra
This paper explores the connection between the stresses observed and the failure mechanisms present in the modelled cemented paste backfill. In order to look at this connection, the authors have used
Aug 1, 2013
-
A Risk-Based Approach to Plant DesignBy Mike Fontaine
The success of a project is defined by meeting the financial performance objectives of the business case within a stipulated timeframe. Early in design, little information is normally available; the u
Jan 1, 2015
-
Ontario?s Experimental Plant for Resource RecoveryBy B. I. Boyko
As part of the Ministry of the Environment's Resource Recovery Program, the Province of Ontario has constructed a $13 million "Experimental Plant for Resource Recovery" in Metropolitan Toronto. T
Jan 1, 1978
-
Application of Confocal Scanning Laser Microscopy for Improving Steel CleanlinessBy K. Miao, W. Mu, M. Sharma, A. Haas, N. Dogan
"The ever increasing demand for cleaner steels with low inclusion content has highlighted the limits of our current knowledge for controlling and predicting inclusion agglomeration and removal during
Jan 1, 2017
-
Mining Methods and Equipment Used at IMC' s Esterhazy OperationsBy A J. Kyle
After a brief description of the shaft and surface facilities, this paper describes the planning for the mining operation, the selection of equipment the general method of mining and the sequence of o
Jan 1, 1964
-
Optimization Initiatives at Altonorte on the Path to Becoming a World Class SmelterBy Beatrice Pierre, Juan Carrasco
Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001
Jan 1, 2019
-
Developments in slurry pump technologyBy G. A. Davidson, P. G. Williams
"New developments in centrifugal slurry pump technology are discussed in relation to their importance for improving pump operation and reliability.Experimental data obtained by measuring the velocity
Jan 1, 1992
-
Effect of Various Additives on Valuable Metals Recovery from Copper Cliff Converter SlagBy A. Mitrašinovic, A. Wolf
"The aim of this investigation was to determine the most suitable additive for recovering metals from converter slags generated during Ni extraction. Fluxes analyzed were silica and lime and reductant
Jan 1, 2015
-
The Internal Shaft at Dome Mines, LimitedBy Chas Kemsley
NO. 6 shaft at Dome Mines, Limited, is an internal shaft going down vertically from the sixteenth, or 2,000-ft., level to the twenty-ninth, or 4,000-ft., level, with loading station and sump below thi
Jan 1, 1938
-
Doing More with What We Already Know – Improving the Efficiency of Minerals ProcessingBy Joe Pease
"The demand for minerals and metals is increasing. Head grades of ore bodies are dropping. Remaining ores are becoming finer grained, more complex, and more logistically challenging. Mineral processin
Jan 1, 2015
-
The Continuous Separation of Tar Sands by Oil-Phase •AgglomerationBy B. D. Sparks, I. E. Puddington, F. W. Meadus
The continuous separation of bitumen from Athabasca tar sands, with a high clay content, has been demonstrated. Recoveries of 95 per cent or higher have been obtained. Further processing of this produ
Jan 1, 1971
-
Influence of Iron on the Complexation and Oxidation of Quebracho: An Investigation on the Stability of Sulfur Dispersing AgentBy L. Tong
"The oxidation of Quebracho was evaluated by acid-butanol assay, which indicates depolymerization of Quebracho. Anthocyanidin, an oxidation product of Quebracho, is stable at 95?C for up to 2 h. The i
Jan 1, 2012
-
Mechanization with Crawler-Mounted Loaders in Mines of Century Coals LimitedBy A. C. Hnatyshyn
INTRODUCTION THOSE concerned with coal mining operations in Alberta have been asked repeatedly the same question, "Why is mechanization in Alberta proceeding so slowly as to lag far behind the mines
Jan 1, 1951
-
Operation and Improvements at the El Indio Roasting FacilityBy John Frostiak, Lloyd Buckingham, Kenneth G. Thomas, Luis Wilson
"The El Indio roasting facility associated with El Indio Mine in Central Chile has operated since 1981. It is a facility developed to remove arsenic and antimony from gold bearing enargite/pyrite flot
Jan 1, 1999
-
Ore Hauling Alternatives from Mine to SiteBy L. Tikasz
The primary purpose of ore hauling model studies is to capture the variability of the ore delivery ? stockpiling process in order to improve the estimation of equipment capacities and achievable throu
Aug 1, 2013