Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Where did the gold and silver go?

    By John C. Loretto

    "The paper identifies two of the main problems encountered in recent hydrometallurgical plants for the recovery of gold and silver: firstly, the plant recovery is lower than anticipated from the testw

    Jan 1, 1982

  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • CIM
    Some collected notes on the use, material and design of suspension gear

    By E. A. Davies, Trevor T. Jones

    "Aspects of materials, design and operation of suspension equipment is dealt with, hazard, fatigue and special metallurgical properties of certain steels to resist are described, as is the effect of t

    Jan 1, 1987

  • CIM
    The Hematite Process - New Concepts for Increased Throughput and Clean Hematite Production

    By T. C. Cheng, G. P. Demopoulos

    It is the object of this paper to discuss various options for improving the hematite process in terms of increased throughput hence lower capital cost and production of saleable quality hematite. With

    Jan 1, 2004

  • CIM
    Influence of various parameters on underground accidents: a multifactorial approach in Quebec mines

    By Marcel Laflamme, N. R. Rillette

    "In 1982, a study was initiated to investigate relationships between bonus and accidents in Quebec underground mines. In 1983, the study was expanded to include the impact of age and experience on acc

    Jan 1, 1989

  • CIM
    Towards a Novel Process for the Epoxidation of Propene over Gold/Titania-Based Catalysts

    By Aalbert Zwijnenburg

    One of problems connected with the use of gold/titania-based catalyst systems is the low yield in propene oxide (up to 2 wt %). It is shown that the low propene oxide yield is due to product inhibitio

    Oct 1, 2003

  • CIM
    Experience with a Lamella Thickener at the Beaverlodge Operation of Eldorado Nuclear Limited

    By R. Bruce Ferguson

    "IntroductionThe Beaverlodge Operation of Eldorado Nuclear Limited is a uranium property located near the north shore of Lake Athabasca about 7 miles from Uranium City, Saskatchewan.The mill is a 2000

    Jan 1, 1975

  • CIM
    Nanisivik Mine - A Profitability Comparison of Actual Mining to the Expectations of the Feasibility Study

    By Neil R. Burns, Michael Doggett

    Abstract - The Nanisivik mine offers a unique opportunity to examine the economics of a mining scenario from its original feasibility study through to closure. In the early 1970s, the Strathcona Sound

    Jan 1, 2004

  • CIM
    Geomechanical Response to CO2 Injection for the Heartland Area Redwater Project (HARP), Alberta

    By Hamidreza Soltanzadeh

    The injection of CO2 into a reservoir or aquifer can potentially result in deformation, induced fracturing and fault reactivation in the injection zone and/or the rocks that surround it. This paper re

    Jun 1, 2012

  • CIM
    Development of a model for predicting the screening performance of a vibrating screen

    By V. K. Karra

    A mathematical model for the performance of a vibrating screen is developed in terms of an oversize partition curve. This is a normalized curve for any assemblage of particles presented for screening

    Jan 1, 1979

  • CIM
    The Labrador Central Mineral Belt IOCG Province -A Uranium-rich end member of the IOCGU Class

    By Rick Valenta

    Is the Labrador Central Mineral Belt part of the IOCGU Club? ?I sent the club a wire stating, PLEASE ACCEPT MY RESIGNATION. I DON'T WANT TO BELONG TO ANY CLUB THAT WILL ACCEPT ME AS A MEMBER.?

    May 1, 2006

  • CIM
    Platinum Exploration on the Great Dyke of Zimbabwe (662f24a4-cc22-49e2-9505-ce809f71ecd9)

    By D. J. Bowen

    "The Great Dyke extends for 540 krn along strike, to unknown depth, and varies in width from 3 krn to 11 krn. Rb/Sr age determinations gives values of approximately 2470 Ma.The Dyke consists of a vari

    Jan 1, 1994

  • CIM
    Systems and Devices for Minerals Quality Monitoring in EMAG?s Activities

    By Teresa Sikora

    For over 40 years the Institute of Innovative Technology EMAG has specialized in the development of systems and equipment for laboratory and on-line monitoring of coal quality parameters, as well as t

    Aug 1, 2013

  • CIM
    Influence of Anisotropy on the Mechanical Properties of Baixo Alentejo Flysch Rocks (Portugal)

    By I. M. R. Duarte, J. A. Rodrigues-Carvalho, F. R. S. Rosa, A. B. Pinho

    "This paper aims to contribute to the knowledge of the mechanical properties of the shales and greywackes which constitute the flysch-type deposits of the Baixo Alentejo Flysch Group, in the south of

    Jan 1, 2015

  • CIM
    Platinum and Platinum-Gold Nanoparticles Supported on HY Zeolite. Catalytic Activity in isomerization and Oxidation Reactions

    By Golaleh Riahi

    An original method is used to obtain stable nanoparticles of gold-based mono- and bimetallic systems supported on an acidic zeolite. This approach has been applied to PtHY (1wt% Pt) and to bimetallic

    Oct 1, 2003

  • CIM
    Coal reclamation from the Summit Mine dump

    By Godfrey W. McDonald, Dennis E. Fredrickson

    "Commercial coal mining has been recorded in Nova Scotia since 1863 and during this period an estimated 60,000,000 short tons of mine discard containing 10 1030% coal has been accumulated, Approximate

    Jan 1, 1983

  • CIM
    Department of Finance restricts the resource allowance

    By Robert B. Parsons

    "The Department of Finance introduced draft amendments to the resource allowance regulations on July 23, 1992 that effectively nullify the decision in the Gulf Canada Limited case. Prior to the amendm

    Jan 1, 1992

  • CIM
    Performance improvement at the Bell Mine

    By M. C. Ethier, A. L. Laramie

    "The Granisle and Bell Copper mines were officially put into production in 1966 and 1972, respectively. The Granisle Mine was purchased in late 1979by Noranda and the two operations were amalgamated a

    Jan 1, 1990

  • CIM
    Geology and Exploration History of the Amalgamated Kirkland Deposit, Kirkland Lake, Ontario

    By Mark W. Masson, David B. Stevenson, David W. Broughton, Douglas R. Cruji, Steven E. Parry

    "Abstract-The Amalgamated Kirkland gold deposit is located at Kirkland Lake, Ontario, within the Archean Abitibi Greenstone belt of the Canadian Shield. It lies on a fault or "break", termed the Cypru

    Jan 1, 1995

  • CIM
    Contrasting Volcanic-hosted Massive Sulfide Styles ill the Tulks Belt, Central Newfoundland

    By R. M. Graves, C. B. McKenzie, D. Barbour, D. W. Desnoyers

    "The prospective Tulks volcanic belt hosts five significant massive sulfide deposits, Tulks Prospect, Tulks East, Jack's Pond, Daniel's Pond and Victoria Mine, as well as numerous showings a

    Jan 1, 1993