Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • CIM
    Path Planning for Loading Operations by Wheel Loaders Based on Position Control of the Bucket

    By Shigeru Sarata

    A wheel loader is one of the main loading machines in open pit mines. The authors have been conducting research and development on autonomous operation of loading by a wheel loader. The most common lo

    Aug 1, 2013

  • CIM
    Technical and economic comparison of continuous and discontinuous loading in underground ore production and tunneling

    By Egon Berger

    "In recent years the trend in underground metal mining has been toward ever increasing blasts (often in excess of 100 000 tonnes per blast). The Canadian mining industry has been in the forefront of t

    Jan 1, 1989

  • CIM
    Location of pinnae e reefs in southwestern Ontario by gravity surveys

    By D. T. A. Symons, M. M. Kapnistos

    "Gravity profiles were established over five known Middle Silurian pinnacle reef s in Lambton County, southwestern Ontario. The profiles were approximately 3 km long, with stations every 60 m. Four fa

    Jan 1, 1980

  • CIM
    Separation of Arsenic and Recovery of Antimony and Tin from Silicate Slag in a Nonferrous Smelter

    By A. Iizuka

    This study was aimed at separating and recovering arsenic, antimony, and tin from refining byproducts generated in a nonferrous smelter. The target byproduct was a silicate slag containing the above e

    Jan 1, 2019

  • CIM
    The pneumatic vertical conveying of coal by pipeline

    By Tweedy. D. H.

    "The paper describes the rapid development of, and operational experience in the utilization of, pneumatic low-pressure pipeline hoisting systems to vertically convey raw coal and rock through shafts,

    Jan 1, 1982

  • CIM
    Process Engineering for the Freeforming of Al-Based Components using CSC-MIG Welding:

    By S. Brophy

    Controlled Short Circuit ? Metal Inert Gas (CSC-MIG) welding is a process that can be referred as a "Cold Welding" technology. The CSC process is based on accurate control of the welding wire position

    Jan 1, 2011

  • CIM
    Residues from the Zinc Industry – A Potential Future Resource for Silver and Indium

    By S. Steinlechner, S. Wegscheider

    "In the past, the metallurgical industry was most of the time dedicated on their main commodity, recovering base metals like zinc, copper or lead but leaving other valuable side elements in the genera

    Jan 1, 2016

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Mine Design and Planning Systems State-of-the-art and Future Trends

    By Mario A. Morin

    The last few years have seen considerable consolidation of the mining software industry and a trend towards greater planning and production control system integration, particularly for surface mines.

    May 1, 2004

  • CIM
    Numerical Analysis of Hard Rock Pillars using the Cohesion Weakening Friction Strengthening Model

    By H. Rafiei Renani, C. D. Martin

    "The Cohesion Weakening Friction Strengthening (CWFS) is adopted in numerical analysis to capture the observed progressive failure of hard rock pillars. As a case study, pillars at the Elliot Lake min

    Jan 1, 2015

  • CIM
    Status and Causes of Ecological Imbalance of Abandoned Ionic-Type Rare Earth Mine in South China

    By Deng Yang-wu, Zhang Yan, Chen Chun-fei, Luo Xian-ping, Luo Cai-gui

    This paper summarizes the ecological imbalance status of abandoned rare-earth element (REE) mines in southern China. These include large areas of vegetation damage, serious water and soil erosion, lan

    Jan 1, 2014

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    Uranium deposits South Limb of the Quirke syncline Elliot Lake, Ontario

    By F. Q. Barnes

    "Uranium, thorium and yttrium have been recovered, since the 1950s, from pyritic quartz-pebble conglomerates occurring in the basal sediments of the Quirke syncline at Elliot Lake. Gold, an element of

    Jan 1, 1986

  • CIM
    Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, Temiscamingue

    By Louis R. Bernier

    Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn

    May 1, 2001

  • CIM
    Substantiation of Coal Extraction Selective Technique Implementation in Flat Seams with Thickness of 0.5-0.8 M

    By A Smirnov

    The problem of thin and very thin coal seam extraction is examined in a long perspective of Ukraine?s fuel and energy industry development. The technical and economic benefits of the coal seam selecti

    Aug 1, 2013

  • CIM
    Novel Solution Injection Technology for In-Situ Leaching of Weathered Crust Elution-Deposited Rare Earth Ores

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Weathered crust elution-deposited rare earth ore is a specific rare earth resource in China that is rich in middle and heavy rare earths. From surface to bottom, the weathered crust elution-deposit ra

    Jan 1, 2014

  • CIM
    Process Development for the Recovery of Critical Materials from Electronic Waste

    By P. Keller, T. E. Lister, G. G. Clark, L. A. Diaz

    As electronic technology continues to evolve there is a growing need to develop processes which recover valuable material from antiquated technology. This need follows from the environmental challenge

    Jan 1, 2016

  • CIM
    Influence of Rock Mass Anisotropy on Tunnel Stability

    Stress induced, gravity-assisted failure processes typically dominate long before stress levels approach the strength of the intact rock (at approximately smax > 0.4UCS where smax = 3s1 ? s3 and UCS i

    May 1, 2009