Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
History of Development and Organization at Flin Flon Mine, ManitobaBy W. A. Green
To those who may not be familiar with the history and organization of the Flin Flon mining property from the rime of its examination and option by the Harry Payne Whitney interests until the present s
Jan 1, 1930
-
Evcc ?croBy CRO CRO
Elk Valley Coal?s Cheviot Project is located in the Alberta foothills south of the town of Hinton. The mine has been in operation now for the 3 years. The start up and subsequent operation of the Ch
May 1, 2007
-
The interrelationship between Bond and Hardgrove grindabilitiesBy A. McIntyre, L. R. Plitt
Both the Bond and the Hardgrove grindability tests are widely used in the mineral industry to measure the ease of the comminution displayed by a material. The Hardgrove test is mainly used for coals,
Jan 1, 1980
-
Combining Sources of Rock Mass Characterization Data for Stope DesignBy Karina Forster
Open stope design depends on the ore body geometry, loading conditions and rock mass properties to estimate stope dilution and ground support requirements. Rock mass conditions for design primarily re
Jun 1, 2012
-
AG Milling with and Without Pebbles Recycle - Effect on Multi-Component Ore Deportment and ThroughputPalabora Mining Company (PMC) processes a multi-component ore body using a circuit consisting of two AG mills in parallel, closed with vibrating double deck screens and hydrocyclones. The bottom scree
Jan 1, 2012
-
Modifying the Design of Drying Chamber Flights of the Gol-E-Gohar Pelletizing Plant Ball MillBy S. Banisi, A. R. Hasankhoei, Gh. Parsapour, A. R. Ghasemi
At the Gol-E-Gohar mining and industrial Company, a pelletizing plant, which includes two parallel dry closed grinding circuits and a pellet production circuit, produces 600 t/h. Each grinding circuit
Jan 1, 2016
-
High Current Density Operation at Los Bronces Electrowinning PlantBy Gabriel Zarate
"Los Bronces had two ROM dump leach operations designated Leach I and Leach II. Leach I was commissioned in 1998 and stopped in 2014 due to the mine requirements. Leach II plant, commissioned in early
Jan 1, 2016
-
Optimized Process for Secondary and Low Grade Zinc Raw Material TreatmentBy A. Oja, M. Lahtinen, P. Salonen, B. Saxen
Most of the secondary and low grade zinc raw materials cannot be treated successfully by either conventional roasting - leaching - electrowinning (RLE) process or even by atmospheric direct leaching p
Jan 1, 2014
-
Evolution and Optimization of the Gravity Recoverable Gold Test (e99ef368-b956-4514-b763-0f43ee32fd51)By S. Koppalkar
ABSTRACT: The development and evolution of the gravity recoverable gold (GrG) test procedure at McGill university is reviewed in this paper. Since the late 1980s, the research group led by the late Pr
Jan 1, 2010
-
A Review Of 10 Years of AG/SAG Pilot TrialsBetween 1993 and 2003, a series of AG and SAG mill pilot plant trials were conducted using Hardinge Ical pilot plant scale SAG mills on numerous ore samples and ranging across a wide variety of operat
Jan 1, 2012
-
Block Stability Analysis of Left Bank Slope of Beihetan Hydropower Station in Jinshajiang River, ChinaBy G. Rong, W. Du
Stability of some potential unstable blocks in the left bank slope of Baihetan hydropower station is evaluated in this paper using the three-dimensional (3D) limit equilibrium method. The Baihetan hyd
Jan 1, 2015
-
Geophysical Investigation at Steeprock LakeBy Arthur Brant
STEEPROCK LAKE (Figure 1) lies about two miles north of Atikokan, a village approximately one hundred and forty miles west of Fort William and one hundred miles east of Fort Frances on the Canadian Na
Jan 1, 1940
-
From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet DevelopmentBy Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira
Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal
Jan 1, 2014
-
Leaching Kinetics of Iron in Atmospheric Direct Leaching of MarmatiteBy H. Zhu, Q. Jiang
The leaching kinetics of iron during the atmospheric direct leaching (ADL) of marmatite concentrate was studied under the following conditions: reaction temperature of 343-383 K, slurry pressure of 0.
Jan 1, 2014
-
Influence of Rock Mass Foliation on Impact-Induced Damage of an Ore Pass WallBy Kamran Esmaieli
This paper investigates the behavior of ore pass walls under impact loads caused by material transiting through an ore pass. In particular it considers the influence of foliation in the rock mass surr
Jun 1, 2012
-
Laboratory apparatus for measuring radon emanation from solidsBy M. P. Brameld, G. Archambault, R. H. McCorkell
"The rates. J. at which materials emit radon are of interest in studies of the sources of radon in mines. buildings. soils overburden and other places where it may indicate the location of ore or be a
Jan 1, 1981
-
Model for Fine Wet ScreeningBy S. Simukanga, J. Masinja, P. A. Bepswa, A. N. Mwale
Screening is an important operation in dry and wet closed circuit mineral processing applications. Most of the operations have seen the benefits of using fine wet screens in primary grinding sections
Jan 1, 2016
-
Extraction Behavior of Arsenic and Copper from an Enargite Concentrate in Catalyzed Atmospheric Leaching ConditionsBy O. G. Olvera, L. S. Quiroz-Castillo, P. J. Valenzuela-Guerrero, D. G. Dixon
The effect of sulfuric acid concentration on the extractions of arsenic and copper in the catalyzed batch leaching of an enargite concentrate was studied. The acid concentrations studied were 60, 45,
Jan 1, 2014
-
Summary of industrial minerals in New BrunswickBy DONALD E. BARNETT
Since the days of early settlement ew Brunswick has produced a variety of industrial minerals but it is perhaps only the recent discoveries of significant reserves of potash that have elevated the mea
Jan 1, 1984
-
Evaluation of Copper Losses Using Flow Patterns in the Cl-Furnace of the Mitsubishi ProcessBy H. Sakurai, M. Kato, F. Tanaka
The Mitsubishi Continuous Copper Smelting/Converting Process employs an electric furnace (CL- furnace) for settling the slag/matte mixture formed in the smelting furnace. The conditions in the CL- fur
Jan 1, 2019