Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Theoretical Approach to the Evaluation of In-Situ Coal

    By K. W. Edwards

    The formulation of a theoretical basis for the evaluation of in-situ coal through the use of geophysical logs is outlined. This involved the development of an approach to the interpretation of resisti

    Jan 1, 1978

  • CIM
    Grinding Circuit Improvements at Barrick Cortez Gold Mine

    By James R. Wickens, David La Rosa, Robert E. McIvor, Adrian Dance

    "The comminution circuit at Barrick Cortez Gold Mine uses an open circuit primary jaw crusher followed by a standard SABC grinding circuit. The grinding circuit incorporates a 26’Ø x 11’ SAG mill, an

    Jan 1, 2009

  • CIM
    Management of Squeezing Ground Conditions at Laronde Mine

    By P. Turcotte, E. Karampinos

    "Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the

    Jan 1, 2015

  • CIM
    The Real Story of Tax Reform

    By R. D. Brown

    "Taxation tends to be a depressing subject. Taxes are unfair, taxes are too high and, above all, taxes are too complicated.In a recent address to the Canadian Tax Foundation, the author discussed in a

    Jan 1, 1976

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Potentiel du forage à I'aide des foreuses hydrauliques sur béquille - Contexte Canadien

    By Jacek Paraszczak, Stefan Planeta

    "RésuméDans la première partie de cet article on discute Ie contexte technico-économique de l'usage des foreuses à l'eau sur béquille dans des mines sud-africaines. Par la suite on présente

    Jan 1, 1995

  • CIM
    TOUGH-UDEC Simulator for the Coupled Multiphase Fluid Flow, Heat Transfer, and Deformation in Fractured Porous Media

    By J. Lee, K. B. Min, J. Rutqvist

    Shear slip of fractures in fractured rock masses is a critical issue for many geological engineering applications, such as the design of underground nuclear waste repositories, enhanced geothermal sys

    Jan 1, 2015

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Geological Mapping, Structural Problems and the Magnetometer

    By W. Keith Buck

    Introduction During World War II years, the magnetometer was used by various field parties of the Geological Survey of Canada, specifically in the search for chromite, a strategic war mineral. Throug

    Jan 1, 1951

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Experimental Research on Reduction of Granite Strength Induced by Microwave Irradiation

    By Jun Dai

    Based upon research findings from several countries, the combination of microwave and mechanical means to break hard rock holds promise for the future. To achieve this goal, it is essential to underst

    Aug 1, 2013

  • CIM
    Scale Model Study of Time Domain Electromagnetic Response of Tabular Conductors

    By A. Becker, C. Gauvreau, L. S. Collett

    "A scale model was designed to simulate the airborne Barringer INPUT time domain electromagnetic system. The amplitude of the response to a vertical conductive dyke varies considerably with the conduc

    Jan 1, 1972

  • CIM
    Telerobotic experiments for mining (8fd4a26a-5d34-4ad8-b4a0-4ac70eca96ab)

    "The application of telerobotics to mining is currently being introduced into production systems around the world. Mining companies in Canada, Sweden, South Africa, and Australia have tended to lead t

    Jan 1, 2005

  • CIM
    The Mobilization and Potential “In-Autoclave” Recovery of Gold during Pressure Oxidation and Leaching of Auriferous Sulfide Materials

    By J. -C. Parisien-La Salle, D. Blais, G. P. Demopoulos

    "In this work the dissolution, precipitation and adsorption behaviour of gold in acidic iron sulphate media containing small amounts of chloride ions is investigated via batch laboratory tests and OLI

    Jan 1, 2012

  • CIM
    Vision Zero ? The New Global Strategy for Safe Mining

    By Helmut Ehnes

    Over 330 million accidents at work happen world wide every year, only counting those leading to more than four days absence. More than 350,000 end fatal. Two million people more die every year due to

    Aug 1, 2013

  • CIM
    Environnement Minier: Gestion des Résidius Miniers et Restauration des Sites

    By Isabelle Demers, Audrey Jalce

    L’industrie minière génère chaque année une quantité considérable de rejets miniers, principalement sous forme de stériles ou de résidus de l’usine de traitement. Les stériles sont des roches sans val

    May 2, 2024

  • CIM
    TIG Welding of Single Crystal CMSX-4 Alloy

    By J. Dupre, A. Gontcharov, H. Pepin

    Produced by the conventional TIG welding CMSX-4 welds had been studied. It was demostrated that microstructure of welds depended on filler materials, welding parameters and joint design. Epitaxial sol

    Jan 1, 2006

  • CIM
    Efficient Scale Up Of Sensor Based Sorting Systems

    By J. Kolacz

    "A new sensor based sorting system has been developed, providing a possibility for laboratory scale testing and further scale-up of the separation results to the industrial operation. The new system c

    Jan 1, 2016

  • CIM
    Dust Control at the Cassiar Asbestos Primary Crushing Plant

    By F. J. MacPherson, A. C. Caron

    "Cassiar Asbestos Corporation Limited is at present B,C.'s only asbestos mining company, and has been actively engaged in the management and operation of the Cassiar Mine since the early 1950's. The C

    Jan 1, 1976

  • CIM
    Maximizing fuel cell test reliability

    By C. Andrews

    Fuel cell testing requires fully automated operation, on-site configuration of tests, and real-time monitoring for performance and failures. Balancing the flexibility and programmability of a test sta

    Jan 1, 2005