Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study of Re-Entry Time Post Blasting at Ciguha PT Antam Ubpe Pongkor Underground Gold Mine

    By P. H. Agson Gani, T. Sitorus, N. P. Widodo

    "PT ANTAM UBPE Pongkor underground mine use blasting to develop its tunnels which will cause poisonous and dangerous gases trapped inside mine. To analyze this case, a study of mine ventilation, the d

    Jan 1, 2019

  • CIM
    Processing Of Polymetallic Sulphides from Iberian Pyrite Belt

    By J. Gotor, C. Frias, E. Delgado

    The Iberian Pyrite Belt (IPB) is one of the world's largest reserves of primary sulphides containing base metals (Cu, Zn, Pb), precious metals and some special metals such as indium. Estimated re

    Jan 1, 2014

  • CIM
    A Simple Gravity-Recoverable Gold Test

    By Jason Clarke, André R. Laplante

    "The gravity-recoverable gold (GRG) ore characterization test was developed 15 years ago and has been applied to hundreds of ore samples. The test accurately determines the size distribution of GRG, a

    Jan 1, 2006

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • CIM
    The Key Tuffite, Matagami mining district: Origin of the tuff components and mass changes

    By W. H. MacLean, S. Liaghat

    Abstract- The Key Tuffite is a thick (0.3 m to 6 m) and laterally extensive (-10 km) cherty, sulfide-bearing tuff unit in Archean greenstones in the Matagami mining district in northwestern Quebec. It

    Jan 1, 1992

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Seismic Demands for Deep Tunnels and Shafts

    By F. Pinto, C. A. Prato, R. J. Rocca, P. F. J. Huerta Soaje

    "The seismic hazard for civil engineering structures is generally defined in terms of deterministic or probabilistic acceleration response spectra at an equivalent rock outcropping. The design of tunn

    Jan 1, 2015

  • CIM
    A Human Body Posture Sensor for Monitoring and Diagnosing MSD Risk Factors

    By A. Alwasel

    Musculoskeletal disorders (MSDs) threaten the wellbeing and livelihood of a large number of construction workers incurring a significant cost to society. We present a new method to monitor and diagnos

    Aug 1, 2013

  • CIM
    Recovery and of Uranium Steel

    The methods employed for the addition of uranium to steels and cast iron in the Physical Metallurgy Division are outlined. It has been found that the segregation of? uranium is a major problem in alum

    Jan 1, 1964

  • CIM
    The Otjikoto Gravity Circuit: Test Work, Design, Commissioning, and Operation

    By E. Barnard, J. Tero, J. Rajala, N. Avenido, M. Fullam, A. Nashitati, S. Mbalamba

    "The Otjikoto mining and milling complex is 90% owned by B2Gold Corporation, and began commercial operation on February 28, 2015. The milling circuit operates at a throughput 3.3 million tonnes per an

    Jan 1, 2018

  • CIM
    Using the Discrete-Element Method to Investigate Ball Milling Power Draw, Load Behaviour, and Impact Energy Profile (3f425fb8-db5a-45f1-9f1d-2e50996a242a)

    By M. B. Kime

    "Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load

    Jan 1, 2017

  • CIM
    Environmental Excellence In Exploration (E3)

    The Environmental Excellence in Exploration (E3) project is driven by the recognition that the minerals industry can only maintain its long term viability by ensuring its continued access to lands to

    May 1, 2002

  • CIM
    Risk Management Approach to Taphole Integrity at Olympic Dam Copper Smelter

    By F. Musuka, D. Jenkins, A. Keyes

    BHP Olympic Dam operates a Direct-to-Blister copper flash smelting Furnace (DBF) and an Electric Slag Cleaning Furnace (ESCF). Tapping blister copper from these furnaces via tapholes is a routine task

    Jan 1, 2019

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • CIM
    Possibilities and Limitations of Gravity Concentration as Applied to Pitchblende Ores at Port Radium, N. W. T.

    By E. B. Spice

    "IntroductionExperience at Eldorado has been gained with a variety of mill feeds. That is, the actual mode of occurrence of the pitchblende varies to such an extent that gravity concentration has at t

    Jan 1, 1950

  • CIM
    The Mechanical Aspects of Large Grinding Mills

    By C. A. Roloff

    Demands for increased grinding production, lower-grade are and limited capital have resulted in ever larger grinding mills, some as large as 36ft (/1 m) in diameter and 12,000 hp (8,950 kw). The resul

    Jan 1, 1979

  • CIM
    Comparison and Analysis of the Deformation Taken Place at the North Board of the Open Pit Copper Mine Asarel Registered by the Geotechnical Radar System Msr-300 and the Survey Landmarks

    By Kr. N. Karparov

    Measurements made with high precision GPS landmarks and geotechnical radar Reutech MSR- 300 associated with the observed movements in the north face of Assarel Mine, where on a horizontal distance of

    Aug 1, 2013

  • CIM
    Potential of Leading Indicator Data Collection and Analysis for Proximity Detection and Alert Technology in Construction

    By Eric D. Marks

    Fatalities resulting from ground workers colliding with objects and construction equipment accounted for approximately 18% of the total construction fatalities experienced in 2010. Current injury and

    Aug 1, 2013

  • CIM
    Engineering Challenges in Mining

    By C. E. White

    The depletion of higher grade mineral reserves will accelerate the trend toward production from progressively larger and lower grade deposits. The discovery of adequate reserves of leaner ores will re

    Jan 1, 1967

  • CIM
    A Touch of Froth: How Bubble-Particle Aggregates Take the Strain

    By Marco A. Vera

    "This paper investigates the froth function in flotation and the associated upgrading process. Flotation literature has revealed that one of the main functions of the froth phase is the cleaning of bu

    Jan 1, 2003