Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    Refractories for aluminium melting and holding furnace

    By M. Spreij, M. Hogenboom

    Refractory lining performance of aluminium melting and holding furnaces and downtime due to refractory re-linings, are important parameters for increasing the aluminium output of a cast house and decr

    Jan 1, 2004

  • CIM
    Integrating Liner Profile Evolution and Mill Performance with 3D DEM Modelling (20135fb6-de8e-4fbf-965b-a913b3fa7428)

    By Nirmal Weerasekara, Jochen Franke, Malcolm Powell, John Favier

    Mill liners serve the dual purpose of protecting the shell from wear and transferring the rotary motion of the mill to an effective grinding action. As the liners wear, the efficiency of energy transf

    Jan 1, 2012

  • CIM
    Underground Mining of Thick Coal Seams

    "The success or failure of coal mining operations in Western Canada may hinge on the ability to extract thick coal under a variety of geological and mining circumstances and conditions. The paper pres

    Jan 1, 1972

  • CIM
    Bioflotation of Sarcheshmeh Copper Sulphide Ore

    By A. Eslami, H. Tabatabaei, M. Kolandoozan, Z. Manafi, A. R. Shahverdi, M. Noaparast, M. Oliazadeh

    Application of Acidithiobacillus ferrooxidans bacteria to flotation of Sarcheshmeh low-grade copper sulphide ore was studied. Sarcheshmeh low-grade ore contains pyrite, which causes some problems in t

    Jan 1, 2004

  • CIM
    New Brunswick ? Last But Not Least

    By R. D. Brown

    Ever since British Columbia started the ball rolling in 1974 with the introduction of its now-defunct Mineral Royalties Act, all Canada's resource-based provinces have significantly altered their

    Jan 1, 1977

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Computer-assisted geological interpretation and orebody modelling

    By A. C. Moerman, C. W. Pelley, K. R. Notley

    "The software package described in this paper facilitates the handling of diamond drilling information in the creation and maintenance of a geological information database. Once entered, the drilling

    Jan 1, 1988

  • CIM
    Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall

    By H. Warren Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    May 1, 2002

  • CIM
    Canadian Exploration Incentive Program

    By Robert B. Parsons

    "The Canadian Exploration Incentive Program (CEIP), which was announced by the federal government on May 3, 1988, promises to maintain the viability of flow-through shares as a financing mechanism whi

    Jan 1, 1988

  • CIM
    Biological pre-oxidation to enhance gold and silver recovery from refractory pyritic ores and concentrates

    By R. W. Lawrence, A. Bruynesteyn

    "Pre-oxidation of refractory pyritic concentrates by biological leaching to enhance the recovery of gold and silver in cyan ideation has been investigated. The results of laboratory tests on three con

    Jan 1, 1983

  • CIM
    Les Mines Selbaie Semi-Autogenous Grinding Circuit Expert System

    By M. Hall

    "SomarioEl circuito de molienda a Selbaie consta de molino semiaut6geno en un circuito cerrado y molino de balas en un circuito cerrado. El amperaje del motor de se usa controlar el tonelaje el molino

    Jan 1, 1994

  • CIM
    Investigation into Long-Term Strength of Brittle Rocks Based on Micromechanics

    By Z. S. Shao, X. Z. Li

    "Sub-critical crack growth plays an important role in long-term creep failure in brittle rock. Based on micromechanics established by using relationship between micromechanical wing crack growth model

    Jan 1, 2015

  • CIM
    Development of Gold-Sponge Catalysts for Lean-Burn DeNOx

    By Gary Pattrick

    A new class of spongy Au catalysts is studied for the selective catalytic reduction of NOx by propene under leanburn conditions. The spongy catalyst is an unsupported powdered Au that consists of micr

    Oct 1, 2003

  • CIM
    Deformation Behavior of AZ and AE Cast Magnesium Alloys at High Strain Rate Loading

    By H. Asgari, A. G. Odeshi, J. A. Szpunar

    In the present study, the dynamic response of AZ and AE cast magnesium alloys to shock loading, are compared for strain rates ranging between 900 and 1200 s-1. Texture measurements showed that after s

    Jan 1, 2014

  • CIM
    Experience with Rubber Mill Linings at Ecstall Mining by M. P. Amsden, Mill Superintendent

    By M. P. Amsden

    "Ecstall Mining Limited, a subsidiary of Texasgulf, Inc., Operates the Kidd Creek Mine, Concentrator and Zinc Plant at Timmins, Ontario. Two different ore types are mined and milled to produce concent

    Jan 1, 1974

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    A Study on Anti-Jerk Control of Building Maintenance Robot System

    By Seunghoon Lee

    The increase in the number of higher and larger buildings is expected to require the buildings' outer wall maintenance process, which includes cleaning, painting and monitoring, still depends on

    Aug 1, 2013

  • CIM
    Outlook for Blast Furnace Ironmaking

    By Joseph J. Poveromo

    The blast furnace today continues as the primary production method of hot metal in large-scale steel production. The blast furnace process has been the target of repeated attempts to replace it with v

    May 1, 2003

  • CIM
    CMIC-NSERC Footprints Project: A Roadmap for Large Project Development and Implementation

    By Alan Galley

    CMIC Mandate CIM Annual Meeting, Toronto, May 6, 2013 To increase mining research, innovation and commercialization efforts in order to strengthen Canada?s pre-eminent role as a global leader in min

    May 1, 2013