Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Characterisation and Modelling of the Behaviour of Gold-Silver Competitive Co-Adsorption in CIL/CIP CircuitsBy K. Barbetti, J. Avraamides
"The processing of gold ores with high silver contents can provide operational challenges, such as high cyanide consumption, retardation of gold leaching and competition during adsorption stages of ca
Jan 1, 2016
-
Integrated Water Cyclone Plants for Coal PreparationBy J. Visman
"Cyclone separators of different design are being used in increasing numbers in the coal industry of today. One recent addition, the Compound Water Cyclone, is finding application in the North America
Jan 1, 1968
-
Profitable Production: Nevada's First Paste Backfill PlantAbout Barrick Paste Backfill at Barrick Goldstrike Rodeo Paste Plant Cyclone Lab Testing Challenges and Lessons Learned Future Barrick Projects
May 1, 2013
-
Energy Initiatives Ontario OperationsOntario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co
May 1, 2007
-
New Development of Zinc Hydrometallurgy in ChinaBy W. Haibei, Lei. Z., Z. Bangsheng, W. Yufang, J. Kaixi
In 2007 output of zinc was more than 3.71 million tons in China. Some new projects have finished FS and several new zinc plants are building now. In recent ten years it happened great changes in zinc
Jan 1, 2008
-
New Environmentally Friendly Corrosion Inhibitor as Replacement for ChromateBy M. Reda
Because of the adverse environmental effect of Chromate, Molybdate ions had been investigated as replacement for Chromate and the results had shown not to be encouraging. Film deposited from peroxopol
Jan 1, 2010
-
Twin Mining's Jackson Inlet Diamond Play - An Arctic project with a competitive edgeBy Dallas W. Davis
Twin - Kennecott Deal Announced April 15, 2004 ! Kennecott earns 56% interest, if in 4 years, spends C$10 million and recovers at least 200 cts of +1 mm diamonds in all dimensions from any contiguous
May 1, 2004
-
Grinding Circuit Design for Similco MinesBy Anita Marks
In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197
Jan 1, 2012
-
International Trade in Minerals and Economic Development (08ef22d4-9c9e-4f31-8cb9-9e9b9468c70c)By Herbert D. Drechsler
"THE FOLLOWING are some comments on the article, ""International Trade in Minerals and Economic Development"", by M. Sengupta, published in the October 1976 issue of the CIM Bulletin.Sengupta says in
Jan 1, 1977
-
An Integrated Mining and Chemical Plant Complex for Various Strontium and Barium ProductsBy W. J. D. Stone
"For several years, the existence of a deposit of barite (BaS04) near Brookfield, Nova Scotia, has been known. A very large deposit of strontium (SrS04) near Sydney, Cape Breton, is a more recent disc
Jan 1, 1969
-
Ontario Ministry of Natural Resources incentive programs to encourage exploration and to facilitate the development of small mines in northwestern OntarioBy R. C. Beard
"The Ontario Ministry of Natural Resources has recently initiated several incentive programs to encourage and facilitate the development of new mines in northwestern Ontario. Some are privatized out t
Jan 1, 1982
-
Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova ScotiaBy Erwin L. Zodrow
"The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,
Jan 1, 1982
-
Enhanced Separation of Rare Earth ElementsBy A. Welty, T. Garn, K. Lyon, B. Jakovljevic, R. S. Herbst, M. Greenhalgh, Cytec Solvay Group
"Industrial rare earth separation processes utilize PC88A, a phosphonic acid ligand, for solvent extraction separations. The separation factors of the individual rare earths, the equipment requirement
Jan 1, 2016
-
Design of Hydraulic Backfill Bulkheads at South Deep Gold MineBy A. S. Nortjé
At South Deep Gold Mine longhole stopes are backfilled using a cemented Cyclone Classified Tailings in its hydraulic state. The need to contain the hydraulic fill until cured requires a barricade. Due
May 1, 2007
-
Reminiscences of Willet G. MillerBy C. W. K
This little sketch of the late Willet G. Miller, Provincial Geologist of Ontario, is intended to be neither a biography of his career nor a eulogy of his life. His biography has already been written i
Jan 1, 1925
-
Current Status of the Pebble Creek (North Meager) Geothermal Project, Southwestern British ColumbiaBy Mory Ghomshei
Pebble Creek Geothermal Power project is associated with a massive recent volcanic eruption in Southwestern British Columbia Canada. Slim holes drilled to depths 1100 m in the prospect area, show very
Aug 1, 2013
-
Cathodic Protection of Steel in Hot Water by Alloys of Magnesium, Zinc, and AluminiumBy R. R. Rogers
Abstract The degree of cathodic protection of steel and the anode corrosion rate were determined when anodes and waters of different compositions were used at temperatures similar to those in domes
Jan 1, 1948
-
Suppression of Internal Defects in Cold Drawing of Pure Magnesium WireBy Haruka Takeura, Tomoaki Murata, Kazunari Yoshida, Masato Adachi
"Pure magnesium is a material with high functionality, however, the cold drawing of this material is very difficult, that is why, until this day there are no optimal cold drawing conditions. Furthermo
Jan 1, 2017
-
Formability Correlation between Texture Weekening and Deformation Mechanism in a Rolled AZ31 Magnesium Alloy COM 2014 - 54th Annual Conference of Metallurgists held in Conjunction with AMCAA - America's Conference on Al AlloysBy H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, A. S. Kabir, R. Petrov
The recrystallization and texture evolution of AZ31 sheets obtained through two stages was investigated at different stages of post-rolling annealing. The specimens were rolled at the temperature of 1
Jan 1, 2015
-
The Application of Mining, Minerals and Sustainable Development?s ?Seven Questions of Sustainability? to a Planning Process in AlbertaBy Don Peel
Mineral aggregate, the most widely used mineral resource globally, has attracted little academic or public interest. Of all mining developments, the aggregate resource is seldom factored into resource
May 1, 2004