Shaft collaring through deep overburden -a novel approachBy Jack J. Ayotte, Michael R. Nadon
"Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t
Jan 1, 1987
-
Path Planning for Loading Operations by Wheel Loaders Based on Position Control of the BucketBy Shigeru Sarata
A wheel loader is one of the main loading machines in open pit mines. The authors have been conducting research and development on autonomous operation of loading by a wheel loader. The most common lo
Aug 1, 2013
-
Technical and economic comparison of continuous and discontinuous loading in underground ore production and tunnelingBy Egon Berger
"In recent years the trend in underground metal mining has been toward ever increasing blasts (often in excess of 100 000 tonnes per blast). The Canadian mining industry has been in the forefront of t
Jan 1, 1989
-
Location of pinnae e reefs in southwestern Ontario by gravity surveysBy D. T. A. Symons, M. M. Kapnistos
"Gravity profiles were established over five known Middle Silurian pinnacle reef s in Lambton County, southwestern Ontario. The profiles were approximately 3 km long, with stations every 60 m. Four fa
Jan 1, 1980
-
Separation of Arsenic and Recovery of Antimony and Tin from Silicate Slag in a Nonferrous SmelterBy A. Iizuka
This study was aimed at separating and recovering arsenic, antimony, and tin from refining byproducts generated in a nonferrous smelter. The target byproduct was a silicate slag containing the above e
Jan 1, 2019
-
The pneumatic vertical conveying of coal by pipelineBy Tweedy. D. H.
"The paper describes the rapid development of, and operational experience in the utilization of, pneumatic low-pressure pipeline hoisting systems to vertically convey raw coal and rock through shafts,
Jan 1, 1982
-
Process Engineering for the Freeforming of Al-Based Components using CSC-MIG Welding:By S. Brophy
Controlled Short Circuit ? Metal Inert Gas (CSC-MIG) welding is a process that can be referred as a "Cold Welding" technology. The CSC process is based on accurate control of the welding wire position
Jan 1, 2011
-
Residues from the Zinc Industry – A Potential Future Resource for Silver and IndiumBy S. Steinlechner, S. Wegscheider
"In the past, the metallurgical industry was most of the time dedicated on their main commodity, recovering base metals like zinc, copper or lead but leaving other valuable side elements in the genera
Jan 1, 2016
-
Emperical Design of Stopes for the Lower Rodeo OrebodyBy Denis Thibodeau
The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the
May 1, 2002
-
Mine Design and Planning Systems State-of-the-art and Future TrendsBy Mario A. Morin
The last few years have seen considerable consolidation of the mining software industry and a trend towards greater planning and production control system integration, particularly for surface mines.
May 1, 2004
-
Numerical Analysis of Hard Rock Pillars using the Cohesion Weakening Friction Strengthening ModelBy H. Rafiei Renani, C. D. Martin
"The Cohesion Weakening Friction Strengthening (CWFS) is adopted in numerical analysis to capture the observed progressive failure of hard rock pillars. As a case study, pillars at the Elliot Lake min
Jan 1, 2015
-
Status and Causes of Ecological Imbalance of Abandoned Ionic-Type Rare Earth Mine in South ChinaBy Deng Yang-wu, Zhang Yan, Chen Chun-fei, Luo Xian-ping, Luo Cai-gui
This paper summarizes the ecological imbalance status of abandoned rare-earth element (REE) mines in southern China. These include large areas of vegetation damage, serious water and soil erosion, lan
Jan 1, 2014
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation MethodBy G. Zhu
The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist
May 1, 2008
-
Uranium deposits South Limb of the Quirke syncline Elliot Lake, OntarioBy F. Q. Barnes
"Uranium, thorium and yttrium have been recovered, since the 1950s, from pyritic quartz-pebble conglomerates occurring in the basal sediments of the Quirke syncline at Elliot Lake. Gold, an element of
Jan 1, 1986
-
Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, TemiscamingueBy Louis R. Bernier
Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn
May 1, 2001
-
Substantiation of Coal Extraction Selective Technique Implementation in Flat Seams with Thickness of 0.5-0.8 MBy A Smirnov
The problem of thin and very thin coal seam extraction is examined in a long perspective of Ukraine?s fuel and energy industry development. The technical and economic benefits of the coal seam selecti
Aug 1, 2013
-
Novel Solution Injection Technology for In-Situ Leaching of Weathered Crust Elution-Deposited Rare Earth OresBy Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He
Weathered crust elution-deposited rare earth ore is a specific rare earth resource in China that is rich in middle and heavy rare earths. From surface to bottom, the weathered crust elution-deposit ra
Jan 1, 2014
-
Process Development for the Recovery of Critical Materials from Electronic WasteBy P. Keller, T. E. Lister, G. G. Clark, L. A. Diaz
As electronic technology continues to evolve there is a growing need to develop processes which recover valuable material from antiquated technology. This need follows from the environmental challenge
Jan 1, 2016
-
Influence of Rock Mass Anisotropy on Tunnel StabilityStress induced, gravity-assisted failure processes typically dominate long before stress levels approach the strength of the intact rock (at approximately smax > 0.4UCS where smax = 3s1 ? s3 and UCS i
May 1, 2009